| 1 | Construction, Supply, Installation, Testing and Commissioning of 500 KLD STP Based on Constructed Wetland Technology including Process & Site Layout Plan and Site Grading Plan, Hydraulic Diagram, Single Line Diagram, Basic Electrical Drawings, Civil General Arrangement Drawings, Structural Designs and Drawings and Construction Drawings, Electrical and plumbing Drawings Operation and Maintenance Manuals etc, consisting of Primary Treatment Units, Treated Effluent Disposal drain/Channel, Interconnecting Piping with required Gates & Valves, Civil work for STP with supply & filling of required gravels, pump house, Bio-Media and Plantation/landscaping work, Boundary wall pump room and other Miscellaneous Works such as earth filling in site, sewer line 350mm dia with manhole and 25 K.W. Solor Plant complete and including works for required of STP complete all associated Civil, Electrical, Plumbing Works and Commissioning / Installation work and also including Operation and Maintenance 05 years of 500KLD Sewage Treatment Plant based on Constracted Wetland Technology as a whole including Supply of Chemical and Consumables materials, Disposal of Plant Residuals (e.g. Screenings, Grit and Dewatered Sludge), Manpower required, General Maintenance of Civil Structures, Preventive and Breakdown Maintenance of Electrical Items, Field Instruments etc., Cost of Collection, Analysis, Reporting, Monitoring and Maintaining Record of Samples from the Raw Sewage and Treated Sewage daily collected at least for one time a day from the Entry and Exit of the STP Units thereon (excluding Power) as mentioned in the Tender.(Excluding G.S.T.) Please Enable Macros to View BoQ information |