| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level, In all types soils/saturated soil such as moorum, sand, sandy siltm clay, black cotton soil, kankar etc. Depth up to 1.5 m |
| 2 | Silt clearance of drains, channels and canals with lift 1.5 Mtr and lead up to 50 Mtr. |
| 3 | Carriage of Materials by mechanical transport including loading, unloading and stacking :: earth upto 5km |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:5:10 (1 Cement : 5 fine/ coarse sand : 10 graded stone aggregate 40mm nominal size). |
| 5 | Brick work with FPS bricks of class designation 75 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 6 | Providing and laying damp-proof course with cement concrete grade M-15 (1 : 2 : 4) mortar prepared with 1% solution of water-proof compound complete as per specification . including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar. |
| 7 | Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar. 1:4 (1 cement : 4 fine/ coarse sand) |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). |
| 9 | Removing & re-fixing of precast cement concrete interlocking paving blocks of all sizes over 50 mm thick course sand bedding (duly compacted) including filling of joints with sand complete in all respect. |
| 10 | Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 11 | 30mm red sand stone sun-shade (chisel-dressed) supported on red sand stone brackets, fixed in walls with cement mortar 1:4 (1 cement : 4 coarse sand) including finishing complete. |
| 12 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete.Thermo-Mechanically Treated bars. Please Enable Macros to View BoQ information |