| 1 | Dismantling & Removal of ExistingFloor, wall Tiles,Sanitary Fixtures, Like flushing cistern, Wash basin, of all types (C.I./PVC/Vitreous China) Plumbing Line,including disposal of unserviceable materials with all lead and lift.Carting Trip etc.& Cleaning for Tiles Laying (Suit Room Wash Room) |
| 2 | Providing material and labour for laying Brick work using common burnt clay building Conventional bricks having crushing strength not less than 35 kg/Sq Cm in Super structure in Cement Mortar 1:5 (1- Cement : 5 -fine sand) in any shape and thickness including finishing, racking of joints, curing, scaffolding for all height all level etc. complete as directed by engineer-in-charge. |
| 3 | Providing material and labour for 15mm thick cement plaster in single coat on brick concrete wall surface for plastering finished even and smooth including curing scaffolding etc. complete in C:M 1:4 (1cement : 4 fine sand) and finished with floating coat of neat cement slurry also Fixing of GI mesh at all Horizontal & Vertical junction of RCC Column/ beam & Brick work as directions of Engineer-in-charge Complete. Above Plinth to |
| 4 | Providing & Applying 12 to 15 mm thick Plaster of Paris layers on wall plastered surface & surface of required or directed by Engineer-in-charge including hacking finishing smooth, with proper level & handed over a clean & neat condition complete. The finished surface should be smooth and in perfect level so as to avoid un evenness and ready to take on paint. complete the work should be done as per directed by Engineer-in-charge. |
| 5 | Providing Material and Labour with laying of 1200mm x 600mm Glossy/ MATT finished (Full Body Vitrified Tiles 8 to 10mm thk. As per Architect Selection) of approved shade in Wall Dado, skirting, risers of steps on 10 mm thick cement plaster 1:3 (1-Cement : 3-coarse sand) & by adhesive material (Polymer Chemical adhesive : Laticrete 325) including finished with flush pointing and jointed with Approved Epoxy Grout in 3-4 mm width and 10 mm Depth including cost of PVC Spacers, Rubbing, Cleaning etc. complete. |
| 6 | Providing Material and Labour and applying fibre reinforced elastomeric liquid water proofing membrane with resilient acrylic polymers having Sun Reflectivity Index (SRI) of 105 in three coats @10.76 litre/ 10 sqm. One coat of self-priming of elastomeric waterproofing liquid (dilution with water in the ratio of 3:1) and two coats of undiluted elastomeric waterproofing liquid (dry film thickness of complete application/system not less than 500 microns). The operation shall be carried out after scrapping and properly cleaning the surface to remove loose particles with wire brushes, Before starting treatment all crack need to fill in bare slab and it should be dust free, after treatment pond testing is must for 3-4 days should be The work shall be carried out all complete as per specification and the direction of the engineer-in-charge. The product performance shall carry guarantee for 10 years against any leakage.complete in all respect as per the direction of Engineer-in-Charge etc. complete. |
| 7 | Supply, checking, storing and fixing in position European water closet comprising of Wall hung European W.C. Pan , approved type of chairs,Concealed flushing cistern , Concealed Cistern with Flush plate or Equivalent or Equivalent as directed,C.P health faucet,with required length of flexible tube, clamp and bracket for fixing to wall,15 mm C.P. brass heavy quality angle stop cocks ,C.P. brass 2-way bib cock ,water closet cover and seat with C.P. hinges and rubber buffers,Fixing W.C. unit with brackets and accessories in position,Necessary pipe connection to PVC / PP / CI soilpipe,(Jaquar/Kohler/Hindware/etc.) |
| 8 | Providing and Head Shower Including all accessories as per details(Jaquar/Kohler/Hindware/etc.) |
