| Sl. No. | Item Description |
| 1 | Earthworkexcavationinallclassesofsoilsexcepthardrockrequiringblastingand depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, removal of other deleterious matter andobstructions,trimmingofbottomofexcavationbackfilling,clearingupthesiteand disposalofallsurplusmaterialsetc.,completeasperstandardspecification.ForBoxing including conveyance of sut earth away from the site with average lead |
| 2 | Construction of GranularSub-Base by providing close graded Material, mixing in a mechanical mixplant at OMC, carriage of mixedMaterial toworksite, spreading in uniformlayers withmotorgraderon preparedsurface andcompactingwithvibratorysoil compactor to achieve the desired density, complete as per clause 401 & IRC 37 -2018 (Grade-III) & IRC 37-2018 |
| 3 | Construction of GranularSub-Base by providing close graded Material, mixing in a mechanical mixplant at OMC, carriage of mixedMaterial toworksite, spreading in uniformlayers withmotorgraderon preparedsurface andcompactingwithvibratorysoil compactor to achieve the desired density, complete as per clause 401& IRC 37 -2018 (Grade-V)& IRC 37-2018 |
| 4 | Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheivethe desireddensity including cost ofmaterial, labourcharges, rentalsfor machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 |
| 5 | ProvidingandlayingPrimeCoatoverWBM/WMMsurfaceusing7KgofEmulsion Bitumen (SS1) per 10 sqm for preparatoryto another bituminous constructionover it, includingcostofmaterial,labourcharges,rentalsformachinery,fuelandallother incidental charges etc., complete as perClause 502 of MORTH Rev-5 |
| 6 | ProvidingandlayingTackCoatoverWBM/WMMsurface(treatedwithprimer) using2.50KgofBitumenEmulsion(RS1)per10sqmforpreparatorytoanother bituminous construction over itincluding cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,complete as per Clause 503 of MORTH Rev-5 |
| 7 | ProvidingandlayingTackCoatoverExistingBTsurfaceusing2KgofBitumen Emulsion(RS1)per10sqmforpreparatorytoanotherbituminousconstruction overitincludingcostofmaterial,labourcharges,rentalsformachinery,fueland all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 |
| 8 | Providing and laying Tack Coat over Dry Lean Cement Concrete surface using 3.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery,fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 |
| 9 | Providing, laying 50mm consolidated thick Dense Bituminous Macadam using 0.40cum of37.50-13.20mm, 0.35cum of 13.20-2.36mm and 0.36cum of 2.36mm & below size IRC metalwith 71.30kgs of VG30 grade bitumen for premixing per 10sqm including cost and conveyanceof all materials to CMP site, heating the bitumen, aggregate and mixing them in the requiredtemperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to site, spreading the mix to uniform thickness of 75mm with mechanical paver to the specifiedgrades and cross sections and consolidated by Vibratory Roller to the required density etc.,including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMPas per clause 505 of MORTH rev-5. (Grade-II) |
| 10 | ProvidingandlayingBituminousConcreteto30mmthickusing0.13cumof19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heatingthebitumenandaggregatetorequiredtemperatureandmixingtheminrequired temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paversite,spreadingthemixtouniformthicknessof40mmwithmechanicalpavertothe specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 tCMPwithbitumen boiler,tipper trucks,Paver Finisher,Vibratory roller andallothertoolsandplantrequired,includingfuelandallotherincidentalchargesetc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 (Grade-II) |
| 11 | ProvidingandlayingBituminousConcreteto50mmthickusing0.13cumof19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heatingthebitumenandaggregatetorequiredtemperatureandmixingtheminrequired temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paversite,spreadingthemixtouniformthicknessof40mmwithmechanicalpavertothe specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 tCMPwithbitumen boiler,tipper trucks,Paver Finisher,Vibratory roller andallothertoolsandplantrequired,includingfuelandallotherincidentalchargesetc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 (Grade-I) |
| 12 | Providing compaction for embankment / making up of low berms using the availablebox cut earth including all hire and fuel charges for power roller for compaction, watersprinkler, including all labour charges for laying, spreading, watering etc., complete and asdirected by the departmental engineers |
| 13 | Reconstruction of single cell Box culvert2.0m X 1.5m at Km 3/4of Thirumanur - Elakkurichy Thoothur roadDismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc,as per MORTH Specification Dismantling Stone / Masonry Cement mortar walls under 3m high. |
| 14 | Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bankwith all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion, backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for Foundation for Box Culvert and Wing wall. |
| 15 | Plain Cement Concrete of grade M15 (Nominal mix) using 40mm ISS hard broken granite metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for LEVELLING COURSE BELOW of Box Culvert and Wing wall. |
| 16 | Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges forlaying,compacting, curing all incidental charges etc., complete for Wing wall and Parapet |
