|
| 1 | Comprehensive maintenance forthe following capacities Lifts located at various buildings as detailed below:- (a) Goods lift G+1 : 1 ton : CSL BLDG: JHONSON JHONSON make : 1 NO(b) Passenger lift G+2 : 1 ton : MPDMS BLDG : Kone make : 1 NO(c) Passenger lift G+3 : 1 Ton : QR LAB : OTIS make : 1 NO (d) GOODS + PASSENGER LIFT G+7 : 680KG : MAIN TOWER : OMEGA make : 1 NO(e) GOODS + PASSENGER LIFT G+6 : 680KG : AUXILARY TOWER : OMEGA make : 1 NO (f) Freight lift G+2 : 1 ton : RSL : OMEGA make : 1 NO(g) GOODS+PASSENGER LIFT G+4 :1 Ton : ELSEC NO 17 TOWER : KONE make : 1 NO(h) Goods lift G+3 : 1 ton : DOFI BLDG : KONE make :1 NO(i) Goods lift LIFT G+2 : 1 ton : K4 bldg : SCHNIDER make : 1 NO(j) Freight + passenger LIFT G+2 : 1 Ton : DNEC Bldg: OMEGA Make : 1 NO |
| 2 | (k) Goods lift + PASSENGER G+2 : 1 Ton : DOPSS/PSSL BLDG : OTIS make : 1 NO (l) Freight + passenger LIFT G+2 : 1 Ton : IIR SEEKAR : JHONSON JHONSON make :1NO (m) LIFT G+3 : 1020 kg : MRSAM ARMY :KONE make :1 NO(n)LIFT G+3:DSST BLDG : KONE make :3 NO(o) LIFT, GOODS G+1 : 1 Ton : MSAT ENTRANCE :KONE make :1 NO (p) Freight + passenger LIFT G+2 : 408 kg : 0208 BLDG :KONE make :1 NO(q) GOODS LIFT G+2 : 1020 kg : Rudram 2 BLDG : KONE make :1 NO (r) Freight + passenger LIFT G+2 : 1 Ton : DNEC Bldg: OMEGA Make : 1 NO |
| 3 | Notes for the Serial Item No. 1 :- (a) All T&P required for repair and maintenance are deemed to be included in the unit rates quoted. (b) Quoted rate shall be deemed to be include for supply of all minor consumable viz grease, lubricant, cotton waste, thimbles, cable pieces, cable lugs, mild steel bolts, nuts, washers, emery papers and other sundry items etc., servicing of gear box, safety clutch system, taking down the burnt/damaged parts being replaced, inclusive of cleaning, greasing, oiling, fixing, making connections, testing, commissioning etc., in respect of BOQ itemsindicated here in after as \"Supply only. Fixing charge all types of Minor/Major spare parts Item No 2 to 35 shall be deemed to be included in the quoted rate. (c )The comprehensive maintenance shall be got carried out by Original Equipment Manufacturer (OEM) only for which necessary agreement copy between contractor and OEMshall be submitted to this office for the above lifts. |
| 4 | (d)All break downs and repairs shall be attended by OEM only on as requirement basis within a reasonable time all as directed by the Engineer-in-charge. Monthly Inspection of lifts shall be carried out by the OEM.All safety tests shall be carried out by OEM and report shall be submitted to the Engineer-in-Charge.(e) The replacement of spares/parts will be measured and paid for separately under relavent items of BOQ. Labour elements for fixing of spares/parts mentioned in this Schedule/BOQ as \"Supply Only\" shall be deemed to include in the unit rate quoted. or. (g) Contractor/ OEM has deemed to have visited the site and known to have complete knowledge/information about the lifts and all other relevant factors as existed at site before quoting the tender. |
| 5 | (h)Quoted rate shall be deemed to be include for supply of all minor consumable viz grease, lubricant, cotton waste, thimbles, cable pieces, cable lugs, mild steel bolts, nuts, washers, emery papers and other sundry items etc., servicing of gear box, safety clutch system, taking down the burnt/damaged parts being replaced, inclusive of cleaning, greasing, oiling, fixing, making connections, testing, commissioning etc., in respect of BOQ items indicated here in after as \"Supply only.(j) Lift inspection shall carried out by Govt approved Lift Inspector onceduring the contract period completeall as directed by the Engineer-in-charge. All documents shall be submitted to Engineer in charge and unit rate quoted shall be deemed toinclude for the same. |