| 9 | Providing & Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface: Water thinnable cement primer |
| 10 | Providing & Applyingwith Finishing of Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of Special primer applied @ 0.75 ltr/10 sqm |
| 11 | Providingandfixingfalse ceilingatallheightincludingprovidingandfixingofframe work made of special sections, power pressed fromM.S.sheets andgalvanized with zinccoatingof120gms/sqm(bothside inclusive)asperIS :277andconsistingof angle cleats of size 25 mm wide x 1.6 mm thick with flanges of 27 mm and 37mm, at 1200 mm centre to centre, one flange fixed to the ceiling with dash fastener 12.5 mm dia x50mm long with 6mm dia bolts, other flange of cleat fixed to the angle hangers of 25x10x0.50 mm of required length with nuts & bolts of required size and other end of anglehangerfixedwithintermediateG.I.channels45x15x0.9mmrunningatthe spacing of 1200 mm centre to centre, to which the ceiling section 0.5 mm thick bottom wedge of 80 mm with tapered flanges of 26 mm each having lips of 10.5 mm, at 450 mmcentretocentre,shallbefixedinadirectionperpendiculartoG.I.intermediate channelwithconnectingclipsmade outof2.64mmdiax 230mmlongG.I.wire at everyjunction,includingfixingperimeterchannels0.5mmthick27mmhighhaving flanges of 20 mm and 30 mm long, the perimeter of ceiling fixed to wall/partition with the help of rawl plugs at 450 mm centre, with 25mm long dry wall screws @ 230 mm interval, including fixing of gypsum board to ceiling section and perimeter channel with the help of dry wall screws of size 3.5 x 25 mm at 230 mm c/c, including jointing and finishing to a flush finish of tapered and square edges of the board with recommended jointingcompound,jointingtapes,finishingwithjointingcompoundin3layers covering upto 150 mm on both sides of joint and two coats of primer suitable for board, all as per manufacturer\"s specification and also including the cost of making openings forlightfittings,grills,diffuser,cutoutsmadewithframeofperimeterchannels suitably fixed, all complete as per drawings, specification and direction of the Engineer in Charge but excluding the cost of painting with :(12.5 mm thick tapered edge gypsum moisture resistant board) |
| 12 | Double Bed with fabric finish:Providing and fixing size - 2020mmL x 1780mm Wx 200mmH of bed base as per below mention sizesconstructedusing20mmthickBWRplyusingrequiredhardwoodbatons/ aluminium / wooden framework. Front & sides of the bed base to be finished with app veneer with polishing workas per approved sample. Cost to including making cutouts for ventilation, necessary support system, polishing onwooden sections, all consumables, nails, adhesive, making provision for fixing of ledge,wooden beading, lipping,margin,woodenbattens, makingprovisionforfixingofledge/shelf,wastage andallnecessaryarrangementsetc.allcompleteasperthe design,detaildrawing, specifications and instruction of Engineer In Charge. |
| 13 | Head Board Back paneling with wallpaper: Providing and fixing head Board back panelling madeoutwith12mmthkBWPplywoodand toincludeinstallationandcutoutfor Electrical switches if any as per detailed drawing and of all kinds of profilesand cut outs required for light fixtures. L- 2800 X 2100mm H |
| 14 | Providing& fixing of bed side table for Deluxe Rooms as per detailed drawings.The bed side table made out From MR grade plywood with required cutting & modification work proper in Line Level with inside fixing of 0.7mm thick laminate (Basic rate of laminate Rs.425/- per Sheet) with outside fixing of 04mm thick approved Shade veneer finish (Basic rate of veneer Rs. 85/- per Sq.Ft) with applying of approved shade melamine polish on veneer. The side table`s will having one drawer unit (soft close telescopic channel) with bottom side fixing of 75mm height skirting and above side table fixing of 12mm thick plywood Panelling (150mm x 500mm) with veneer finish with fitting of required hardware, material & labour etc work completed as per detailed drawings.Legs of table are considered powder coating/Ionised. - Size of side Table: L 500mm x D 450mm x H 525mm |
