|
| 1 | Supply of Cement Bag filled with local sand including all labour, T&P etc. S.No. 2 |
| 2 | Supply of Iron Washer. |
| 3 | Supply of Nariyal Rope 8 to 10 mm. dia for getting stay of pantoons at the time of errection and disconnection. |
| 4 | Supply of Kolkata sutli for mislanious use of errection and diconnection of pantoon bridge. |
| 5 | Supply of railing wire 10 mm. dia. |
| 6 | Supply of wooden Anchor for given proper alignment to pantoon bridge dureing operation period. |
| 7 | Supply of Iron J Hook |
| 8 | Supply of Eucliptus ballies 4\" |
| 9 | Supply of Eucliptus ballies 6\" |
| 10 | Supply of Powal in bundel |
| 11 | Supply of large bamboos 7.5 cm dia |
| 12 | Supply of Small bamboos 5 cm dia |
| 13 | Supply of pp rope (ISI Mark) |
| 14 | Railing wire clamp carage & all local taxes included |
| 15 | Heavy Repair by Iron sheet/minor repair by Iron sheet patches of damaged pantoon with welding including all complete. |
| 16 | Construction of Gang Hut at babain ghat and making barriar both side |
| 17 | Cartage of following material from gang hut to place of pantoon bridge I/C loading unloading & carriage and all T&P etc. distance 3 Km. average. S.No. 11 Miscelenanious Material |
| 18 | Errection of Pantoon Bridge at Babain Ghat. |
| 19 | Carriage and laying of sal sleeper of edging including loading, unloadig, cost of carriage etc. S.No. 6 |
| 20 | Mallah for watching during working condition |
| 21 | Carriage and laying of R.S. Joist 5 mtr. Long including loading, unloadig, cost of carriage etc. S.No. 8 |
| 22 | Cartage and Laying of chequered plate including loading, unloading cost of carriage etc. S.No. 2 |
| 23 | Small boat with Mallaha required for errection of pantoon bridge doiring construction |
| 24 | Carriage and laying of sal sleeper including loading, unloadig, cost of carriage etc. S.No. 7 |
| 25 | Fixing of Railing wire through hole of railing and hole of virtical post and making wire stay of each road. S.No. 3 |
| 26 | Laying of wooden anchor in the river on the up stream/down stream side of the pantton bridge side including their viewing,packing the sand.S.No-6 at every 20m |
| 27 | Extraction wire rope from railing post and making roll complete work. |
| 28 | Local Shifting of railling post from Yamuna river bank at pantoon bridge site including loading unloading at the store site complete work |
| 29 | Opening of the MS plate and Nut Bolt for Chequered plate |
| 30 | Two row chequerred plate road |
| 31 | Additional Hulage of Pantoon in river approx 5 to 6 km (24 pair Pantoon) |
| 32 | Small boat with Mallaha required for errection of pantoon bridge doiring working Condition |
| 33 | Cartage of different material and extraction of vertical piles pigs with the help of tripot and chain pully and cartage of material from the place of bridge to gang hut I/E is I/C loading, unloading carriage and stacking in store. |
| 34 | Dismentling of chequried plate road and lifting of chequired plate laying in the alignment of road for loading unloading at the store site |
| 35 | Cartage of pantoon after dismentling from bridge laying in dry bed/shallow water, rolling shifting 0.500 km distance upto river bank. |
| 36 | Extraction wire rope from railing post and making roll complete work. |
| 37 | Local Shifting of railling post from Yamuna river bank at pantoon bridge site including loading unloading at the store site complete work |
| 38 | Local Shifting of RS Joist at the river bank pantoon bridge site including loading, unloading labour upto site complete work |
| 39 | Local Shifting of Sal sleeper with in from Yamuna river bank at pantoon bridge site including loading unloading at the store site complete work |
| 40 | Local Shifting of Sal eding with in from Yamuna river bank at pantoon bridge site including loading unloading at the store site complete work |
| 41 | Opening of the MS plate and Nut Bolt for Chequered plate |
| 42 | Maintenance of pantoon during rainy season extra mallaha (Four Month) |
| 43 | Small boat with Mallah required for maintainance of pantoon during rainy season.(One Nos. for three time mallahs in rainy season) SI N0-22(i) (Four Month) Please Enable Macros to View BoQ information |