Sales : +91-777 804 8217
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 29-12-2025 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 05-01-2026 |
| 2 | 13-12-2025 | Revised BOQ | BOQ | 29-12-2025 |
| Sl. No. | Item Description |
| 1 | Providing services for operation of 22 KV sub station at AFS Station by employing one electrician for three shift per day(Elect) each shift of 08 hrs (from 0600 to 1400 hrs, 1400 to 2200 hrs and 2200 to 0600 hrs) including operatin of electric driven pump sets along with periodical maintenance like cleaning, greasing,oiling and repairing of all leakages for bearing, suction/delivery/foot valave, making proper electric connection and priming system to pump set etc complete all as directed by Engineer-in-Chagefor following type/capacity and make of pump/DG sets all as specified and as per detail given in perticulars in specifications. (a) Air force stationpump house - Centrifugal pump sets 12 ltrs/second driven with electrical motor12.5 HP capacity,3 Phase, 415 V, 1450 RPM Make-Kirloskar-02 Sets. (b) DG set.50 KVA 1500 RPM, Make-Kirloskar-01. (c) Chloronome plant 200 gram/Hrs capacityt and Electrician will attend all the electrical complaints complete all as specified and as directed by Engineer-in-Chage.Note:-1. Contractor should provide safety shoes,one pair of uniform,helmet,safety glasses &safety gloves ,travelling charges etc for each working operator2.Contractor should provide torch light,grass cutting blade,01 No .axe,first aid box etc for each plant.3. The Employed labours are wholely responsible forarea cleaning i.e grass removing, complete cleaining of plant rooms and other task given by JE/Engr In Charge. |
| 2 | Excavatioin in trenches not exceeding 1.5 m wide and not exceeding 1.5 m in depth and taking out soft/loose soil for laying of cable /erection of pole/stay pit excavation |
| 3 | All as per item No 2 here-in-before but in hard/dence soil |
| 4 | M&L for crushed stone sand for cable cushoining laid in trenches for protection of cable |
| 5 | M&L for Returning and filling including spreading levelling watering and well ramming in layers not exceeding 25 cm |
| 6 | M&L for Removing excavated material not exceeding 50 m and depositing where directed by Engineer-in-Chage at a level not exceeding 1.5 m above the starting point |
| 7 | Supply and laying factory cast, unreinforced precast concrete cable cover factory made embossed the mark “LT CABLE” class LV type1 flat size 250x150x40 mm laid in trenches as specified and as directed by Engineer-in-Chage. |
| 8 | Taking out under ground 1.1 KV (E) Grade LT cable of size upto 35sqmm 3.5 Core frompole/trenches/walls / ducts etc., for carrying out repairs , relaying, rerouting, laying back through same / different route after carrying out repair / issue under schedule of credit all as directed by Engineer-in-Chage at site. |
| 9 | All as per Sl Item No 08 Here-in-before but of size 50 Sqmm to 95 Sqmm 3.5 Core |
| 10 | All as per Sl Item No 08 Here-in-before but of size 120 Sqmm to 185 Sqmm x 3.5 Core |
| 11 | Supply laying and testing cable XLPE insulated screened beded,galvanized steel trip or wire armoured, electric power cables (heavy duty) 1100 Volt grade wiyh stranded aluminium conductor of size 25 sq mm 3,1/2 core. Including taking down old unserviceable cable any size by dismantling of all electrical connection etc all as directed by Engineer-in-Chage. |
| 12 | All as per item no 11 here-in-before but of size 50 sq mm 3,1/2 core. |
| 13 | All as per item no 11 here-in-before but of size 70 sq mm 3,1/2 core. |
| 14 | All as per item no 11 here-in-before but of size 185 sq mm 3,1/2 core. |
| 15 | S&F in replacement of MCCB 415 Volt 16 KA, 4 Pole160A, 36KA. Complete all as specified and directed by Engineer-in-Chage |
| 16 | S&F in repairs MCCB FP 200 Amps 36kA 415 V , with adjustable thermal and adjustable magnetic release, Complete all as specified and directed by Engineer-in-Chage. |
| 17 | All as per item No. 16 above but 250A, 36KA. Complete all as specified and directed by Engineer-in-Chage |
| 18 | All as per item No. 16 above but350A, 36KA. Complete all as specified and directed by Engineer-in-Chage |
| 19 | Receiving complaints from JE incharge lodged by the user/occupants of electrification nature, rectification of the fault as per the compaint lodged by the user onward KWH meter in respect of main distribution board having switch board, fused, MCB distribution board in sheet metal enclosure, point wiring fixture for light/fan /bell /light or power sockets, metal clad plug socket complete repair to the extend by removing connections from the system, removing faults in (surface /concealed) wiring/ circuits,sunken boxes, Junction boxes, main switches, MCBs/DBs any type of utility light fittings, lamp holders, AC ceiling fan/exhaustfans and other connected fixtures of internal electrification including providingstores such as wires of appropriate sizeand conductor matchingto existing one upto the height of 2 mtr, insulation tape, screws, nuts as per the site requirement to rectify the fault with regard to complaint lodged and refixing of fitting and fixture to their original position as dismentledcomplete all as directed by Engineer-in-Chage at site to