| 17 | Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges forlaying,compacting, curing all incidental charges etc., complete for Wing wall and Parapet |
| 18 | Vibrated Reinforced cement concrete of grade M25 (Design mix) using 20mm ISS hard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for for Box culvert |
| 19 | Supply and fabrication of steel Grade Fe-500 D required for all RCC items of works involved in the schedule including cost of steel cost of fabrication labour charges for cleaning the rods straightening cutting bending tying grills hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc. complete as per standard specification |
| 20 | Providing and fixing 110mm dia PVC SEEPAGE PIPES of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite cost and labour for semi-sperical back fill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to drain the back fill as per standard specifications |
| 21 | Refilling with excavated soil (other than sand) complying with standard specification for filling in foundation and basement |
| 22 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with average lead of km and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For Carted Earth with compaction for diversion road with conveyance of2Kms Lead. |
| 23 | Supply of NP3 Class 1000mm dia RCC Pipe conforming to IS 458/2003 including cost of pipe as a finished work including all other incidental charges, testing charges including loading,unloading, transport and delivery in good condition at work site etc., complete, as directed by the Departmental Officers and as per standard specifications. |
| 24 | Hoisting and fixing of NP3 Class 1000mm dia RCC Pipe and Collars in proper gradient including all labour charges and all other incidental charges etc., complete, as directed by the Departmental Officers and as per standard specifications. |
| 25 | Granular Sub-base with Graded Material (Table:400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401) - for Grading-V |
| 26 | Reconstruction of single cell Box culvert2.0m X 1.5m at Km 3/8 of Thirumanur - Elakkurichy Thoothur roadDismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc,as per MORTH Specification Dismantling Stone / Masonry Cement mortar walls under 3m high. |
| 27 | Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bankwith all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion, backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for Foundation for Box Culvert and Wing wall. |
| 28 | Plain Cement Concrete of grade M15 (Nominal mix) using 40mm ISS hard broken granite metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for LEVELLING COURSE BELOW of Box Culvert and Wing wall. |
| 29 | Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges forlaying,compacting, curing all incidental charges etc., complete for Wing wall and Parapet |
| 30 | Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges forlaying,compacting, curing all incidental charges etc., complete for Wing wall and Parapet |
| 31 | Vibrated Reinforced cement concrete of grade M25 (Design mix) using 20mm ISS hard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for for Box culvert |
| 32 | Supply and fabrication of steel Grade Fe-500required for all RCC items of works involved in the schedule including cost of steel cost of fabrication labour charges for cleaning the rods straightening cutting bending tying grills hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc. complete as per standard specification |
| 33 | Providing and fixing 110mm dia PVC SEEPAGE PIPES of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite cost and labour for semi-sperical back fill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to drain the back fill as per standard specifications |
| 34 | Refilling with excavated soil (other than sand) complying with standard specification for filling in foundation and basement |
| 35 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with average lead of km and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For Carted Earth with compaction for diversion road with conveyance of2Kms Lead. |
| 36 | Supply of NP3 Class 1000mm dia RCC Pipe conforming to IS 458/2003 including cost of pipe as a finished work including all other incidental charges, testing charges including loading,unloading, transport and delivery in good condition at work site etc., complete, as directed by the Departmental Officers and as per standard specifications. |
| 37 | Hoisting and fixing of NP3 Class 1000mm dia RCC Pipe and Collars in proper gradient including all labour charges and all other incidental charges etc., complete, as directed by the Departmental Officers and as per standard specifications. |
| 38 | Granular Sub-base with Graded Material (Table:400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401) - for Grading-V |
| 39 | Reconstruction of single cell Box culvert2.0m X 1.5m at Km 3/10 of Thirumanur - Elakkurichy Thoothur roadDismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc,as per MORTH Specification Dismantling Stone / Masonry Cement mortar walls under 3m high. |
| 40 | Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bankwith all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion, backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for Foundation for Box Culvert and Wing wall. |
| 41 | Plain Cement Concrete of grade M15 (Nominal mix) using 40mm ISS hard broken granite metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for LEVELLING COURSE BELOW of Box Culvert and Wing wall. |
