|
| 1 | Supply of following Decentralized materials Provide by Contractor at the works site as per RESSPO norms. |
| 2 | X-arms holding clamps with bolts & nuts for ST/PCC Pole |
| 3 | M.S clamp for Top, T-off channel with bolts & nuts |
| 4 | Stone pad 300x300x75 mm |
| 5 | F-bracket with bolts & nuts for ST/PCC Pole |
| 6 | Danger board with clamp & bolts for ST/PCC Pole |
| 7 | Guarding Angle |
| 8 | E-bracket with bolts & nuts |
| 9 | P.G clamps |
| 10 | LT Clamp |
| 11 | Z-Clamp |
| 12 | Suspension Clamp |
| 13 | NEUTRAL CUM EARTH WIRE |
| 14 | EYE HOOK |
| 15 | Dead end clamp for Suspension |
| 16 | Dead end clamp |
| 17 | Alluminium Lug of Different size |
| 18 | LT Shackle Insulator |
| 19 | NUT AND BOLT for Shackle Insulator |
| 20 | COPPER L-PIECE 50*225*10 MM SQ |
| 21 | COPPER L-PIECE 62*225*12 MM SQ |
| 22 | SINGLE PHASE METER BOX |
| 23 | SINGLE PHASE METER BOX CLAMP |
| 24 | 3 PHASE DRISTIBUTION BOX |
| 25 | 3 PHASE DRISTIBUTION BOX CLAMP |
| 26 | BARBED WIRE |
| 27 | LOOP GARD |
| 28 | JOINTING KIT OUTDOOR/INDOOR |
| 29 | ALUMINIUM BINDING WIRE |
| 30 | T/F CLAMP |
| 31 | Cartage of following materials from ESC, Mirzapur to work site including loading & unloading charge. |
| 32 | STP Poles,11 meter long |
| 33 | PCC Poles,11 meter long |
| 34 | PCC Poles,8.5 meter long |
| 35 | Line materials with ACSR Weasel Conductor etc |
| 36 | Transformer10 KVA |
| 37 | Transformer25 KVA |
| 38 | Transformer63 KVA |
| 39 | Transformer100 KVA |
| 40 | Transformer250 KVA |
| 41 | Transformer400 KVA |
| 42 | 11 KV XLPE Cable size 3x70/120/185mm2 |
| 43 | 11 KV Pilfer proof metering cubicle |
| 44 | LT PVC Cable 3.5x25mmsq |
| 45 | LT PVC Cable 3.5x50mmsq |
| 46 | LT PVC Cable 3.5x70mmsq |
| 47 | 11 KV CT/PT Combined unit. |
| 48 | Erection |
| 49 | Erection of single support ST/PCC Pole for construction of 11 KV Line including digging of pit, fitting of all accessories, back filling of earth & others required work. |
| 50 | Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms(cement sand & brick ballast wil be supplied by the constractor on his own cost) |
| 51 | Grouting of stay sets including digging of pit with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms, fixing binding and nuzzling of stay wire. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) |
| 52 | Earthing of Poles |
| 53 | Erection of Sectional Double Pole Structure of ST/PCC Pole including digging of pit. Fitting of accessories back fitting of earth, earthing, grouting of each pole & all stay sets (coment sand & brick ballst will be supplied by the contractor on this own his own cost) & other required works. |
| 54 | Stringing & sagging of 3 phase 11 KV line upto proper sag including laying of ACSR Weasel Conductor, binding with insulators & jumpering. |
| 55 | Stringing & sagging of LT line upto proper sag including laying of ACSR Weasel Conductor, binding with insulators & jumpering. |
| 56 | Drill/cut stone for erection of pole/stay in hill Area |
| 57 | Mounting of 10 KVA Transformer along with HT< Connections per RESSPO norms. |
| 58 | Mounting of 25 KVA Transformer along with HT< Connections per RESSPO norms. |
| 59 | Mounting of 63 KVA Transformer along with HT< Connections per RESSPO norms. |
| 60 | Mounting of 100 KVA Transformer along with HT< Connections per RESSPO norms. |
| 61 | Mounting of 250 KVA Transformer along with HT< Connections per RESSPO norms. |
| 62 | Mounting of 400 KVA Transformer along with HT< Connections per RESSPO norms. |
| 63 | Laying, of 11 KV XLPE cable aiongwith cost of bricks & sand as Per RESSPO norms |
| 64 | Grouting of11 KV Line as per RESSPO norms |
| 65 | Filling of 11cable jointing kit size 3x70/120/185mm2 11 KV indoor type as per Respo norms. |
| 66 | Installation of 11 KV Pilfer proof metering cubicle inside meter room, by fixing nut and bolts after checking allgnment with trench & connecting incomming & outgoing cable in the CT Chamber as per RESPO norms. |
| 67 | Installation of CT/PT combind unit as per RESPO norms |
| 68 | Connection of LT/PVC service cable for consumers |
| 69 | PLINTH OF 250 KVA T/F |
| 70 | PLINTH OF 400 KVA T/F |
| 71 | FANCING OF 250 KVA T/F |
| 72 | FANCING OF 400 KVA T/F |
| 73 | WELL TYPE EARTHING 100/250/400 KVA |
| 74 | Receive back material Of ACSR weasel/dog conductor etc from work site to store centre mzp |
| 75 | Receive back material Of Scrap iron from work site to store centre mzp Please Enable Macros to View BoQ information |