| 1 | Ikw.kZ tek ;kstuk ds vUrxZr Fkkuk dqyigkM+ esa uohu Fkkuk ds vkoklh; Hkouksa dks ÅthZd`r djus gsrq mfpr {kerk ds VªkUlQkeZj ds lkFk lHkh vkoklh; Cykd ds fudV rd fo|qr ,y0Vh0 ykbu fuekZ.k dk dk;Z as per RESSPO Supply & Erection of Drawings/Estimate and as per direction of Engineer Incharge. Work includes all cartage/carriage, cost of labour,T&P, fitting and fixing of material supply by Contractor, commissioning and any other work which is required for completion of work. |
| 2 | Supply & Erection of Stone Pad |
| 3 | Supply & Erection of ACSR Weasel Conductor |
| 4 | Supply & Erection of ST Pole 11 Mtr. Long |
| 5 | Supply & Erection of D.P Clamp for Channel |
| 6 | Supply & Erection of 11 KV TPMO |
| 7 | Supply & Erection of 11 KV Fuse Set |
| 8 | Supply & Erection of Stay Complete |
| 9 | Supply & Erection of Earthing Complete |
| 10 | Supply & Erection of Chemical Earthing of TF |
| 11 | Supply & Erection of Eye Hook |
| 12 | Supply & Erection of Dead and Clamp |
| 13 | Supply & Erection of LT AB Cable(3X120+1X95+1X16) |
| 14 | Supply & Erection of 3 Phase DB Clamp |
| 15 | Supply & Erection of 3 Phase Distribution BOX |
| 16 | Supply & Erection of Suspension |
| 17 | Supply & Erection of All LUG 95 Sqmm |
| 18 | Supply & Erection of LT Cable 25 Sqmm for SMC Box |
| 19 | Supply & Erection of Piercing Connector for SMC Box |
| 20 | Supply & Erection of PG Clamp for SMC Box |
| 21 | Supply & Erection of LT XLPE Cable AL 120X1 Sqmm |
| 22 | Supply & Erection of Allcrimping Lug 120Sqmm |
| 23 | Supply & Erection of ST Pole Clamp LT |
| 24 | mDr dk;Z esa iz;qDr gksus okyh fuEu lkexzh Hk.Mkj dsUnz egksck }kjk miyC/k djkbZ tk;sxhA lkexzh dk fooj.k fuEuor gS& |
| 25 | Erection of M.S T-off Channel (Provided by the Dept.) |
| 26 | Erection of 11 KV Disc Insulator with Fitting (Provided by the Dept.) |
| 27 | Erection of 11 KV Pin Insulator with Pin (Provided by the Dept.) |
| 28 | Erection of 11 KV Disc Fitting (Provided by the Dept.) |
| 29 | Erection of MS Dropper Channel (Provided by the Dept.) |
| 30 | Erection of MS Top Channel (Provided by the Dept.) |
| 31 | Safe Caratage & Installation 250 KVA 11/4KV T/F (250 KVA T/F Provided by the Dept.) |
| 32 | Fencing of Tranformer for T/F including of first class brick sand cement & Iron material etc. As per RESSPO manual (all material shall be arranged by contractor) |
| 33 | Construction of new T/F Plinth Size 4x4x5 Fit. including of first class brick sand cement etc. As per RESSPO manual (all Civil material shall be arranged by contractor) |
| 34 | Concreting of Support PCC/ST Pole. including the cost of arrangement of labour & required material T&P etc for proper completion of work. |
| 35 | Concreting of Stay including the cost of arrangement of labour & required material T&P etc for proper completion of work. Please Enable Macros to View BoQ information |