| 42 | Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges forlaying,compacting, curing all incidental charges etc., complete for Wing wall and Parapet |
| 43 | Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges forlaying,compacting, curing all incidental charges etc., complete for Wing wall and Parapet |
| 44 | Vibrated Reinforced cement concrete of grade M25 (Design mix) using 20mm ISS hard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for for Box culvert |
| 45 | Supply and fabrication of steel Grade Fe-500required for all RCC items of works involved in the schedule including cost of steel cost of fabrication labour charges for cleaning the rods straightening cutting bending tying grills hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc. complete as per standard specification |
| 46 | Providing and fixing 110mm dia PVC SEEPAGE PIPES of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite cost and labour for semi-sperical back fill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to drain the back fill as per standard specifications |
| 47 | Refilling with excavated soil (other than sand) complying with standard specification for filling in foundation and basement |
| 48 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with average lead of km and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For Carted Earth with compaction for diversion road with conveyance of2Kms Lead. |
| 49 | Supply of NP3 Class 1000mm dia RCC Pipe conforming to IS 458/2003 including cost of pipe as a finished work including all other incidental charges, testing charges including loading,unloading, transport and delivery in good condition at work site etc., complete, as directed by the Departmental Officers and as per standard specifications. |
| 50 | Hoisting and fixing of NP3 Class 1000mm dia RCC Pipe and Collars in proper gradient including all labour charges and all other incidental charges etc., complete, as directed by the Departmental Officers and as per standard specifications. |
| 51 | Granular Sub-base with Graded Material (Table:400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401) - for Grading-V |
| 52 | Reconstruction of single cell Box culvert2.0m X 1.5m at Km 4/6,4/8 (i), (Ii) & 4/10 of Thirumanur - Elakkurichy Thoothur roadDismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc,as per MORTH Specification Dismantling Stone / Masonry Cement mortar walls under 3m high. |
| 53 | Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bankwith all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion, backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for Foundation for Box Culvert and Wing wall. |
| 54 | Plain Cement Concrete of grade M15 (Nominal mix) using 40mm ISS hard broken granite metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for LEVELLING COURSE BELOW of Box Culvert and Wing wall. |
| 55 | Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges forlaying,compacting, curing all incidental charges etc., complete for Wing wall and Parapet |
| 56 | Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges forlaying,compacting, curing all incidental charges etc., complete for Wing wall and Parapet |
| 57 | Vibrated Reinforced cement concrete of grade M25 (Design mix) using 20mm ISS hard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for for Box culvert |
| 58 | Supply and fabrication of steel Grade Fe-500required for all RCC items of works involved in the schedule including cost of steel cost of fabrication labour charges for cleaning the rods straightening cutting bending tying grills hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc. complete as per standard specification |
| 59 | Providing and fixing 110mm dia PVC SEEPAGE PIPES of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite cost and labour for semi-sperical back fill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to drain the back fill as per standard specifications |
| 60 | Refilling with excavated soil (other than sand) complying with standard specification for filling in foundation and basement |
| 61 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with average lead of km and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For Carted Earth with compaction for diversion road with conveyance of2Kms Lead. |
| 62 | Supply of NP3 Class 1000mm dia RCC Pipe conforming to IS 458/2003 including cost of pipe as a finished work including all other incidental charges, testing charges including loading,unloading, transport and delivery in good condition at work site etc., complete, as directed by the Departmental Officers and as per standard specifications. |
| 63 | Hoisting and fixing of NP3 Class 1000mm dia RCC Pipe and Collars in proper gradient including all labour charges and all other incidental charges etc., complete, as directed by the Departmental Officers and as per standard specifications. |
| 64 | Granular Sub-base with Graded Material (Table:400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401) - for Grading-V |
| 65 | Reconstruction of single cell Box culvert2.0m X 1.5m at Km 5/6 of Thirumanur - Elakkurichy Thoothur roadDismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc,as per MORTH Specification Dismantling Stone / Masonry Cement mortar walls under 3m high. |
