| 1 | PART-I (Initial Rehabilitation) |
| 2 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of grith upto 300mm removal of stumps of such trees cut earlier and disposal of unserviceable materials by manual means andstacking of serviceab |
| 3 | Road - A |
| 4 | Road - B |
| 5 | Road - C |
| 6 | Road - D |
| 7 | Scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified materials with in all lifts and lead upto 1000 metres etc.complete. |
| 8 | Road - A |
| 9 | Road - B |
| 10 | Road - C |
| 11 | Road - D |
| 12 | Re-working of scarified bituminous surface suitable after supplementing base materials with sand & compacting finished surface as per Technical Specification & as per Clause - 601.8.3.2 of MoSRT&H Specifications for road & Bridge works (Latest Revision) |
| 13 | Road - A |
| 14 | Road - C |
| 15 | Road - D |
| 16 | Providing,& layingfollowing size metal as per MOST specification for IRC. WBM Gr-III metalling to a uniform thicknes of 100mm and packing the voids with small stones and hnd packing the same to proper camber including conveying and spreading moorum etc complete |
| 17 | WBM Gr-III |
| 18 | Road - A |
| 19 | Road - B |
| 20 | Road - C |
| 21 | Road - D |
| 22 | Providing Rainforced Cement Concrete of (1:2.5:5) with 20mm to 40mm size stone aggregate in foundations upto a depth of 1.5m below ground level and upto a height of 1.5m above ground level / bed level including cost and conveyance of all materials to site, and all labour charges complete as per direction of E.I.C. |
| 23 | KM Stone |
| 24 | Road - A |
| 25 | Road - B |
| 26 | Road - C |
| 27 | Road - D |
| 28 | 200m Stone |
| 29 | Road - A |
| 30 | Road - B |
| 31 | Road - C |
| 32 | Road - D |
| 33 | Reinforced cement concrete M15 grade Guard stone/local stone of standard design as per IRC:25 fixedposition including finishing and lettering but excluding painting as per drawing and Technical specification Clause 1704 of MORD. |
| 34 | Guard Post |
| 35 | Road - A |
| 36 | Road - B |
| 37 | Road - C |
| 38 | Road - D |
| 39 | Providing and fixing of Retro reflective cautionary, mandatory and informatory sign board as per IRC:67 made ofhigh intensity grade sheetingas per clause no 801.30 fixed over aluminium sheeting 1.5mm thick Supported on a mild steel angle iron post 75x |
| 40 | Information Board (800mmx 600mm) |
| 41 | Road - A |
| 42 | Road - B |
| 43 | Road - C |
| 44 | Road - D |
| 45 | 600 MM Circular |
| 46 | Road - A |
| 47 | Road - B |
| 48 | Road - C |
| 49 | Road - D |
| 50 | i) 900mm equilateral triangle |
| 51 | Road - A |
| 52 | Road - B |
| 53 | Road - C |
| 54 | Road - D |
| 55 | 600x600 mm |
| 56 | Road - A |
| 57 | Road - B |
| 58 | Road - C |
| 59 | Road - D |
| 60 | Construction of unreinforced plain cement concrete pavement of M-30 grade using 20mm down gradedstone aggregate in foundations upto a depth of 1.5m below ground level and upto a height of 1.5m above ground level / bed level including cost and conveyance of all materials to site, and all labour charges for construction of un-reinforced dowel jointed plain cement concrete pavement over prepared base etc. complete as per direction of E.I.C. |
| 61 | Road - B |
| 62 | Road - D |
| 63 | Providing Cement Concrete (1:2:4) with 12mm stone aggregate in foundations upto a depth of 1.5m below ground level and upto a height of 1.5m above ground level / bed level including cost and conveyance of all materials to site, and all labour charges complete as per direction of E.I.C. |
| 64 | Road - B |
| 65 | Road - D |
| 66 | Costruction of embankment with approved sellected earth material obtained from borrow pits with all leads & lifts transporting to site by mechanical means with a leads of 5 km spreading grading to required slope & compacting to meet requirement etc complete. |
| 67 | Road - A |
| 68 | Road - B |
| 69 | Road - C |
| 70 | Road - D |
| 71 | PART-III (Renewal) |
| 72 | Providing and apppying primer coat with bitumen Emulsion using emulsion pressure distributer at the rate of 0.20kg per sqm on the prepared bituminous/granular surface etc complete |
| 73 | Road - A |
| 74 | Road - B |
| 75 | Road - C |
| 76 | Road - D |
| 77 | Providing 37.5mm thick BUSG in one layers applying tack coat using 3.0 kg of bitumen /10 sqm, using 0.45 cum of25mm to 40mm size H.G. metal& 0.12 cum of 12mm size h.g. chips for 10 sqm . etc. complete. |
| 78 | Road - C |
| 79 | Road - D |
| 80 | Providing and apppying tack coat with bitumen Emulsion using emulsion pressure distributer at the rate of 0.30kg per sqm on the prepared bituminous/granular surface etc complete |
| 81 | Road - A |
| 82 | Road - B |
| 83 | Road - C |
| 84 | Road - D |
| 85 | Providing and laying semi dense bituminous concrete with batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder of 60/70 penetration grade of bitumen, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheelede, vibratory and tandem rollers to achieve the desired compaction as per Clause 508 of MoSRT&H Specifications for Road & Bridge works (4th Revision) |
| 86 | Road - A |
| 87 | Road - B |
| 88 | Road - C |
| 89 | Road - D |
| 90 | Part-IV(Emergency Work) |
| 91 | Road - A |
| 92 | Road - B |
| 93 | Road - C |
| 94 | Road - D |
| 95 | Part-II (Routine Maintenance) |
| 96 | 1st Year |
| 97 | BT Road |
| 98 | Road - A |
| 99 | Road - B |
| 100 | Road - C |
| 101 | Road - D |
| 102 | CC Road |
| 103 | Road - A |
| 104 | Road - B |
| 105 | Road - C |
| 106 | Road - D |
| 107 | 2nd Year |
| 108 | BT Road |
| 109 | Road - A |
| 110 | Road - B |
| 111 | Road - C |
| 112 | Road - D |
| 113 | CC Road |
| 114 | Road - A |
| 115 | Road - B |
| 116 | Road - C |
| 117 | Road - D |
| 118 | 3rd Year |
| 119 | BT Road |
| 120 | Road - A |
| 121 | Road - B |
| 122 | Road - C |
| 123 | Road - D |
| 124 | CC Road |
| 125 | Road - A |
| 126 | Road - B |
| 127 | Road - C |
| 128 | Road - D |
| 129 | 4thYear |
| 130 | BT Road |
| 131 | Road - A |
| 132 | Road - B |
| 133 | Road - C |
| 134 | Road - D |
| 135 | CC Road |
| 136 | Road - A |
| 137 | Road - B |
| 138 | Road - C |
| 139 | Road - D |
| 140 | 5th Year |
| 141 | BT Road |
| 142 | Road - A |
| 143 | Road - B |
| 144 | Road - C |
| 145 | Road - D |
| 146 | CC Road |
| 147 | Road - A |
| 148 | Road - B |
| 149 | Road - C |
| 150 | Road - D |