the entire satisfaction of Engineer -in- Charge. Note :(i)Any complaint which is left out/unattendent 1 days by the electrician by any reasons the same to be communicated to the JE incharge /AGE E/M with reason. (ii)New material/stores provided for completing the job shall be measured and paid for separetely under relevent items of sch \"A\". (iii)Contractor shall provide the all type ofT & P to each electricianfor attending the internal electric complaints. (iv)Contractor shall provide the complaint register and complaint slip serially numbered in duplicate as per sample.If complaint received online the contractor should provide A4 size paper and printer for printing complaints. The rate of such items included in this items. (v) Any unattended complaints not done in specified time limit. The contractor shall penalty Rs. 200/- on each complaints per day is applicable. (vi) Two complaints will be treated as one complaint in same building/same Quarter on same day. |
| 20 | Supply only in replacementswitch piano type 5 Amps one wayAC 230 Volts. |
| 21 | Supply only in replacementswitch pianotype5 Amps two way AC 230 Volts. |
| 22 | Supply only in replacement of bell push5 Amps, AC 230 Volts. |
| 23 | Supply only in replacement switch/socketcombination outlet 3 pin 5 Amps flush type (Multi purpose) piano type AC 230 Volts. |
| 24 | Supply only in replacement switch/socketcombination outlet 2 in 1, 3 pin5 Amps and 15 Ampflush type (Multi purpose) piano typeAC 230 Volts. |
| 25 | Supply only in replacement of electronic dimmers, 450W, 250V flush type on the exiting phenolic laminated sheet etc. as reqd. |
| 26 | Supply only in replacement of stepped type electronic fan regulator,flush type on the exiting phenolic laminated sheet etc. as reqd. |
| 27 | Supply only in replacementswitch modular type 6 Amps one wayAC 230 Volts. |
| 28 | Supply only in replacementswitch modular type 16 Amps one wayAC 230 Volts. |
| 29 | Supply only in replacementmodular type bell push 6 Amps,AC 230 Volts. |
| 30 | Supply only in replacementmodular type socket 6 Amps 2/3 pin combined,AC 230 Volts. |
| 31 | Supply only in replacement modular type socket 6/16 Amps 2/3 pin combined,AC 230 Volts. |
| 32 | Supply only in replacementmodular type fan regulator,AC 230 Volts. |
| 33 | Supply only in replacementmodular white cover plate with frame,2 module. |
| 34 | Supply only in replacementmodular white cover plate with frame,4 module. |
| 35 | Supply only in replacementmodular white cover plate with frame,8 module. |
| 36 | Supply only in replacement of ceiling rose 65x50mm twoto three terminal AC 230 volts complete all as specified. |
| 37 | Supply only buzzer,AC, 230 volts, single phase. |
| 38 | Supply only bell, ding dong, AC, 230 volts, single phase. |
| 39 | Supply only bell multi music type AC, 230 volts, single phase. |
| 40 | Supply only in replacement lamp holderinsulated body with back platebatten/angletype for batten fittings. |
| 41 | Supply only in replacement sheet metal enclosureswith plug socket single pole and neutral with two pin and earth plug and with one MCB of 20 Amps (SP)complete all as specified. |
| 42 | Supply only in replacement cable flexible PVC insulated twin core with copper conductor of size 23/0.0076 |
| 43 | Supply only in replacement cable flexible PVC insulated twin core with copper conductor of size 40/0.0076 |
| 44 | Supply only in replacement plug top 3 pin 5 amps AC 230 volts. |
| 45 | Supply only in replacement plug top 3 pin 15 Amps AC 230 volts. |
| 46 | Supply onlyPVC connector block two ways AC 230 volts suitable for fan/tube light fittings etc. |
| 47 | Supply only bakelitesheet not less than 3mm thick for mounting of switch sockets, fan regulators, etc. size 100x100mm or PVC rectangular Box of 100 mm x 100mm and 50 mm deep complete with screws and washers, etc. all as specified and directed by Engineer-in-Chage |
| 48 | Supply onlybakelitesheet not less than 3mm thick for mounting of switch sockets, fan regulators, etc. size 175x100mm or PVC rectangular Box of 175 mm x 100mm and 50 mm deep complete with screws and washers, etc. all as specified and directed by Engineer-in-Chage |
| 49 | Supply onlybakelitesheet not less than 3mm thick for mounting of switch sockets, fan regulators, etc. size 250x200mm or PVC rectangular Box of 250 mm x 200mm and 50 mm deep complete with screws and washers, etc. all as specified and directed by Engineer-in-Chage |
| 50 | Supply onlybakelitesheet not less than 3mm thick for mounting of switch sockets, fan regulators, etc. size 200x150mm or PVC rectangular Box of 200 mm x 150mm and 50 mm deep complete with screws and washers, etc. all as specified and directed by Engineer-in-Chage |
| 51 | Supply only in replacementMCB SP, 6 to 32 Amps 10 KA single pole AC 230volts complete all as specified |
| 52 | Supply only in replacementMCBSPN 6 to 40Amps 10 KAAC 230volts complete all as specified |
| 53 | Supply and fixingbrass/copper thimble (lugs) bottle type suitable for MCBs with sub circuit wirescomplete all as specified |
| 54 | Supply only in replacement of rigid non metalic PVC conduit conduct including junction boxes terminal, tees bends, elbows reducers, bell mouth tube ends and fixing accessories such as complete, lock nuts, saddles pipehook etc ofsize 20mm dia. completeall as specified and directed by Engineer-in-Chage |
