|
| 1 | Part A: Installation of gear coupling of gear side of drive drum |
| 2 | Loading, transportation & unloading of complete gear coupling set,one drive drum, DA-oxygen cylinder from surface to 3D/15L with the help of MUV |
| 3 | Dismantling-pulling out older gear coupling from gear box (by gas cutting ) & drive drum shaft after removing of gear box. |
| 4 | Fitting-hammering-grinding-filling of gear coupling complete on gear box and on new drive drum shaft. |
| 5 | fitting-alignment of gear box-drive drum-motor and trial run of the belt conveyor . |
| 6 | Part B: \"Strenghtening of loop take up unit along with tensioning arrangement at site after nessecary fabrication\" |
| 7 | Loading, transportation & unloading of 20 mtr ISMB-200, 50 mtr ISMC-150, 50 mtr ISA-65 X65 X6. DA-oxygen cylinder from surface to 3D/15L in R-VI seam with MUV |
| 8 | Necessary cleaning near loop take up area of 4D tandem belt. |
| 9 | Removal of belt at loop take up, jointing & tensioning of belting of 4D tandem belt conveyor and trial run. |
| 10 | Dismantling of loop structure complete & removal of loop drums-loop trolley from belt. |
| 11 | Nessecary Fabrication of worn out loop take up unit of 6 mtr long and Fixed drum unit base frame by usage of ( ISMB- 200 & 250 joist,ISMC-150 & 125 Channel, IAS-90*90*8 & 65*65*6 angle, Ms plate-20 mm thick) at site |
| 12 | Fittings of loop take-up frame and fixed drum unit at site |
| 13 | Nessecary Fabrication of worn out Movable trolley for loop take up unit by using (ISMB- 200 joist &MS plate-20 mm thick) at site |
| 14 | Fitting of loop trolley with 01 no drum at site |
| 15 | Nessecary fabrication and fitting of worn out tension arrangement frame by usge of (ISMB- 200 joist ,IAS- 65*65*6 angle, Ms plate-20 mm thick) at site |
| 16 | Transportaing,Laying, Lapping, Jointing & Tensioning of about 12 mtr. Belting on loop take up and trial run. |
| 17 | Part C: Installation of bottom rollers, top rollers, decking plate, after transportation |
| 18 | Transportation of 60 nos. l000mm Bottom rollers, 40 nos top roller, 3 nos. decking plate (4.5mXl.5m), 12mm plate (2mX2m), Oxygen and DA cylinder from surface to site at 19XD/ 50L |
| 19 | Fitting of Bottom rollers after proper alignment of foot stools |
| 20 | Fitting of top rollers after proper alignment of shuctures |
| 21 | Fitting of decking plates at drive head and tail end |
| 22 | Supply of Oxygen cylinder |
| 23 | Supply of DA cylinder |
| 24 | Part D: Extension of one 1200mm wide PVC belt conveyor for a length of 60M (from 17L/4D to 19L/4D, change of 80M old and damaged belt at 4D Tandem Belt |
| 25 | Transportation and Installation of 60mtr. of belt structure, after loading it on MUV from surface(weight of 1200mm structures is 0.085MT/mtr.) |
| 26 | Transporting, laying, lapping & jointing of 120 mtr. of belting |
| 27 | Shifting and installation of tail end for every shifting( 1 times extension from 4D/17L to 4D/19L)(wt = 1*1 Te=1Te) |
| 28 | Replacement of 80M old PVC belting after transporting from Surface using MUV |
| 29 | Laying of pull cord and audio cable throughout the belt line of 60 metre. Fitting of lock out and communication devices along the belt. |
| 30 | Supply of M.S. Nut & Bolt (M16x40) |
| 31 | Supply of G.I wire 8 SWG (for signalling system) |
| 32 | Supply of Bobin insulator (for signalling system) |
| 33 | Supply of M.S Nut & Bolt (3/8\"\"x 3\") with washer(for signalling system ) |
| 34 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |