|
| 1 | Material and Labour for developing lawn with Bermuda Grassincluding necessary earth work excavation upto 30 cm depth in any type of soil, removing all stone, pebble, weeds, debris from excavated ground and removing excavated soilupto a distance of 250m to 500m and levelling of ground, applying of garden soil 15cm thick obtained from approved location which is free from stone pebble, weeds etc and manure in the proportion of 3:1 complete all as specified and directed. |
| 2 | Material and Labour for developing Royal Palms ( height 2.00 m above GL) by digging pits of size 60 x 60 x 60 cm and filling with soil obtained from approved location up to 50% height and balance with garden soil mixed with manure 3:1 ratio, plantingtrees of height above ground level , Removal of surplus soil, all construction debris, weeds to a distance exc 250m but not exc 500m, applying soil pesticides, routing, watering complete all as specified and directed. |
| 3 | Material and Labour for developing Date Palms ( height 2.00 m above GL) by digging pits of size 60 x 60 x 60 cm and filling with soil obtained from approved location up to 50% height and balance with garden soil mixed with manure 3:1 ratio, plantingtrees of height above ground level , Removal of surplus soil, all construction debris, weeds to a distance exc 250m but not exc 500m, applying soil pesticides, routing, watering complete all as specified and directed. |
| 4 | Material and Labour for developing Cycas Revoulta ( height 0.3 m above GL) by digging pits of size 30 x 30 x 30 cm and filling with soil obtained from approved location up to 50% height and balance with garden soil mixed with manure 3:1 ratio, plantingtrees of height above ground level , Removal of surplus soil, all construction debris, weeds to a distance exc 250m but not exc 500m, applying soil pesticides, routing, watering complete all as specified and directed. |
| 5 | Material and Labour for developing Boundary trees( height 1.50 m above GL) by digging pits of size 30 x 30 x 30 cm and filling with soil obtained from approved location up to 50% height and balance with garden soil mixed with manure 3:1 ratio, plantingtrees of height above ground level , Removal of surplus soil, all construction debris, weeds to a distance exc 250m but not exc 500m, applying soil pesticides, routing, watering complete all as specified and directed. |
| 6 | Material and Labour for developing Hedges and Planting ( height 0.30 m above GL) by digging pits of size 30 x 30 x 30 cm and filling with soil obtained from approved location up to 50% height and balance with garden soil mixed with manure 3:1 ratio, plantingtrees of height above ground level , Removal of surplus soil, all construction debris, weeds to a distance exc 250m but not exc 500m, applying soil pesticides, routing, watering complete all as specified and directed. |
| 7 | Material and Labour for developing Avenue trees( height 1.50 m above GL) by digging pits of size 30 x 30 x 30 cm and filling with soil obtained from approved location up to 50% height and balance with garden soil mixed with manure 3:1 ratio, plantingtrees of height above ground level , Removal of surplus soil, all construction debris, weeds to a distance exc 250m but not exc 500m, applying soil pesticides, routing, watering complete all as specified and directed. |
| 8 | M & L for Filling soil mixture of garden (3:1) Complete all as directed and as specified. |