| 55 | Supply only inreplacementtwinsub maincable with 2 x 4 Sqmm multistrand PVC insulated unsheathedcopper conductorPVC cable including contineous earth wire 1 x 4 Sqmm copper conductor insulatedunsheathed complete all as specified and directed by Engineer-in-Chage by Engineer in charge as following:-(a) In PVC conduit(20mm) |
| 56 | All as per Item No 55 here-in-before (b) In PVC casing caping(25mm) |
| 57 | All as per srl item No 55 here in before but 2 x 6 sqmm copper cable as a sub main and 1 x 6 sqmm cable as a earth lead complete all as specified and directed by Engineer-in-Chage by Engineer in charge.(a) In PVC conduit(20mm) |
| 58 | All as per Item No 58 here-in-before (b) In PVC casing caping(25mm) |
| 59 | Point wiring with 1.5 Sqmm (nominal area) copper conductorcable (Multi strand) PVC insulated and unsheathed in and incl PVC casing caping of adequate size with 3mm thickplastic laminated sheet cover ofadequate size for one light or one fan /05 amp socket /bell controlledby one switch incl 1.5 Sqmm (nominal area) copper conductor cable (multi strand) PVC insulated and unsheathed with colour code earth wire to common earth dolly complete all as specified. |
| 60 | All as per srl item No 61 here in before butwith 2.5 sqmm copper conductor cable (multistrand)complete all as specified and directed by Engineer-in-Chage |
| 61 | Supply only in replacement of sheet metal enclosure (Factory made) double door shutter type for distribution board (when MCBs are to be used) single pole and neutral 240 volts 8 way with 200 Amps rated busbar all as specified |
| 62 | All as per srl item No 63 here in beflore but 4 way SPN with 200 amps rated bus bar all as specified |
| 63 | All as per srl item No 63 here in beflore but 4 way TPN415 voltsall as specified |
| 64 | Supply only in replacement MCB TPN, 415 Volts, 63 Amps all as specified. |
| 65 | Supply only in replacement PVC casing caping and fixing accessories such as complete, lock nuts, saddles hook etc of adequate size complete all as specified and directed by Engineer-in-Chage |
| 66 | Supply and fixing in replacementspring loaded rotary type bipin holder suitable for LED tube light fittings. |
| 67 | Supply only in replacement ofLED round shape 15 watt 220 volts AC recessed type with high efficacy PMMA diffuser soft glare free light complete with drivers, clamps and suitable size as per ground requirement complete with all accessories internally pre-wired and including connecting up with twin core twisted flexible copper conductor cable with suitable size. |
| 68 | Supply only in replacement ofLED bulkhead 12 watt 220 volts AC with cast aluminium housing,polycarbonate diffuser IP65 complete with all accessories internally pre-wired and including connecting up with twin core twisted flexible copper conductor cable with suitable size. |
| 69 | Supply only in replacement ofLED Square shape 15 watt 220 volts AC recessed type with high efficacy PMMA diffuser soft glare free light complete with drivers, clamps and suitable size as per ground requirement complete with all accessories internally pre-wired and including connecting up with twin core twisted flexible copper conductor cable with suitable size. |
| 70 | Taking down carefully copper/aluminium point wiring (light, fan, socket or power) complete,(fittings such as switches, ceiling roses, pendants, regulators sockets etc. to be measured separately), removing materials to store for keeping in safe custody for issue under Schedule of credit and making good disturbed surfaces of walls, floors, etc. |
| 71 | Taking down MCB DBs/ SFUs |
| 72 | M & L for point wiring with 1.5 sq mm single core FRLS PVC insulated cable 1100 V grade with multistranded copper conductor drawn through PVCcasing and capping with all accessories fixed to wall /roofs ceiling etc and incl provision of 1.5 sq mm PVC insulated and unsheathed copperconductor as earth continuity conductor and connected to common earth dolly incl fabricated steelterminal box made out of 1.6 mm thick MS sheet concealed in the wall with 3 mm thick laminated sheet top cover / PVC Switch Board mounted on wallfor mounting the switches , socket outlets , fan regulators etc all as s specified and directed by Engineer-in-Chage for following. (a) One light/Fan point controlled by one switch. |
| 73 | All as per item No 74 here-in-before (b) One socket 3 pin outlet 5 amp on independent board. |
| 74 | All as per item No 74 here-in-before (c) One 3 pin socket outlet 5 amp on the same board board with other switches. |
| 75 | All as per item No 74 here-in-before (d) One bell/buzzer point controlled by one push button on the same board with other switches or independent with cable 1.5 sq mm size. |
| 76 | All as per item no 3 above but with copper conductor cable for one 3 pin socket outlet 15 amp independent board with cable 2.5 sq mm. |
| 77 | S&F in repairs switch piano flush type single pole one way 5 amp. |
| 78 | S&F in repairs ceiling rose three terminal/PVC polycarbonate, isolated body complete all as specified. |
| 79 | S&F in repairs switch socket combination 2 in 1, 3 pin 5/15 amp flush type.. |
