| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of Dismantling Brick / Tile work including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres As per Clause 202 |
| 2 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of reinforcement cement concrete, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres As per Clause 202 |
| 3 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. |
| 4 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing. |
| 5 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.(PCC Grade M20) |
| 6 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.(RCC Grade M25 in foundation) |
| 7 | Plain/Reinforced Cement Concrete for wall & slab etc. complete as per Drawing and Technical Specifications.(RCC Grade M25 in superstructure) |
| 8 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in foundation complete as per Drawing and Technical Specifications. |
| 9 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia PVC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing foce. Complete as per drawing and Technical Specifications |
| 10 | Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification. |
| 11 | Drainage spouts as per drawing & Technical Specification, as per MORT&H specification 2705 |
| 12 | Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification. |
| 13 | Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. |
| 14 | Providing and laying Flooring complete as per drawing and Technical specifications laid over cement concert bedding. |
| 15 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. |
| 16 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 |
| 17 | Laying NP-3 pipe RCC concrete pipe for culvert on first class in single row including fixing socket with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 2900. |
| 18 | Removing all type of Hume Pipes and Stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works. |
| 19 | Filling empty cement bag & placing in position including cost of all material, labour, T&P, labour cess, all taxes complete. |
| 20 | Providing, laying, spreading and compacting stone aggregates of specific sizes 45-63 to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. |
| 21 | Providing, laying, spreading and compacting stone aggregates of specific sizes 22.4-53 to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. |
| 22 | Providing and applying primer coat with SS-2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means. |
| 23 | Providing and applying tack coat with bitumen VG-10 grade using bitumen pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. |
| 24 | Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using Viscocity grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable hot mix plant of appropriate capacity not less than 200 tonnes/hour, laying and rolling with a smooth wheeled roller, finished to required level and grades. |
| 25 | Providing and laying of premix sand seal coat with HMP of appropriate capacity not less than 75 tonnes/ hours using crushed stone chipping 6.7 mm size and penetration bitumen of suitable grade. Note - 1- Rates are inclusive of all taxes but excluding GST which shall be paid extra as applicable 2- Labour cess @ 1% will be deducted from contractor\"s bill at the time of payment Please Enable Macros to View BoQ information |