| 15 | Providing & fixing of wardrobe as per detailed drawings.The wardrobe made out From 19mm/12mm/06mm thick BWP 710 grade plywood with required cutting & modification work proper in Line Level with inside outside fixing of 04mm thick approved Shade veneer finish (Basic rate of veneer Rs. 100/- per Sq.Ft) with Edge side Pasting veneer Paper as per approved shade or matching with veneer (+/-) with applying of approved shade PU (matt/glossy) polish on veneer. The wardrobe`s will having Open able Shutter (Soft Close Auto Hinges) with inside fixing of 2 Tray & one drawer (soft close telescopic channel), Shelves with fitting of required hardware, material & labour etc work completed as per detailed drawings. size-1800mm W x 600mm D x 2400mm H |
| 16 | Providing & fixing of TV unit panelling with veneer finish as per detailed drawings.The TV panelling made out From 19mm thick MR grade plywood with required cutting & modification work proper in line and level with outside fixing of 04mm thick approved Shade veneer finish (Basic rate of veneer Rs. 85/- per Sq.Ft) with Edge side Pasting of veneer Paper as per approved shade or matching with veneer with applying of approved shade melamine (matt/glossy) polish on veneer.The TV unit`s panelling with having of niche as per detailed drawings with veneer finish with fitting of required hardware, material & labor etc work completed as per detailed drawings. L- 1220 X H- 2450mm |
| 17 | Providing & Fixing of VANITY COUNTER as per Detail Drawings.The VANITY COUNTER made out From 19mm/12mm/06mm Thick MR Grade Plywood With Required Cutting & Modification Work proper in Line Level with Inside Fixing of 0.7mm thick Laminate (Basic Rate of Laminate 425/- Rs per Sheet) with Outside Fixing of 04mm Thick Approved Shade Veneer Finish (Basic Rate of Veneer 85/- Rs per Sq.Ft) with Edge Side Pasting of PVC Edge band/Veneer Paper as per approved shade or matching with Veneer (+/-) with Applying of Approved shade Melamine (matt/Glossy) polish on Veneer. The VANITY Counters Will having Open able Shutter (Soft Close Auto Hinges) with Fixing of 2 Drawer (Soft Close Telescopic Chanel), Shelves with Fitting of Required hardware, material & labour etc Work Completed as per detail Drawings. -Marble on top size 1050 Lx600D x 850 mm |
| 18 | Luggage rack: Providing and fixingLuggage rackmade outof19mmthick plywood with 04 thick veneer installedCost to include the profile of the running resk as shown indetaileddrawingwithalledgestobesmoothfinish.sizeofluggagerack-size: 900mm W x 450mm D x 500mm H |
| 19 | Study Table with mirror Providing & fixing of study unit as per detailed drawings.The unit made out From 19mm/12mm thick MR grade plywood with required cutting & modification work proper in Line Level with inside fixing of 0.7mm thick laminate (Basic rate of laminate 425/- Rs per Sheet) with outside fixing of 04mm thick approved Shade veneer finish (Basic rate of veneer Rs. 85/- per Sq.Ft) with Edge side Pasting of veneer Paper as per approved shade or matching with veneer with applying of approved shade melamine (matt/glossy) polish on veneer. The study table`s will having two drawer unit (soft close telescopic channel) with fitting of required hardware, material & labor etc work completed as per detailed drawings.- Size of side Table: L 1070mm x D 600mm x H 770mm - without TOP StoneProviding & fixing of study unit`s MIRROR as per detailed drawings.The mirror made out from 06mm thick plain mirror with back side fixing of MR grade plywood (as a Back Support) with all side fixing of wooden Teak patch / strip including applying of polish with required Hardware, material & labor etc work complete in all respects.Size: L 590mm x H 1274mm |