| 80 | S&F in repairs switch socket combination 2 in 1,5 amp flush type. |
| 81 | S&F in repairs socket outlet 2 in 1, 3/5 pin 5 amp multi purpose, flush type. |
| 82 | S&F in repairs switch bell push, flush type 5 Amp. |
| 83 | S&F in repairs bell, Multi music type AC, 230 Volts single pole. |
| 84 | S&F in repairs fan regulator electronic step type complete all as directed by Engineer-in-Chage at site. |
| 85 | Labour only for taking down and refixingwith repairs to Ceiling Fan with Fan regulator, Exhaust Fan,anyMake & any Sweep Oiling, Greasing , removing all dust with paintingand Rewinding of fan by super ennameled copper insulated wire as per existing gauge, varnishing, heating assembling and testing for serviceable condition complete all as directed by Engineer-in-Chage |
| 86 | S&F in repairsLED tube rod for LED Tube light fitting 18 Watt , complete with all accessories complete all as required at site and as directed by Engineer-in-Chage by Engineer -in-Charge. Cat No SZFRTMX020 of Shakti or equivalent of Havell\"s/Philips / Wipro/Bajaj |
| 87 | S&F in repairsBattenfor LED Tube light 18 Watt fitting prewireed upto terminal block complete with all accessories and connecting up with twin core / .0076 flexible copper wire with and including LED tube light fixed on two nos PVC round / square mounting blocks complete all as required at site and as directed by Engineer-in-Chage. Cat No SZSRFOC1x20 of Shakti or equivalent of Havell\"s/Philips / Wipro . |
| 88 | Supply only LED luminaire 600 x 600mm, 36 watt, 220 volts AC recessed/ surface type fittings, epoxy powder coated CRCA sheet housing with electronic driver, connector block, etc. complete with all accessories internally pre-wired and including connecting up with twin core twisted flexible copper conductor cable with suitable size. Cat Part No- SZRSRMX036-IC of Shakti/ Halonix/ Bajaj/ Havell |
| 89 | Supply only in replacement of 20 Watt LED streetlight fitting luminaire, energy saving and environmental friendly long life LED street light made up of pressure die cast aluminium housing with high efficiency LED as lighting source and lens embedded PC cover having Bottom Opening seperate driver compartment with IP66 protection and impact resistance of IK08, including coneecting up with 2/3 core flexible coppper conductor cable, compete all as specified and directed by Engineer-in-Chage |
| 90 | Supply only in replacement of 18Watt LED 6500 K (PRIDE PLUS)inverter LED batten with square profile and polycarbonate channel. Lithium Ion battery with charging time 8hours-10 hours and back up time upto 4 hours mounted on square box of suitable size connecting up with three core flexible copper conductor cable of suitable size from ceiling rose complete. |
| 91 | Supply only in replacement LED lights fitting 1x 10W (2 Ft), 220V, AC,LED batten with square profile and polycarbonate channel.mounted on square box of suitable sizeincluding connecting up with three core flexible copper conductor cable of suitable size from ceiling rose complete. |
| 92 | S&F in replacement vertical type DB ,(VTPN) suitable for and including MCCB 4 pole, 125 amps, 16KA as incoming (compact) Earth and neutral bus bar of capacity upto 200 amp 4 ways,IP 43 protection , shrouded neutral bar & pan assembly with flexible connecting link in the wall with suitable nut and boltincluding matching the existing surfaceall as specified and directed by Engineer-in-Chage , |
| 93 | S&F in replacemen MCB DB SPN 4 ways double door with 240 Volt, 200 amps rated bus bar with all accessories flush in the wall including matching the existing surfaceall as specified and directed by Engineer-in-Chage |
| 94 | S&F in replacemen MCB DB SPN 8 ways double door with 240 Volt, 200 amps rated bus bar with all accessories flush in the wall including matching the existing surfaceall as specified and directed by Engineer-in-Chage |
| 95 | S&F in repairs MCB DB SPN 12 ways double door with 240 Volt, 200 amps rated bus bar with all accessories flush in the wall including matching the existing surfaceall as specified and directed by Engineer-in-Chage |
| 96 | S&F in repairs MCB C Curve SPN 40-63 amps, 240 Volts, Complete all as specified and directed by Engineer-in-Chage. |
| 97 | S&F in repairs MCB C Curve SP 6 to 32 amps single pole 240 Volts, Complete all as specified and directed by Engineer-in-Chage. |
| 98 | Taking down sub main wiring of any size from the ceiling, walls etc and incl making good to disturb surface of wall and match with the existing surface. |
| 99 | M&L for sub main wiring drawing through PVC casing and capping with two single core 4 sq mm and one run of 4 sq mm as earth wire of stranded copper conductor PVC insulated and unsheathed cable of 1100 volts gradeall as directed by Engineer-in-Chage. Note:- Three run of 4 sqmm wire and One run of PVC casing caping will be measured as one running meter. |
| 100 | M&L for sub main wiring drawing through PVC casing and capping with four runs of single core 6 sq mm and two runs of 6.0 sq mm as earth wire of stranded copper conductor PVC insulated and unsheathed cable of 1100 volts gradeall as directed by Engineer-in-Chage.Note:- Four run of 6 sqmm wire and Two run of 6 sqmm wire and One run of PVC casing caping will be measured as one running meter. |