| 66 | Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bankwith all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion, backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for Foundation for Box Culvert and Wing wall. |
| 67 | Plain Cement Concrete of grade M15 (Nominal mix) using 40mm ISS hard broken granite metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for LEVELLING COURSE BELOW of Box Culvert and Wing wall. |
| 68 | Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges forlaying,compacting, curing all incidental charges etc., complete for Wing wall and Parapet |
| 69 | Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges forlaying,compacting, curing all incidental charges etc., complete for Wing wall and Parapet |
| 70 | Vibrated Reinforced cement concrete of grade M25 (Design mix) using 20mm ISS hard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for for Box culvert |
| 71 | Supply and fabrication of steel Grade Fe-500 D required for all RCC items of works involved in the schedule including cost of steel cost of fabrication labour charges for cleaning the rods straightening cutting bending tying grills hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc. complete as per standard specification |
| 72 | Providing and fixing 110mm dia PVC SEEPAGE PIPES of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite cost and labour for semi-sperical back fill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to drain the back fill as per standard specifications |
| 73 | Refilling with excavated soil (other than sand) complying with standard specification for filling in foundation and basement |
| 74 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with average lead of km and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For Carted Earth with compaction for diversion road with conveyance of2Kms Lead. |
| 75 | Supply of NP3 Class 1000mm dia RCC Pipe conforming to IS 458/2003 including cost of pipe as a finished work including all other incidental charges, testing charges including loading,unloading, transport and delivery in good condition at work site etc., complete, as directed by the Departmental Officers and as per standard specifications. |
| 76 | Hoisting and fixing of NP3 Class 1000mm dia RCC Pipe and Collars in proper gradient including all labour charges and all other incidental charges etc., complete, as directed by the Departmental Officers and as per standard specifications. |
| 77 | Granular Sub-base with Graded Material (Table:400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401) - for Grading-V |
| 78 | Reconstruction of single cell Box culvert3.0m X 3.0m at Km 5/10 of Thirumanur - Elakkurichy Thoothur roadDismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc,as per MORTH Specification Dismantling Stone / Masonry Cement mortar walls under 3m high. |
| 79 | Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bankwith all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion, backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for Foundation for Box Culvert and Wing wall. |
| 80 | Plain Cement Concrete of grade M15 (Nominal mix) using 40mm ISS hard broken granite metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for LEVELLING COURSE BELOW of Box Culvert and Wing wall. |
| 81 | Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges forlaying,compacting, curing all incidental charges etc., complete for Wing wall and Parapet |
| 82 | Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges forlaying,compacting, curing all incidental charges etc., complete for Wing wall and Parapet |
| 83 | Vibrated Reinforced cement concrete of grade M25 (Design mix) using 20mm ISS hard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for for Box culvert |
| 84 | Supply and fabrication of steel Grade Fe-500required for all RCC items of works involved in the schedule including cost of steel cost of fabrication labour charges for cleaning the rods straightening cutting bending tying grills hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc. complete as per standard specification |
| 85 | Providing and fixing 110mm dia PVC SEEPAGE PIPES of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite cost and labour for semi-sperical back fill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to drain the back fill as per standard specifications |
| 86 | Refilling with excavated soil (other than sand) complying with standard specification for filling in foundation and basement |
| 87 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with average lead of km and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For Carted Earth with compaction for diversion road with conveyance of2Kms Lead. |
| 88 | Supply of NP3 Class 1000mm dia RCC Pipe conforming to IS 458/2003 including cost of pipe as a finished work including all other incidental charges, testing charges including loading,unloading, transport and delivery in good condition at work site etc., complete, as directed by the Departmental Officers and as per standard specifications. |
| 89 | Hoisting and fixing of NP3 Class 1000mm dia RCC Pipe and Collars in proper gradient including all labour charges and all other incidental charges etc., complete, as directed by the Departmental Officers and as per standard specifications. |
| 90 | Granular Sub-base with Graded Material (Table:400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401) - for Grading-V |