| 6 | (k) Contractor has to employ his properly qualified supervisor cum mechanic at site during maintenance and has to tie up with Lift Inspector for smooth functioning of all above lifts.(l) Periodical maintenance as per check list for monthly inspection shall be submitted by contractor.(m) Any additional charges regarding gap in previous AMC to next AMC should be bear by contractor. (n) All the items/materials required for montlhy cleaning of lift cabin should be provide by contractor. |
| 7 | Supply only Controlcontactors of 110V capacity complete all as specified. |
| 8 | Supplyonly Break shoe suitable for lifts listed under Sl item No. 1above complete all as specified. |
| 9 | Supplyonly levelling switches suitable for lifts listed under Sl item No. 1above complete all as specified. |
| 10 | Supplyonly Relay Board suitable for lifts listed under Sl item No. 1 above complete all as specified. |
| 11 | Supply only Door Sensor (Full size length) suitable for lifts listed under Sl No. 1 above complete all as specified. |
| 12 | Supplyonly safety mechanical Limit Switchsuitable for lifts and Cranes complete all as specified. |
| 13 | Supplyonly Door Belt for Closer and door opener suitable for lifts listed under Sl item No. 1 above complete all as specified. |
| 14 | Supplyonly Direction Read switch sensors suitable for lifts listed under Sl item No. 1 above complete all as specified. |
| 15 | Supplyonly Door limit switch suitable for lifts listed under Sl item No. 1above complete all as specified. |
| 16 | Supplyonly Control Transformer suitable for lifts and cranescomplete all as specified. |
| 17 | Supply onlyDoor Wheel suitable for lifts listed under Sl item No. 1 complete all as specified. |
| 18 | Supply only Lift Cabin fan/Blower suitable forexisting make and model listed under Sl item No. 1abovecomplete all as directed. Make: Crompton Greaves / Khaitan/ Havells / Bajaj /OEM |
| 19 | Supply only 10 watt LED recessed mounted downlighter with pressure die cast aluminium heat sink and polycarbonate diffuser in white powder coated finish with intetrated driver complete all as directed.Make: Havells or Techno commercially equivalent in / Philips / Wipro / CG /OEM |
| 20 | Supply only Magnet switch suitable for lifts listed under Sl item No. 1 above complete all as specified. |
| 21 | Supply only Shoe gibs suitable for lifts listed under Sl item No. 1 above complete all as specified. |
| 22 | Supply only Gear Oil of grade 320in Lift Gear Box complete all as specified and directed.Make: Castrol/Servo/Gulf Western Oil/IOCL/HPCL/BPL /OEM |
| 23 | Supply only Variable Voltage & Variable Frequency (VVVF) Drive suitable for microprocessor controller system with all accessories suitablefor lifts listed under Sl item No. 1abovecomplete all as specifed and directed.Make: Yasakawa /Toshiba /OEM |
| 24 | Supply only ERD/ KRD / ARD (Automatic Rescue Device)suitable for lifts listed under Sl item No. 1 with complete battery bank, comprising of 04Nos batteries of 12 Volts, 12/18 AH complete suitable for 1 Ton goods lift and testing all as specified and directed.Make: Kone/Omega/ Otis/OEM |
| 25 | Supply onlyRectifier Board, Sensor Board, Power Board with complete battery bank, supply and fix new Rectifier Board, Sensor Board, Power Board with battery bank comprising of 8No batteries of 12V, 17 AH complete suitable for 1 Ton goods lift of any make/model and testing all as specified and directed. Make: Kone/Omega/ Otis/OEM |
| 26 | Supply only Door Module, FERMATOR DOORVF5 + with Extension CABLEwith all accessories of suitable capacity, testing including necessary wiring and removing unserviceable drives complete all as specified and as directed.Make: Kone / Otis / Omega/OEM |