| 101 | Supply and fix in repairs Triple pole and neutral enclosure with a two pin and earth plug and socket complete with one single pole MCB of rating upto 32Apms |
| 102 | Supply and fix in repairs Single pole and neutral enclosure with a two pin and earth plug and socket complete with one single pole MCB of rating upto10/20 Apms |
| 103 | Supply and fix new adore LED lamp 5 Watt confirming to Cat No LhLDeroemD9X005 of Havell\"s or euivalent in Philips / Bajaj |
| 104 | Supply and fix new adore LED lamp 9 Watt confirming to Cat No LhLDeueCnL8r009 of Havell\"s or euivalent in Philips / Bajaj |
| 105 | Supply and fix new adore LED lamp 15 Watt confirming to Cat No LhLDeueCnL9r015 of Havell\"s or euivalent in Philips / Bajaj |
| 106 | Dismantling the existing energy Meters, MCCB / MCB Distribution boards by disconnecting the eletric supply connection and refixing at new or same location after carrying out repairs / replacement , reconnecting complete all as directed by Engineer-in-Chage at site. |
| 107 | Supply and fix in repairs modular switch oneway 6 Amps, 1 module complete all as specified and as directed by Engineer-in-Chage. |
| 108 | Supply and fix in repairs modular socket6 Amps, 2/3 pin combined 2 module complete all as specified and as directed by Engineer-in-Chage. |
| 109 | Supply and fix in repairs modular socket 6 Amps/16 Amps, 2/3 pin combined 2 module complete all as specified and as directed by Engineer-in-Chage |
| 110 | Supply and fix in repairs modular switch 1 way 16 Amps, 1 module complete all as specified and as directed by Engineer-in-Chage. |
| 111 | Supply and fix in repairs modular bell push 6 Amps, 1 module complete all as specified and as directed by Engineer-in-Chage. |
| 112 | Taking down/maintenance for parts of geysers of any capacity /make after disconnecting the wire from existing power point and refixing the same after replacement of/replacement of heating element, thermostate, geyser assembly, PVC pipe & anchor bolts (if required) complete including providing T-3 core copper conductor cord from power point to geyser inputupto 1 mtr length complete all as directed by Engineer-in-Chage by Engr -in- charge,Note : for Sr. item no. 1& 25 :- (i)Work shall be carried out at the site on routine basis , (ii)Spares for Geyser & ceiling fan (heating element, thermostate, ARV, NRV, PVC pipe, gasket,Bearing,blade,bush,down rod, clamp and anchor bolts will be measuredand paid separately). (iii) Any unattended complaint of geyser not done with in 2 days, contractor shall be penalty Rs 200 on each complaint per day is applicable. |
| 113 | Taking down and fixing on the site of old & unserviciable geyser after replacement of to verticle/horizontle tank of any Make, capacity 25 to 50 ltr all as specifide and directed by Engineer-in-Chage . |
| 114 | S& F in replacement of cable PVC insulatd 3 core 2.5 Sqmm with stranded copper conductor 1100Volts grade from socket /switch to geyser. |
| 115 | M&L for repairof geyser inner tank of 25/50 ltrs capacity by gas welding /brazing for water tightness and testing complete |
| 116 | Supply and fix in replacement of 20A SP/SPNplug and socket inclosurein sheet steel inclosures without SP/SPN MCB complete all as specified and directed by Engineer-in-Chage. |
| 117 | S&F in replacement of Geyser water storage tank vertical/horizentaltype capacity 25 ltr make of metal copper/stainless steel as specified and directed by Engineer-in-Chage |
| 118 | Taking down and refixing on the site after replacement of geyser (new generation) of any make and capacity including providingheating element, thermostate, neno lamps, NRV, ARV, gas welding /brazing and any other important part as required on site,to make it serviceable, complete all as specified and directed by Engineer-in-Chage |
| 119 | Taking down and refixing on the site after replacement of of solar geyserof any make and capacity including providingheating element, thermostate, neno lamps, NRV, ARV, gas welding /brazing and any other important part of solar plate as required on site,to make it serviceable, complete all as specified and directed by Engineer-in-Chage |
| 120 | S&F in replacement of Glass wool PF any colour complete all as directed by Engineer-in-Chage |
| 121 | S&F in replacement of heating element 1500 watt , complete all as specified and directed by Engineer-in-Chage |
| 122 | S&F in replacement of heating element2000 watt , completeall as specified and directed by Engineer-in-Chage |
| 123 | S&F in replacement of themostate for geyser, complete all as specified and directed by Engineer-in-Chage |
| 124 | S&F in replacement of neon lamp for geyser yellow /red/green, complete all as specified andas directed by Engineer-in-Chage |
| 125 | S&F in replacement of air realese valve for geyser as specified and as directed by Engineer-in-Chage |
| 126 | S&F in replacement of Non returned valve 15mm for geyser all specified and as directed by Engineer-in-Chage |
| 127 | Supply and fixing in replacement of flexi PVC connection armoured type both side brass union type nuts 45/60/90cm length complete all as specified and directed by Engineer-in-Chage. |
| 128 | S&F in replacement of anchor bolts 75mm long made out of stain less steel complete all as specified and directed by Engineer-in-Chage |
