| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix)(DSR 2023 SH 15.2.1) |
| 2 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge |
| 3 | Earth work in surface exvation not exceeding 30 cm In depth but Exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excevated earth upto 50 m and lift upto 1.5, as directed by Engineer in charge (DSR 2023 SH 2.1.1) |
| 4 | 1:5:10 (1 cement : 5 manufactured sand derived from Recycled Concrete Aggregate (RCA) : 10 graded stone aggregate 40 mm nominal size including Recycled Aggregate (RA) (DSR 2023 SH 4.1.10A) |
| 5 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) (DSR 2023 SH-6.1.2 ) |
| 6 | 12 mm cement plaster of mix : 1:4(1 cement: 4 fine sand)(DSR 2023 SH-13.1.1 ) |
| 7 | 1:2:4 (1 cement : 2 coarse sand (zone-iii) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources). (DSR 2023 S H 4.1.3 ) |
| 8 | Providing and fixing glass strips in joints of terrazzo/ cement concrete floors. (DSR 2023 SH 11.13) |
| 9 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.(DSR 2023 SH 15.60) |
| 10 | CARRIAGE OF MATERIALS By manual labour including loading, unloading and stacking for lead less than 01-50 mtr |
| 11 | Raising & re-fixing of manhole including all material labor T&P etc. all complete. (NS) |
| 12 | Supply & fixing of R.C.C. manhole frame and cover including all complete. (NS) |
| 13 | Supply & mixing 3.5 kg and or as specified by the manufacture, hardener in tremix concrete per sqm |
| 14 | Supply & Fixing Granite Stone Work Display Board (Size 2.50ft x 4.00ft) including Painting, Lettering etc. all complete. (None Schedule) |
| 15 | Sub Total |
| 16 | Add/Deduction Rs. For Estimate Figure Amount Match |
| 17 | Grand Total Please Enable Macros to View BoQ information |