| 27 | Supply only Curtian of light-154beams and LCECCBe assembly with all accessories of suitable capacity, testing including necessary wiring and removing unservicable drives complete all as specified and as directed.Make: Kone / Otis / Omega /OEM |
| 28 | Supply only Car Operating Panel,complete all as specified and directed.Make: Kone / Otis / Omega/OEM |
| 29 | Supply only Mother Board compatible for lifts listed under Sl item No. 1 at lift main panel complete all as specified and directed. Make: Otis / Kone / Omega/OEM |
| 30 | Supply onlycabin push button box with push buttons for lifts complete all as directed. |
| 31 | Disconnecting and removing the 1HP motor, rewinding the same with same gauge/ size of copper conductor, varnishing, insulating to the required standards, fixing back and testing complete all as specified and directed. |
| 32 | Supply only4 pole 100Amp MCCB, 36KA, 415 Volts with thermal magnetic release, including provision of copper cable/extended terminals from MCCBs to busbar and connection of LT cables with MCCB with suitable size aluminium lugs, complete all as specified. Make: Legrand / L&T/ Siemens / IndoAsian/OEM /OEM |
| 33 | All as per Sl item No. 27 above but 4 pole 63Amps MCCB, 36KA 415voltsMake: Legrand/ L&T/ Siemens/ IndoAsian/OEM |
| 34 | Supply only Battery of capacity 12 volts, 12 AH to 17 AH for lifts complete all as directed. Make: Exide /Amron /OEM |
| 35 | Disconnecting old/unserviceable wiring, M & L for Additional wiringsuitable for 1 Ton goods lift any make/modelfor interfacing with main controller complete and testing all as specified and directed. |
| 36 | Supply onlyCar Operating Panel complete all as specified and directed. |
| 37 | Supply onlyPCB(car top communication boar), LCEREC MODEL supplycomplete all as specified and directed. |
| 38 | Supply only PCB (Power Distribution)LCE230S BOARD V3F 18complete all as specified and directed. |
| 39 | Supply onlyPCB (sensor and ARD)LCE230S BOARD 230V supply and fix new Car Operating Panel complete all as specified and directed. |
| 40 | Supply onlyDOOR CONTACT, NBSL LITE AB06G02 supply and fix new Car Operating Panel complete all as specified and directed. |
| 41 | Disconnecting electrical connectionsremoving the unserviceable burnt out Power drive of CRANE / LIFT, S&F and fix new Main Hoist Variable Frequency Drive of model Acs 380 series (5 to 10HP, 3.5 to 7.5 KW)make ABB ORequivalent in Yasakawa, Siemens, L&T, CG, including programming by OEM Engineer and testing complete all as specified and directed. |
| 42 | Disconnecting electrical connectionsremoving the unserviceable burnt outPower drive of CRANE / LIFT, S&F and fix new Main Hoist Variable Frequency Drive of model Acs 380 series (15 to 20 HP, 11 to 15 KW)make ABB ORequivalent in Yasakawa, Siemens, L&T, CG, including programming by OEM Engineer and testing complete all as specified and directed. |
| 43 | Disconnecting electrical connectionsremoving the unserviceable burnt outPower drive of CRANE / LIFT, S&F and fix new Main Hoist Variable Frequency Drive of model Acs 380 series (25 to 30 HP, 18.5 to 22.5 KW) make ABB ORequivalent in Yasakawa, Siemens, L&T, CG, including programming by OEM Engineer and testing complete all as specified and directed. |
| 44 | S&F FRLS PVC insulated 4core 4Sqmm, multistranded copper conductor cable, 1100Volts, ISI marked complete all as specified. |
| 45 | S&F FRLS PVC insulated 4core 2.5Sqmm, multistranded copper conductor cable, 1100Volts, ISI marked complete all as specified.Make for item No1 to 6 Finolex, Havells, RPG/Gloster |
| 46 | S&F, ML 2, 3 pole contactor with AC3 rating of 32Amps with suitable coil voltage complete all as specified.Make: L&T CAT No SS90701 or equivalent in Legrand / Siemens / BCH / Schneider |
| 47 | S&F Flexible geared coupling of any size complete all as directed. |