| 129 | Supply and fixing in replacement of gasket rubber ring of Heater plate of any size geysers. |
| 130 | Supply and fix in replacement of new geyser assembly for any make/model/capacity of geysers including all necessary replacement of required to make it serviceable. complete all as specified and directed by Engineer-in-Chage |
| 131 | Material and labour for servicing the window type /Split type AC 1.5 TR/2.0at site, cleaning evaporator, condensing coil by using carbon tetra chloride, combing the evaporator, condensor fins,greasing all the moveable parts of fan motor, testing the wiring of whole AC, checking all parts, cleaning the air filter and replacing the unserviceable spare parts, including cleaning the tray and refixing the back AC in position by providing proper packing for better effects, testing and commissioning of AC all as specified and directed by Engineer-in-Chage |
| 132 | Material and labour for disconnecting the water cooler of cap 40 / 80 ltrs / Hr ,60 / 120 ltrs / Hr,150ltr from electric & water connection at site and servicing the water cooler by cleaning condensor by using carbon tetra chloride combing the evaporator condensor fins, cleaning of water storage tanks greasing all the moveable parts of fan motor, testing the wiring & checking all parts and replacing the unserviceable spare parts including cleaning the tray and fixing back water cooler in position, testing and commissioning of water cooler marking of SM/MES No. all as specified and as directed by Engineer-in-Chage |
| 133 | Material and labour for disconnecting taking out old unserviceable sealed unit compressor from water cooler of any make, model and capacity 40/80 ltr and refixing new compressor and soldring to unit, testing of pressure including replacement of filter all as specified and directed by Engineer-in-Chage |
| 134 | Material and labour for labour for recharging of refrigrant gas R-134 and compressor oil for water cooler including flushing, pressure testing vaccumization the complete system and detection of leakage brazing etc; testing complete system on full load capacity all as specified and as directed by Engineer-in-Chage |
| 135 | Material and labour for replacement of condenser fan motor of water cooler 1 / 32 HP with supper enemalled copper wire of appropriate gauge including taking down,insulation,and testing at location complete all as specified and as directed by Engineer-in-Chage |
| 136 | Material and labour for replacement of worn out relay with over load protection for water cooler any capacity. |
| 137 | Material and labour for replacement of existing unserviceable thermostat for water cooler all as specified and directed by Engineer-in-Chage |
| 138 | Material and labour for replacement of existing unserviceable running capacitor 36 mfd, 230 volts complete all as specified by Engr-in-Charge. |
| 139 | Material and labour for replacement existing unserviceable starting capacitor 80-100 mfd 230 volts complate all as specified Engr-in-Charge. |
| 140 | Material and labour for disconnecting & taking out old unserviceable compressor unit from refrigerator of capacity 165 to 310 Ltrsand refixing new compressor as per existing includingtesting complete all as specified and directed by Engineer-in-Chage |
| 141 | Material and labour for recharging gas R-134 and compressor oil for refrigerator of capacity 165 to 310 ltrs including flushing, pressure testing vaccumization the complete system and detection of leakage brazing etc, testing complete on full load capacity all as specified and as directed by Engineer-in-Chage |
| 142 | Material and labour for in replacement of existing unserviceable relay starting cum over load protection for refrigerator any capacitycomplete all as specified and as directed by Engineer-in-Chage |
| 143 | Material and labour for replacement of existing unserviceable thermostat switch suitable for 165 / 286 / 310 ltrs refrigeratorcomplete all as specified and directed by Engineer-in-Chage |
| 144 | Material and labourfor disconnecting taking out old unserviceable sealed unit compressor from window type air conditioner capacity 1.5 Ton and refixing new compressor and pressure testing complete all as specified and directed by Engineer-in-Chage |
| 145 | Material and labour for labour for recharging refrigerant gas R-22 or suitable for system and compressor oil for window type AC 1.5 ton including flushing, pressure testing vaccumization the complete system and detection of leakage brazing etc; testing complete system on full load capacity all as specified and as directed by Engineer-in-Chage |
| 146 | Material and labour forreplacement of condenser fan motor any capacityof window type AC with supper enameled copper wire of same gauge including refixing and testing complete all as specified and directed by Engineer-in-Chage |
| 147 | Material and labour for disconnectingand taking out old unserviceable Reciprocating compressorfrom split Air conditioner of cap 1.5 TR / 2.0 TR and fixing new compressorincluding pressure testing complete all as specified and directed by Engineer-in-Chage |