| 20 | Study Chair: Providing and Supplying study Chair with wooden Base and Fabric as per details DWG. |
| 21 | Vanity Mirror: Providing and fixing in position of removable 6mm thick mirrorfor vanity counter,fixedon12mmthichBWPplyfixedonaluminiumframeworkofrequired section and thickness. Mirror to have frosted slit at vertical light coves. Vanity mirror to haveCosttoincludenecessaryframeworktoachieverequiredprofileincluding protective coating to mirror back, anti mist defogger, edge polishing, fixing mirror with clipsystem,siliconsealant,makingprovisionforlightfixtures,allconsumables, necessaryfixingarrangementetc.completeasperdetaildrawing,specificationand instruction of Engineer In Charge..750mm x 1050mm |
| 22 | DressingMirror:ProvidingandfixingDressingmirrorwithbacksidePlywood12mm baseCosttoincludenecessaryframeworktoachieverequiredprofileincluding protective coating to mirror back, anti mist defogger, edge polishing, fixing mirror with clipsystem,siliconsealant,makingprovisionforlightfixtures,allconsumables, necessary fixing arrangement etc. complete as per detail drawing, specification and as directed by Engineer In Charge. size: 500mm x1050mm |
| 23 | Providing and fixing curtains made out of fire rated fabric, with lining of blackout fabric along with another layer of sheer curtain including track system for each curtain as per manufacturer\"s specifications including stitching, installing etc., complete in all respects to the entire satisfaction of Engineer-in-Charge.Make of Fabric: WarwickMake of curtain track: Geo list (Netherlands) |
| 24 | Shower Cubical Partition With Door: Providing and fixing of Glass partitionpartition made of 10 mm thickclear Tempered glass finish of approved sample fixed with \"U\" channel on wall at one side, floor & Ceiling of approved size:2250 x 2400mm mm sample. All complete in line, level and plumb, including support system,\"U\" channel, , silicone sealants, anchoring system etc. all complete as per design, drawing &satisfaction of Project Manager. |
| 25 | Providing & fixing of plywood jamb as per detailed drawings. The jamb made out From 38mm + 38mm thick MR grade plywood with required cutting & modificationwork proper in Line Level with outside fixing of 04mm thick approved Shade veneer finish (Basic rate of veneer Rs.85/-per Sq.Ft) with Edge side Pasting of edge band/veneer Paper as per approved shade with applying of approved shade melamine (matt/glossy) polish on veneer. work completed as per detailed drawings engineer instruction. |
| 26 | Providing and Fixing Plywood Pelmet finish with 06mm thick MDF finish with paint as per details DWG orinstruction of Engineer In Charge. |
| 27 | Bedroom Accessory : Providing and supplying of fixing acrylic kettle tray set: 3pcsetwhite/black,bigtraywithsachetholder+servicetrayasperinstructionof Engineer In Charge. |
| 28 | Providing and supplying andfixing ofiron board:hotel standersfr silvercolor fabric, fold ableandadjustableheight,industrialgrademspowdercoatedframe,powder coatedblackcolorasperinstructionofEngineerInCharge.1200mmx375mmx 750mm |
| 29 | Providing,supplying and fixing of Philips iron: with steam or with steam and water spray or dryiron, as per selection architect and eng. Incharge |
| 30 | Providing, supplying and fixing of weighting scale:transparent and black base 150 kgs max, digital icd display as per selection |
| 31 | Providing,supplyingandfixingofwoodenregularhanger, asper instructionofEngineer In Charge. (As per Standard size available in market) * |
| 32 | Providing, supplying and fixing ofshaving mirror : wall mounted 200mm X75mmx 25mmx aa brass except SS base , as perselection architect eng.in change |
