| 1 | Suplying all materials, labours, T&P, 5.00 HP Diesel Pump set with POL, Pump Operator etc. and De-watering the clear water/muddy water etc all complete as per the required specification and direction of Engineer in charge. (Volume of water to be ascertained basing on bathymetric survey/ contour survey report) (Note:- Gravity flow drain-out of pond water has to be explored instead of 100% pumping by pump sets) Hire running charges for Pumps with 5 HP Disel Engine |
| 2 | Deweeding:-Uprooting rank vegetation and woods by digging the area to a depth of 60cm, removing all weeds and other growth roots by forking repeatedly beraking clods rough dressing flooding with water uprooting fresh growths after 10 to 15days and then fine dressing for planting new grass etc as per the required specification and direction of the Engineer-in-charge |
| 3 | Earth work in slushy soil (in water upto 0.6m depth requiring the aid of pans and vessels) within 50m. Initial lead and 1.5m initial lift as per the direction and specification of the Deparment. (measurement of the fill to be taken on the finished compacted section under OMC condition.) |
| 4 | Earth work in oridinary soil within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge. (measurement of the fill to be taken on the finished compacted section under OMC condition.) |
| 5 | Supplying all materials, Labour, T&P and Fine dressing of earthwork in odinary or hard soil in road/Embankment formation including cost of cutting of filling earth uplo 0.15m depth of surface etc all complete as per the required specifications and direction of Engineer in Charge (AoR-2006, Page no-7, item No.10) |
| 6 | Single under reamed pile foundation with RCC M20 using 12mm size black hard granite(Crusher broken) stone chips including cost of boring but excluding cost of MS/ Tor steel and labour charges for cutting, bending and binding of steel.300 mm dia and 6.00 mt long |
| 7 | Filling in foundatin and plinth with sand watered and rammed including all cost of materials, labour, conveyance, royalty, cess etc. complete |
| 8 | Cement concrete (1:3:6) with 40 mm size hand broken granite metal ( HB ) including all cost of materials, labour, conveyance, royalty, Tools and Plants water for curing etc.all complete,as per OPWD. specification required for the work to finished items of work. |
| 9 | R.C.C. work of M20 grade with 20 mm and down grade crusher broken hard granite chips including hosting and laying all cost of materials, labour, conveyance, royalty, Tools and Plants water for curing etc. all complete, as per O.P.W.D. specification required for the work to finished items of work |
| 10 | Supplying ,fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification. |
| 11 | RCC foundation, plinth band and footings bases of columns mass concrete, Drain walls & pre-cast slabs etc. |
| 12 | Transporting the excavated earth by Mechanical means within 5.00 Km lead , lift including loading & unloading etc all complete. |
| 13 | Add for other unforeseen Item such as Display Board & Photography etc |
| 14 | Add for Maintanance 3 % for 3 years Please Enable Macros to View BoQ information |