| 91 | Reconstruction of Two cell Box culvert 3.0m X 2.0m at Km 7/2 of Thirumanur - Elakkurichy Thoothur roadDismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc,as per MORTH Specification Dismantling Stone / Masonry Cement mortar walls under 3m high. |
| 92 | Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bankwith all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion, backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for Foundation for Box Culvert and Wing wall. |
| 93 | Plain Cement Concrete of grade M15 (Nominal mix) using 40mm ISS hard broken granite metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for LEVELLING COURSE BELOW of Box Culvert and Wing wall. |
| 94 | Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges forlaying,compacting, curing all incidental charges etc., complete for Wing wall and Parapet |
| 95 | Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges forlaying,compacting, curing all incidental charges etc., complete for Wing wall and Parapet |
| 96 | Vibrated Reinforced cement concrete of grade M25 (Design mix) using 20mm ISS hard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for for Box culvert |
| 97 | Supply and fabrication of steel Grade Fe-500required for all RCC items of works involved in the schedule including cost of steel cost of fabrication labour charges for cleaning the rods straightening cutting bending tying grills hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc. complete as per standard specification |
| 98 | Providing and fixing 110mm dia PVC SEEPAGE PIPES of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite cost and labour for semi-sperical back fill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to drain the back fill as per standard specifications |
| 99 | Refilling with excavated soil (other than sand) complying with standard specification for filling in foundation and basement |
| 100 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with average lead of km and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For Carted Earth with compaction for diversion road with conveyance of2Kms Lead. |
| 101 | Supply of NP3 Class 1000mm dia RCC Pipe conforming to IS 458/2003 including cost of pipe as a finished work including all other incidental charges, testing charges including loading,unloading, transport and delivery in good condition at work site etc., complete, as directed by the Departmental Officers and as per standard specifications. |
| 102 | Hoisting and fixing of NP3 Class 1000mm dia RCC Pipe and Collars in proper gradient including all labour charges and all other incidental charges etc., complete, as directed by the Departmental Officers and as per standard specifications. |
| 103 | Granular Sub-base with Graded Material (Table:400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401) - for Grading-V |
| 104 | Reconstruction of single cell Box culvert2.0m X 1.5m at Km 7/8 of Thirumanur - Elakkurichy Thoothur roadDismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc,as per MORTH Specification Dismantling Stone / Masonry Cement mortar walls under 3m high. |
| 105 | Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bankwith all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion, backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for Foundation for Box Culvert and Wing wall. |
| 106 | Plain Cement Concrete of grade M15 (Nominal mix) using 40mm ISS hard broken granite metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for LEVELLING COURSE BELOW of Box Culvert and Wing wall. |
| 107 | Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges forlaying,compacting, curing all incidental charges etc., complete for Wing wall and Parapet |
| 108 | Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges forlaying,compacting, curing all incidental charges etc., complete for Wing wall and Parapet |
| 109 | Vibrated Reinforced cement concrete of grade M25 (Design mix) using 20mm ISS hard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for for Box culvert |
| 110 | Supply and fabrication of steel Grade Fe-500required for all RCC items of works involved in the schedule including cost of steel cost of fabrication labour charges for cleaning the rods straightening cutting bending tying grills hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc. complete as per standard specification |
| 111 | Providing and fixing 110mm dia PVC SEEPAGE PIPES of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite cost and labour for semi-sperical back fill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to drain the back fill as per standard specifications |
| 112 | Refilling with excavated soil (other than sand) complying with standard specification for filling in foundation and basement |
| 113 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with average lead of km and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For Carted Earth with compaction for diversion road with conveyance of2Kms Lead. |
| 114 | Supply of NP3 Class 1000mm dia RCC Pipe conforming to IS 458/2003 including cost of pipe as a finished work including all other incidental charges, testing charges including loading,unloading, transport and delivery in good condition at work site etc., complete, as directed by the Departmental Officers and as per standard specifications. |
| 115 | Hoisting and fixing of NP3 Class 1000mm dia RCC Pipe and Collars in proper gradient including all labour charges and all other incidental charges etc., complete, as directed by the Departmental Officers and as per standard specifications. |
