| 1 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100KN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to required density complete work.(WBM Grading-2) |
| 2 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100KN in stages to proper grade and camber, applying and brooming, stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density complete work.(WBM Grading-3) |
| 3 | Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at rate of 0.70 Kg/Sqm using mechanical means as per Technical Specification Clause 5.1-502. Including Cost of Emulsion. |
| 4 | Providing and applying tack coat with Bitumen (VG-10) using emulsion distributor at the rate of 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 5.2-503(iii) Including Cost of Bitumen. |
| 5 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type as per Technical Specification Clause 5.9-508. Including Cost of Bitumen. |
| 6 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 5.12-510. Including Cost of Bitumen. |
| 7 | Brick edging on both sides of the road of first class bricks 8 cm (3\") wide and 12 cm. 4½\"deep laid with mud mortar including labour and supply of. bricks finished to required template and proper alignment and also including dressing and ramming the excavated earth as directed by Engineer-in-Charge. SOR 765. |
| 8 | Construction (E/W in cutting/Filling of Patri) of Subgrade and earthen shoulders with apporved material obtained from borrow pits with attl ifts and leads transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300.2 with a lead upto 1000 m as per Tecnical Specification Clause 303.1 |
| 9 | Excavation for Road way in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification clause 302.3 |
| 10 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203. PCC Grade M10 (1:3:6) |
| 11 | Sand Filling in Foundation Trenches as per Drawing & Technical Specification |
| 12 | Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications Clause no.600,1200&1203 |
| 13 | Providing and Laying of 1000 mm dia RCC Hume Pipe NP-3 Class etc. Complete. |
| 14 | Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204 Please Enable Macros to View BoQ information |