| 148 | Material and labour for disconnectingand taking out old unserviceable Rotary compressorfrom split Air conditioner of cap 1.5 TR / 2.0 TR and fixing new compressorincluding pressure testing complete all as specified and directed by Engineer-in-Chage by Engineer-in-Charge. |
| 149 | Material and labour for replacement of condenser fan motor of split type ACwith supper enameled, copper wire of same gaugeincluding refixing and testing complete all as specified and directed by Engineer-in-Chage |
| 150 | Material and labour for charging of refrigerant gas R-22 and compressor oil in split type AC 1.5 /2.0 TR capacityincludingvaccumising the complete system, detection of leakage, brazing etc, testing on full load all as specified and directed by Engineer-in-Chage |
| 151 | Material and labour for replacement of existing unserviceable PCB of 1.5 Ton / 2.0 Ton capacity window /split type AC with remote control kit ,connecting up and testing on load all as directed by Engineer-in-Chage |
| 152 | Routinemaintenance of fire fighting system & Fire alarm system by attending fault testing of system,checking of system etc, including replacement of unserviceable component including preventive Maintanence by replacing parts other then mentioned in Schedule ‘ A ‘Part II also for fire fighting system, fire alarm system installed at LOGISTIC Building comprising following: (a) FOUR TO TWENTY Zone main fire alarm control panel with each zone battery charger and 230 V power units.(b) DETECTOR OF ANY TYPE, head detector, response indicator, manual call point and hooters. etc(c) All cable connectors from main control panel to item 1(b) etc.(d) Lead acid battery 12 V / 9 AH Capacity. |
| 153 | All as per item No 152 here-in-before but EE Hall. |
| 154 | Supply and fix in replacement of manual call point duly painted in red colour paint fittedwith front glass (to be broken in case of fire) complete with test key to check the response with out breaking the glass of makes as per site requirement all as specified and as directed by Engineer-in-Chage. |
| 155 | Supply and fix in replacement smoke detector of makes as per site requirement all as specified and as directed by Engineer-in-Chage. |
| 156 | Supply and fix in replacement Zone cards of makes as per site requirement all as specified and as directed by Engineer-in-Chage. |
| 157 | Supply and fix in repair replacement electronic hooters of makes as per site requirement all as specified and as directed by Engineer-in-Chage. |
| 158 | Supply and fix in repair replacement power card |
| 159 | Supply and fix in replacement Heat detector of makes as per site requirement all as specified and as directed by Engineer-in-Chage. |
| 160 | Supply laying and testing cable XLPE insulated screened PVC beded,galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volt grade with stranded aluminium conductor of size 25 sq mm 4 core. Including taking down old unserviceable cable any size by dismantling of all electrical connection etc all as specified anddirected by Engineer-in-Chage. |
| 161 | All as per item no 160 above but of size 16 sq mm 4 core. |
| 162 | Supply and fixFR PVC insulated cable 1100 V grade with multistranded copper conductor of size 1.5 Sqmm3 core conductor all as s specified and directed by Engineer-in-Chage at site. |
| 163 | Supply & fix in replacement of SPD up to 50 KA complete all as specified and as directed by Engineer-in-Chage . |
| 164 | Supply & fix in replacement of LED DRIVER for 45 to 150 watt street light fitting complete all as specified and as directed by Engineer-in-Chage |
| 165 | Supply & fix in replacement of LED street light of 70 watt along with fixture.CAT Part No ENXT P 84L WH CR PC SD or equivalent to CG/Philips/Wipro complete all as specified and directed by Engineer-in-Chage |
| 166 | Supply & fix in replacement of LED Flood Luminaire of 100 Watt with high pressure die cast aluminium housing with IP 65 Protection CAT Part No PRAZE F 120L WH NB-A5 TG SD 100W LEDor equivalent to CG/Philips/Wipro complete all as specified and directed by Engineer-in-Chage |
| 167 | Taking down streetlight fitting/ security lights / Building any type from pole /wall and refix the same in its own position including repair and replacement of unserviciable parts and testing complete .NOTE :-(i)Spares required to be replaced will be measured and paid separatel under respective item of Sch A.(ii) Rates quoted shall be deemed to include the cost of minor spares not catered for in the subject CA. |
| 168 | Taking down unserviceable GI pipe line of following size from the trenches by removing of nut and bolts of following sizes(a) 15 mm dia |
| 169 | All as per item No 168 here-in-before but 20 mm dia |
| 170 | All as per item No 168 here-in-before but 25 mm dia |
| 171 | All as per item No 168 here-in-before but 40 mm dia |
| 172 | All as per item No 168 here-in-before but 50 mm dia |
| 173 | S & F GI tubing medium grade with all new connections and fittings such as tees, bends, elbows, short pieces, connector back nuts, diminishing pieces, caps, plugs unions etcLaid in trenches for following size of pipes complete all as specified and as directed by Engineer-in-Chage :-(a) 15 mm dia |
| 174 | All as per item No 173 here-in-before but 20 mm dia |
| 175 | All as per item No 173 here-in-before but 25 mm dia |