| 116 | Granular Sub-base with Graded Material (Table:400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401) - for Grading-V |
| 117 | Construction of Two cell Box culvert2.0m X 2.0 m at Km 7/8 of Thirumanur - Elakkurichy Thoothur roadEarth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bankwith all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion, backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for Foundation for Box Culvert and Wing wall. |
| 118 | Plain Cement Concrete of grade M15 (Nominal mix) using 40mm ISS hard broken granite metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for LEVELLING COURSE BELOW of Box Culvert and Wing wall. |
| 119 | Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges forlaying,compacting, curing all incidental charges etc., complete for Wing wall and Parapet |
| 120 | Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges forlaying,compacting, curing all incidental charges etc., complete for Wing wall and Parapet |
| 121 | Vibrated Reinforced cement concrete of grade M25 (Design mix) using 20mm ISS hard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for for Box culvert |
| 122 | Supply and fabrication of steel Grade Fe-500required for all RCC items of works involved in the schedule including cost of steel cost of fabrication labour charges for cleaning the rods straightening cutting bending tying grills hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc. complete as per standard specification |
| 123 | Providing and fixing 110mm dia PVC SEEPAGE PIPES of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite cost and labour for semi-sperical back fill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to drain the back fill as per standard specifications |
| 124 | Refilling with excavated soil (other than sand) complying with standard specification for filling in foundation and basement |
| 125 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with average lead of km and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For Carted Earth with compaction for diversion road with conveyance of2Kms Lead. |
| 126 | Supply of NP3 Class 1000mm dia RCC Pipe conforming to IS 458/2003 including cost of pipe as a finished work including all other incidental charges, testing charges including loading,unloading, transport and delivery in good condition at work site etc., complete, as directed by the Departmental Officers and as per standard specifications. |
| 127 | Hoisting and fixing of NP3 Class 1000mm dia RCC Pipe and Collars in proper gradient including all labour charges and all other incidental charges etc., complete, as directed by the Departmental Officers and as per standard specifications. |
| 128 | Granular Sub-base with Graded Material (Table:400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401) - for Grading-V |
| 129 | Picking existing B.T surface of varying thickness and removing the picked surface to a distance up to 100m and lift upto 3m away from site as directed by departmental officers including charges for tools and plants and all other incidental charges etc., complete-as per cl 202 of MORT&H specification (V Revision) |
| 130 | Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheivethe desireddensity including cost ofmaterial, labourcharges, rentalsfor machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 |
| 131 | ProvidingandlayingPrimeCoatoverWBM/WMMsurfaceusing7KgofEmulsion Bitumen (SS1) per 10 sqm for preparatoryto another bituminous constructionover it, includingcostofmaterial,labourcharges,rentalsformachinery,fuelandallother incidental charges etc., complete as perClause 502 of MORTH Rev-5 |
| 132 | ProvidingandlayingTackCoatoverWBM/WMMsurface(treatedwithprimer) using2.50KgofBitumenEmulsion(RS1)per10sqmforpreparatorytoanother bituminous construction over itincluding cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,complete as per Clause 503 of MORTH Rev-5 |
| 133 | Reconstruction of single cell Box culvert2.0m X 1.5m at Km 8/6(i), 8/6 (ii) of Thirumanur - Elakkurichy Thoothur roadDismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc,as per MORTH Specification Dismantling Stone / Masonry Cement mortar walls under 3m high. |
| 134 | Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bankwith all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion, backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for Foundation for Box Culvert and Wing wall. |
| 135 | Plain Cement Concrete of grade M15 (Nominal mix) using 40mm ISS hard broken granite metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for LEVELLING COURSE BELOW of Box Culvert and Wing wall. |
| 136 | Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges forlaying,compacting, curing all incidental charges etc., complete for Wing wall and Parapet |
| 137 | Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges forlaying,compacting, curing all incidental charges etc., complete for Wing wall and Parapet |
| 138 | Vibrated Reinforced cement concrete of grade M25 (Design mix) using 20mm ISS hard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for for Box culvert |
| 139 | Supply and fabrication of steel Grade Fe-500 D required for all RCC items of works involved in the schedule including cost of steel cost of fabrication labour charges for cleaning the rods straightening cutting bending tying grills hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc. complete as per standard specification |