| 33 | Providing,supplyingandfixingofclassicmodeldoublecontainer350mlSOAP DISPANSERcapacity , as per instruction of Engineer In Charge. |
| 34 | Providing,supplyingandfixingof hairdryerfold ablestandaloneoncall ,asper instruction of Engineer In Charge. (As per Standard size available in market) * |
| 35 | Providing,supplyingandfixingoftoilettissuerollholderMakess304gradenon rust ableas per instruction of Engineer In Charge. |
| 36 | Providing, supplying and fixing of towel rack Make ss304 grade , non rust able available 24\", as per instruction of Engineer In Charge. |
| 37 | Providing,supplying and fixing ofclothes hook Make ss304 grade , non rust able , as perinstruction of Engineer In Charge. |
| 38 | Providing,supplyingandfixingofpillow protector-17\" x27\"quitedwithzip ,asper instruction of Engineer In Charge. |
| 39 | Providing,supplying andfixing ofMattress protector71\" x 79\" Lterry withtpu 100% water proof , as per instruction of Engineer In Charge. |
| 40 | Providing, supplying and fixing ofNapkin18\" x 21\" white stain band , as per instruction of Engineer In Charge. |
| 41 | Providing, supplying and fixingof floor matt 20\" x 30\" 300gms box border 100% cotton, as perinstruction of Engineer In Charge. |
| 42 | Providing,supplyingandfixing ofCushion30\"x18\"Hsd ,asperinstructionof Engineer In Charge. |
| 43 | Providing,supplyingandfixing ofbedrunner17\"x95\"colorjacquard,asper instruction of Engineer In Charge. |
| 44 | Providing, supplying and fixingofbath robe xl waffleor as per instruction of Engineer In Charge. |
| 45 | Providing, supplying and fixing ofNapkin rod of 15 inch on vanity black finish or as per instruction of Engineer In Charge. |
| 46 | Provide, supply & Fixing of safe locker ( Godrej) -12\" x12\" x 12\" or as per instruction of Engineer In Charge. |
| 47 | Providing and supplying of 304 Stainless Steel Kettle Black 1.2 Ltr |
| 48 | ABS Soap Dispenser 800ml |
| 49 | Paper Dispenser White (As per Standard size available in market) * |
| 50 | Room Round Waste Bin Black (220*255*0.4) |
| 51 | Providing and supplying of bed Rajayias per instruction of Engineer In Charge. (For Rooms bed) |
| 52 | Providing and supplying of 10\" thick Metteres king size as per instruction of Engineer In Charge. |
| 53 | Loose Furniture InG.F bedroomArea 2seaterSofa:Providingandfixing2seater sofa madewith wooden structurewith Highdensity foam and approvedshade fabric/leather all wooden surface finish with polish work as per instruction of Engineer In Charge. |
| 54 | Center Table: Providing and supplying Center Table/Coffee Table as per Details DWG. |
| 55 | Puffy: Providing and supplying Puffy as per design. |
| 56 | Providing and fixing aluminium skirting as per details dwg. |
| 57 | Providing and fixing photo frame as per approved by Engineer-in-charge |
| 58 | Electrical Work : providing and supplying and commissioning of electrical point with 10 ft length wire with switch board with plug light fitting extra. |
| 59 | Providing and supplying fixing Data Switch point. |
| 60 | Providing and supplying installing Data Wire. |
| 61 | Providing and fixing Telephone switch point. |
| 62 | Providing and supplying fixing Telephone wire installing. |
| 63 | Providing and fixing Door key tag Switch as per approved make. |
| 64 | Providing and supplying installing Channel Black Wire. |
| 65 | Providing Supplying & Fixing of Door Bell |
| 66 | ProvidingandfixingLamponBedsideTableasperdetailsdwgorinstructionof Engineer In Charge. |
| 67 | Providing and fixing Telephone Beetal C11 as per details dwg. |
| 68 | ProvidingandinstallingSMARTLEDTVsize:50\"asper instructionofEngineerIn Charge. |
| 69 | ProvidingSupplying & andfixingof Wall Mounted Split AC1.5 TR (DAIKIN/BLUESTAR/MITSUBISHI/etc.) |
| 70 | WALL MOUNTED ACRemote Controller |
| 71 | Drain/ Gas Pipe for AC |