| 1 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. Including all taxes, material, T&P, Machinary, royalty, labour cess complete. Excluding GST as per direction of E/I. |
| 2 | Excavation for roadwark in soil with hydraulic excavation including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross section, and transporting to the embankment location within all lifts and lead upto 1000m. Including all taxes, material, T&P, Machinary, royalty, labour cess complete. Excluding GST as per direction of E/I. |
| 3 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. MORT&H Specification 401 Sr No 4.1. Including all taxes, material, T&P, Machinary, royalty, labour cess complete. Excluding GST as per direction of E/I. |
| 4 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Including all taxes, material, T&P, Machinary, royalty, labour cess complete. Excluding GST as per direction of E/I. |
| 5 | Providing and applying Prime coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.70 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. Including all taxes, material, T&P, Machinary, royalty, labour cess complete. Excluding GST as per direction of E/I. |
| 6 | Providing and laying dense graded bituminous macadam Grading 2 with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent (VG-30) by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 505 complete in all respects. Including all taxes, material, T&P, Machinary, royalty, labour cess complete. Excluding GST as per direction of E/I. |
| 7 | Providing and applying tack coat with VG-10 bitumen using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. MORT&H Specification 503 .Including cost of all material, labour, T&P, and all taxes complete but excluding cost of GST. |
| 8 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with VG-30 bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects.Including cost of all material, labour, T&P, and all taxes complete but excluding cost of GST. |
| 9 | Providing and laying Interlocking concrete block pavements having thickness 80 mm as per drawings and Technical Specification clause 1504. Including all taxes, material, T&P, Machinary, royalty, labour cess complete. Excluding GST as per direction of E/I. |
| 10 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. Including all taxes, material, T&P, Machinary, royalty, labour cess complete. Excluding GST as per direction of E/I. |
| 11 | Construction of un-reinforced, expansion and construction joint only, plain cement concrete pavement, thickness as per disign, over a prepared sub base with 43 grade cement or any other type as per Clause 1501.2.2 (Grade)(M-30) coarse and fine aggregates confirming to IS 383 maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weight batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints as per norms, applying debonding strips primer, sealant, near approaches to bridge/ culvert and construction, joints, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 including Cost of Polythene Sheet and also including complete shifting of matrials & Concrete etc. SOR 2014 (b). Including all taxes, material, T&P, Machinary, royalty, labour cess complete. Excluding GST as per direction of E/I. |
| 12 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Including all taxes, material, T&P, Machinary, royalty, labour cess complete. Excluding GST as per direction of E/I. |
| 13 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. Including all taxes, material, T&P, Machinary, royalty, labour cess complete. Excluding GST as per direction of E/I. |
| 14 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications RCC Grade M20 With Batching Plant, Transit Mixer and Manual placing. Including all taxes, material, T&P, Machinary, royalty, labour cess complete. Excluding GST as per direction of E/I. |
| 15 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. Including all taxes, material, T&P, Machinary, royalty, labour cess complete. Excluding GST as per direction of E/I. |
| 16 | Supply and fixing of 350 mm dia NP3 type Hume Pipe S&S in position including labour and T&P etc. required for proper completion of work. Including all taxes, material, T&P, Machinary, royalty, labour cess complete. Excluding GST as per direction of E/I. |
| 17 | Supply and fixing of 600 mm dia NP3 type Hume Pipe S&S in position including labour and T&P etc. required for proper completion of work. Including all taxes, material, T&P, Machinary, royalty, labour cess complete. Excluding GST as per direction of E/I. |
| 18 | Supply and fixing of 1000 mm dia NP3 type Hume Pipe S&S in position including labour and T&P etc. required for proper completion of work. Including all taxes, material, T&P, Machinary, royalty, labour cess complete. Excluding GST as per direction of E/I. |
| 19 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of cement concrete including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres. Morth Item No. 2.04 (ii) I (B) Brick Work. Including all taxes, material, T&P, Machinary, royalty, labour cess complete. Excluding GST as per direction of E/I. |
| 20 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical SpecificationSr No. 2.5 Ref No.202 RCC Structure. Including all taxes, material, T&P, Machinary, royalty, labour cess complete. Excluding GST as per direction of E/I. |
| 21 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications PCC Grade M15. Including all taxes, material, T&P, Machinary, royalty, labour cess complete. Excluding GST as per direction of E/I. |
| 22 | RCC M25 Providing concrete for Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications Clauses 802,803,1202&1203 Sr No. 12.5 Ref No.800. Including all taxes, material, T&P, Machinary, royalty, labour cess complete. Excluding GST as per direction of E/I. |
| 23 | Providing & Fixing of Weep Hole in abutment wall & retaining wall completed as per drawing & specification.including supply of all material, labour, T&P all taxes, labour cess etc. required for proper completion of work as per direction by the Engineer In-charge . Including all taxes, material, T&P, Machinary, royalty, labour cess complete. Excluding GST as per direction of E/I. |
| 24 | Back filling with fine sand behind abutment, wing wall and return wall complete as per drawing and Technical Specification including supply of all material, labour, T&P all taxes, labour cess, royalty etc. required for proper completion of work as per direction of Engineer In-charge . Including all taxes, material, T&P, Machinary, royalty, labour cess complete. Excluding GST as per direction of E/I. |
| 25 | Brick on edge pavement with straight over burnt brick on parties with bricks, laid dry joints filled with local earth of P.I. 5 to 7 including preparation of base to proper slope, and its ramming, spreading blinding coat of 1 cm. (3/8\") depth of local earth over the subgrade and including supply of all materials, labour Tools &plants etc. required for proper completionof the work. Including all taxes, material, T&P, Machinary, royalty, labour cess complete. Excluding GST as per direction of E/I. |
| 26 | Removing all type of Hume Pipes and Stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works. As per MORT&H Specification cluase 2.4(ix) C. Including all taxes, material, T&P, Machinary, royalty, labour cess complete. Excluding GST as per direction of E/I. |
| 27 | 05 years Maintenance Charge @ 2.5% Routine maintenance of road for 05 years after the completion of work vide GO No. - 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & Latter No. 36890C/RMC/Mool-23-24, Date 17.02.2024 of ENC PWD, Lucknow Rate Excluding Cost of G.S.T.Second year Maintenance Charge @ 0.25% |
| 28 | Third year Maintenance Charge @ 0.50% |
| 29 | Fouth year Maintenance Charge @ 0.75% |
| 30 | Fifth year Maintenance Charge @ 1.00% Please Enable Macros to View BoQ information |