| 140 | Providing and fixing 110mm dia PVC SEEPAGE PIPES of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite cost and labour for semi-sperical back fill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to drain the back fill as per standard specifications |
| 141 | Refilling with excavated soil (other than sand) complying with standard specification for filling in foundation and basement |
| 142 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with average lead of km and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For Carted Earth with compaction for diversion road with conveyance of2Kms Lead. |
| 143 | Supply of NP3 Class 1000mm dia RCC Pipe conforming to IS 458/2003 including cost of pipe as a finished work including all other incidental charges, testing charges including loading,unloading, transport and delivery in good condition at work site etc., complete, as directed by the Departmental Officers and as per standard specifications. |
| 144 | Hoisting and fixing of NP3 Class 1000mm dia RCC Pipe and Collars in proper gradient including all labour charges and all other incidental charges etc., complete, as directed by the Departmental Officers and as per standard specifications. |
| 145 | Granular Sub-base with Graded Material (Table:400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401) - for Grading-V |
| 146 | Construction of PCC Retaining Wall at Km 3/2( RHS) Earthwork excavation in all classes of soil such as hard stiff clay, stiff black cotton soil, hard red earth, shales, muram, gravel, stone earth etc., depositing on bank with all leads and lifts as per SS 20 B and all other incidental charges such as baling out water, shoring, strutting, walling, and forming protective bund wherever necessary etc., complete as directed by the Engineer as per MORTHNo. 111, 112, 304. for Foundation |
| 147 | Stone dust filling from approved quarry metal quarry from approved quarry including cost and conveyance of all materials to site including labour charges for filling and all other incidental charges etc. complete. |
| 148 | Plain Cement Concrete M15 Mix using 40mm ISS size HBGmetal including cost and conveyance of all materials to site including cost of cement, centering,soft water, labour charges for mixing, transporting, layingand curing concrete , working at depths , tools and plants employed and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications as directed by the Engineer for Foundationas per MORTH No. 111, 112, 900, 1000, 1500, 1700, 2100 |
| 149 | Vibrated Cement Concrete M20Mix using 40mm ISS size HBGmetal including cost and conveyance of all materials to site including cost of cement, centering,soft water, labour charges for mixing, transporting, layingand curing concrete , working at depths , tools and plants employed and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications as directed by the Engineer for Foundationas per MORTH No. 111, 112, 900, 1000, 1500, 1700, 2100 (Below Sill Level) |
| 150 | Vibrated Cement ConcreteM20 (Nominal Mix) using 40mm ISS size HBGmetal including cost and conveyance of all materials to site including cost of cement,centering,soft water, labour charges for mixing, transporting, layingand curing concrete , working at depths , tools and plants employed and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications as directed by the Engineer for as per MORTH No. 111, 112, 900, 1000, 1500, 1700, 2100 (Above Sill Level) |
| 151 | Providing and fixing 110mm dia PVC seepage pipes of requied length for abutments and wngs including cost and conveyance of all materials to work site, cost and labour semi sperical backfill arrangements with 100mm size graniet stone at the periphery and labour charges for fixing etc., complete to drain the backfil as per standard specificationas per MORTH No.2706 |
| 152 | Construction of PCC Retaining Wall at Km 4/6 (LHS)Earthwork excavation in all classes of soil such as hard stiff clay, stiff black cotton soil, hard red earth, shales, muram, gravel, stone earth etc., depositing on bank with all leads and lifts as per SS 20 B and all other incidental charges such as baling out water, shoring, strutting, walling, and forming protective bund wherever necessary etc., complete as directed by the Engineer as per MORTHNo. 111, 112, 304. for Foundation |
| 153 | Stone dust filling from approved quarry metal quarry from approved quarry including cost and conveyance of all materials to site including labour charges for filling and all other incidental charges etc. complete. |
| 154 | Plain Cement Concrete M15 Mix using 40mm ISS size HBGmetal including cost and conveyance of all materials to site including cost of cement, centering,soft water, labour charges for mixing, transporting, layingand curing concrete , working at depths , tools and plants employed and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications as directed by the Engineer for Foundationas per MORTH No. 111, 112, 900, 1000, 1500, 1700, 2100 |
| 155 | Vibrated Cement Concrete M20Mix using 40mm ISS size HBGmetal including cost and conveyance of all materials to site including cost of cement, centering,soft water, labour charges for mixing, transporting, layingand curing concrete , working at depths , tools and plants employed and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications as directed by the Engineer for Foundationas per MORTH No. 111, 112, 900, 1000, 1500, 1700, 2100 (Below Sill Level) |
