| 1 | Demolishing cement concrete 1:3:6 or richer Mix including disposal of material within 50 metres lead as per direction of Engineer – in – charge. Including all labour charges, transportation charges, minor tools labour cess GST etc. Complete. |
| 2 | Dismantling steel work manually/ by mechanical means in built up sections without dismembering and stacking within 50 meters lead as per direction of Engineer-in-charge. Including all labour charges, transportation charges, minor tools, labour cess GST etc. Complete. |
| 3 | Providing and laying in position specified grade of cement concrete including the cost of cement, mainlandstone agregates and mainland river sand, transportation charges of all materials to work site, all labour charges minor tools, GST, labour welfare cess etc complete. RCC 1:1.5:3 (1 cement,. 1.5 River sand and 3 graded stone aggregate 20mm nominal size) |
| 4 | Providing and fixing Tor steel reinforcement for R.C.C. work including cutting, bending, binding, and placing in position cost of binding wire, minor tools, cost of all materials, all labour charges, minor tools, GST,labour welfare cess etc. complete. |
| 5 | Providing formwork including centering, strutting propping etcto give rough finish for footing, column, plinth beam, beam and slab etc., using 19 mm marine plywood including cost of plywood, nails, battens etc., all labour charges, transportation charges of all materials, minor tools and plants etc., complete. |
| 6 | Steel work in built up tubular (round, square or rectangular hollow tubes etc) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washer Including all labour charges, transportation charges, minor tools, labour cess GST etc. Complete.etc. complete. |
| 7 | Finishing with Epoxy paint(Two Coats) at all location prepared and applied as per manufacturing specification including appropriate priming coat, including preparation of surface, cleaning, cost of paint, brushes, transportation charges, all labour charges, minor tools, labour welfare cess & GST etc., complete. |