| 176 | All as per item No 173 here-in-before but 40 mm dia |
| 177 | All as per item No 173 here-in-before but 50 mm dia |
| 178 | Supply and fixin replacement Gun metal Globe or Gate valve with iron wheel head, screwed both ends for iron pipe and fixed with required necessary GI fittings complete of size :-(a) 20 mm dia |
| 179 | All as per item No 178 here-in-before but 25 mm dia |
| 180 | All as per item No 178 here-in-before but 40 mm dia |
| 181 | All as per item No 178 here-in-before but 50 mm dia |
| 182 | Supply and lay on PCC pillars or on any position MS pipe of followingdia , Apply two coats with black paint over one coat of red oxide primer externally on the pipe line complete including testing and commissioning to the satisfaction of Engr-in-Chargea . 200 mm |
| 183 | All as per item No 182 here-in-before but 150 mm |
| 184 | Dismantling/taking out unserviceable sluice valve of size 80mm to 300mm bore dia by opening/cutting rusted nuts, bolts etc all as specified and directed by Engineer-in-Chage. |
| 185 | Supply and fix ofCI Rising Spindle sluice valveMake-Kriloskar valve both ends flanged and drilled. Hand wheel made out of grey CI, complete valve confirming to IS 14846 and its fittings suitable for hydraulic test pressure of 15 Kg/sqcm PN 1.6 ISI marked complete all as specified and directed by Engineer-in-Chage of sizes :- (a) 100 mm |
| 186 | All as per item No 185 here-in-before but 150 mm |
| 187 | M & L for disconnecting carefully and dismantling the pump set from motor unitand opening complete pump set, cleaning replacing of unserviceable parts such as gun metal bushes, rubber packing, MS Nut, Bolts, rubber coupling (spider), Air valve and worn out parts etc and reassembling, re-installing commissioning and testingfor satisfactory running complete all as specified and as directed by Engineer-in-Chage for following capacity of pumps :-Note :- Spare parts replaced shall be measured and paid separately as \"Supply only\" Centrifugal multistage pump set of 50 HP capacity. |
| 188 | Centrifugal pump set of 12.5 HP capacity. |
| 189 | M & L for overhauling of motor unit, 3 phase, 415 volts by dismantling and opening completely, cleaning internal parts thoroughly, replacing unserviceable minor parts like nut bolts, washers, terminal plate, cable lugs, greasing including insulating materials, varnishing, heating, reassembling reinstalling and testing complete all as specified and as directed by Engineer-in-Chage for the following capacity of motor :-Note:- Unit rate quoted shall be deemed to include for minor unserviceable parts as mentioned/ required for repairs.All other major spares as specified hereinafter will be measured and paid separately as \"Supply only\".Centrifugal multistage pump set of 50 HP capacity. |
| 190 | Centrifugal pump set of 12.5 HP capacity. |
| 191 | M & L for rewinding electric motor by dismantling from cable connection pump set and foundation, dismantling complete motor removing all parts thoroughly removing burnt copper wire with new one and rewinding motor 3 phase 415 with same gauge, same No of turns of super enamel copper wire including E class insulating material, varnishing, heating etc re-installing and testing etc complete all as directed by Engineer-in-Chage by Engr-in-Charge for the following capacity:-Note :- Unit rate quoted shall be deemed to include for minor unserviceable parts as mentioned/ required for repairs.All other major spares as specified hereinafter will be measured and paid separately as \"Supply only\".Centrifugal multistage pump set of 50 HP capacity. |
| 192 | Centrifugal Mono pump set of 12.5 HP capacity. |
| 193 | M &L for cleaning of over head reserviors underground sumps and other water storage tanks manually as described below ans all as directed by Engineer-in-Chage for over head reserviorof35000 GLN capacity at AFS station.(a) Suitably blocking the incoming and outgoung and wash out pipes for avoiding mud and foreign materials deposited in the reservior getting in to pipes and chocking it prior to starting the cleaning.(b) Bail out complete water remaining in the over head reservior before cleaning the mud and other deposits.(c) Filling up the overhead reserviors full and feed the affected residential/OTM consumers enough water to sustain during the reservior cleaning period.(d) Clean the floor wall and dome of the reservoir by jetting water using rotary pressure jets, remove the sludge so deposited completely by rubbing the wall/floor with brushes and repeat removal and depositing. Approved detergent shall be used.(e) Disinfect the tank with FOA/WHO specified chemical and make the tank totally bacteria free.(f) Apply a coat of black bituminous paint on tank man hole covers including surface preparation.(g) Writing of the date of cleaining of the water tank with white letters on black background.(h) Remove the blockage from inlet/outlet/overflow pipes,refill the tank with water and supply water at supply timings ensure satisfactory distribution. |
| 194 | All as per item No 193 here-in-before but for 0.35 LG capacity Semi UG Sump at AFS Station. |
| 195 | S&F in replacement, contactor Type ML-3, AC3-40 A Amps |
| 196 | All as per item No 195 here-in-beforebut of size ML-1.5, AC3-25 A Amps |