| 1 | Laying and Jointing PVC Pipe. Heading |
| 2 | Box cutting in road embankment in all kinds of soil & spreading the soil uniformly over the flanks & consolidating & dressing the sub-grade to correct camber & grade. |
| 3 | Brick edging 75 mm wide with picked jhama bricks, laid true to line and level including cutting necessary trench in soil or in hard metalled surface, laying the bricks and repacking the trench (on both side of the edging) with spoils and ramming the same thoroughly complete as per direction.(b) Brick-on-end edging (250 mm) depth. |
| 4 | Brick soling with picked jhama bricks including preparation of bed as necessary with brick joints properly filled in and packed with powdered earth and including necessary cushion of similar material below the soling (and in between layers when more than one layer is used) completes as per direction. (f) Soling or dry pavement with one brick-on-edge laid in herring bone pattern over a layer of brick flat (thickness 125 mm plus 75 mm) |
| 5 | Supplying,laying ,fitting &fixing R.C.C spun pipes and collers with cement morter (1:3) including fixing the pipes collers with jute,pitch etc. including the cost and carriage of spun pipes at site excluding the cost of collars.a) Spun pipes-300 dia, NP-2 Grade |
| 6 | Supplying RCC spun pipe collars including loading , carriage , unloading at site.a)Collar-300 dia, NP2 Grade |
| 7 | Construction of Sign Board with 0.45m x 0.60m(height) granite slab of 15-18mm thk.engraving the lettering over it as directed by the E.I.C. fitting and fixing complete over brick masonry (with 4:1 cement mortar) platform covered with 4:1 sand-cement plaster with neat cement punning all complete as per direction & design supplied by the E.I.C. |
| 8 | Earthwork from borrow pits over existing embankment or for repairs to embankment, closing breaches etc. within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as per profile.b) Where land for earth owned/arranged by the contractor. |
| 9 | Extra rate over Item Nos.1.01 for all kinds of soil for every additional lead of 30 metres or part thereof beyond the initial lead of 30 metres. One extra lead. |
| 10 | Two extra lead. |
| 11 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile,levellingasper direction ofthe Engineer-in-charge within a lead of,NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking. A) Beyond 500 metre and upto 1.00 km |
| 12 | Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter. (Dia. to be measured at mid length). |
| 13 | Driving bamboo pins in standing or flowing water including scaffolding and driving appliances.(a) Where boats are not necessary. |
| 14 | Supplying, fitting and fixing with iron nails half split bamboo wailing pieces (av. dia. of bamboo not less than 5.0 cm.) |
| 15 | Supplying empty Cement bags in good condition. |
| 16 | Filling empty Cement bags with dry earth or sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but excluding cost of filling materials, (Earth or sand) and gunny bags. |
| 17 | Fine dressing and making the crest to correct camber and gtrade by cutting and filling earth where necessary including extra earth. |
| 18 | Add 18% for GST |
| 19 | Add 1% Cess Please Enable Macros to View BoQ information |