| 48 | Dismantling of Long travel assembly complete from all electrical connections, repairs to damaged long travel system by replacing with new gear and coupling, pedestal and modifying motor and gear box, platform by cutting, welding and reassembling the long travel assembly, reconnecting electrical connections, testing and commissioning of crane for smooth operation of long travel system for 20/25 Ton EOT crane complete all as directed. |
| 49 | Dismantling of cross travel assembly complete from all electrical connections, repairs to damaged long travel system by replacing with new gear and coupling, pedestal and modifying motor and gear box, platform by cutting, welding and reassembling the long travel assembly, reconnecting electrical connections, testing and commissioning of crane for smooth operation of long travel system for 2 to 10 Ton EOT crane |
| 50 | Dismantling of Main hoist assembly complete from all electrical connections, repairs to hoist by replacing with new gear and coupling, pedestal and modifying motor and gear box, platform by cutting, welding and reconnecting electrical connections, testing and commissioning of crane for smooth operation of long travel system for 2 to 10 Ton EOT crane |
| 51 | Dismantling of gear box of Any capacity EOT CRANE OR LIFT by opening long travel shaft and transporting to local workshop opening of gear box, replacement of broken damaged brass gears 06 No of different sizes, replacement of bearings 02 No, Oil-seal, \"O\" Rings, Thrust washer, Retaining spring, Lock washers, Gasket and reassembling of gear box completely after repairing returning back to site, refixing in the original position, and testing for smooth functioning complete all directed. |
| 52 | S&F in repairs 160Amp HRC fuse DIN type carrier male female type with HRC fuses complete all as directed. |
| 53 | Allas per item No 47 above but 100Amp capacity. |
| 54 | Allas per item No 47 above but 63Amp capacity. |
| 55 | Allas per item No 47 above but 32Amp capacity. |
| 56 | S&F Steel wire rope for main hoist of size 10mm complete as specified |
| 57 | S&F Steel wire rope for main hoist of size 12mm complete as specified |
| 58 | Dismantling of cross trave/long travelassembly mechanical parts and reapairing of girders/wheels by fabrication work also do necessary wheel diagnosis requires at site for all capacity cranes all as directed and specified. |
| 59 | Outsourcing of services for attendentof One No. of Lift at AVC (Director Building), andoneNo of Lift at ELSEC, One No of lift at QR Lab, One no of lift at MPDMS of any make and capacity, by providing Four (4)Lift attendentper shift of 8 hours for One shift in a day on all days excluding Sundays and Holidays complete all as specified and directed. |
| 60 | Notes for the Serial Item No. 54: (a) All stationary forAttendance register, Wages register, maintenance record, safety measure equpments like shoes, gloves etc., shall bearranged, maintained and submitted by the contractor to Engineer in charge in the first week of every month Note: the cost of all items included in the quoted rate. (b) Any loss due to negligence, faulty operation shall be made good by the contractor without any extra cost to the department. (c ) Wage period shall not delayed 15 days. Wages for all workers employed shall be paid before 5th day of every month through bank account without fail irrespective ofwhether RAR is claimed or not. (d) Minimum wages, EPF, ESI etc., to the workers shall be paid by the contractor as per Regional Labour Commissioner, Gazette Notification including DA all as authorized. (e) Non compliance on the part of contractor for not making payment of wages to workers as stipulated above shall attract penalty at the rate of Rs. 100.00 per shift per worker from RAR Final Bill. No claim whatsoever on this account will be entertained |