| 156 | Vibrated Cement ConcreteM20 (Nominal Mix) using 40mm ISS size HBGmetal including cost and conveyance of all materials to site including cost of cement,centering,soft water, labour charges for mixing, transporting, layingand curing concrete , working at depths , tools and plants employed and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications as directed by the Engineer for as per MORTH No. 111, 112, 900, 1000, 1500, 1700, 2100 (Above Sill Level) |
| 157 | Providing and fixing 110mm dia PVC seepage pipes of requied length for abutments and wngs including cost and conveyance of all materials to work site, cost and labour semi sperical backfill arrangements with 100mm size graniet stone at the periphery and labour charges for fixing etc., complete to drain the backfil as per standard specificationas per MORTH No.2706 |
| 158 | Road FurnitureRoad Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface.Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35- 2015. The finished surface to be level, uniform and free from streaks and holes etc., complete as per MoRT&H specification No.803 |
| 159 | Providing and Fixing reflective road Stud of category A raised pavement markers made out of poly corbonate / methyl methecrylate/ ABS moulded body confirming to ASTM D788 and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face with rectro-reflectance and chromaticaly values conforminmg to ASTM D4280. The reflective raised pavement markers shall also confirm to the MORTH circular No RW/NH 33023/10/97-DO III dt 11.06.97 and the length height and width of the body shall not be less than 100mm 15mm and 90mm and with minimum reflective area of 13Sq.Cm on each side and the slope to the base shall be 35+/-5 degree. Each reflector shall have a CIL not less than values specified in Table II of said MORTH Circular. The strength of detachment of the integrated cyliderical shanks , (of Dia metre not less than 19+/- 2mm and height not less than 30+/- 2mm) from the body is to be a minimum value of 500Kgf. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacture recommendation and the complete as dircted by the Engineer. The Markers will support a load of 13635 Kg tested in accordence with the ASTM D4280 and confirming to IRC 35 - 2015 guidelinesand MORTHSpecification 804 etc. complete. For Road Markers/ Road Stud with Lense Reflector. |
| 160 | Providing and erecting of Retro - Reflectorised Cautionary, Mandatory and Informatory signs (without definition board) made out of High Intensity Prismatic Grade Sheeting confirming to Type-IV standards of IRC-67: 2022 and ASTM D 4956 –09, specification and fixed over 2mm thick Aluminium sheet fixed over a back supporting frame of 25mm x 25mmx3mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm with a clear height of not less than 2.10m from the ground level to the bottom of the sign board and 0.60m below ground level. The sign post should be painted as per IRC 67-2022 and firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cmX45cmX60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer-in-charge. High intensity Retro - Reflectro sheet shall consist of minimum coefficient of Retro-reflection as per Table 6.6 of IRC 67-2022. The retro - reflective sheeting shall be covered under 7 year warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67:2022.(as per MoRT&H Specification No.801 Rectangular Board 60 X 45 cm |
| 161 | 90cm equilateral triangle |
| 162 | 60 cm Circular |
| 163 | Providing and Erecting of Retro - Reflectorised Hazard Marker Traffic Sign made out of High Intensity Prismatic Grade Sheeting confirming to Type-IV standards of IRC-67: 2022 and ASTM D 4956 –09, specification and fixed over 2mm thick Aluminium sheetfixed over a back supporting frame of 25mmx25mmx3mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm and 0.60m below ground level. The sign post should be painted as per IRC 67-2022 and firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cmX45cmX60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer-in-charge. High intensity Retro - Reflectro sheet shall consist of minimum coefficient of Retro-reflection as per Table 6.6 of IRC 67-2022. The retro- reflective sheeting shall be covered under 7 year warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67:2022. (as per MoRT&H Specification No.801) 30cm x 90cm rectangular |
| 164 | Providing and erecting of Direction and Place Identification Retro-reflectorised Sign made out ofHigh Intensity Prismatic Grade Sheeting confirming toType-IV standards of IRC-67: 2022 and ASTM D 4956–09, specification and fixed over 2mm thick Aluminiumsheet fixed over a back supporting frame of 25mmx25mm x3mm Mild Steel angle and supported ona mild steel angle post 75X75X6mm with a clear heightof not less than 2.10m from the ground level to thebottom of the sign board and 0.60m below groundlevel. The sign post should be painted as per IRC 67-2022and firmly fixed to the ground by means of properlydesigned foundation with M15 grade cement concrete45cmX45cmX60cm size including cost and conveyance ofall materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactorycompletion of the work as directed by the engineer- incharge.High intensity Retro Reflectro sheet shall consistof minimum coefficient of Retro-reflection as per Table6.6 of IRC 67-2022. The retro- reflective sheeting shallbe covered under 7 year warranty issued for fieldperformance and a certified copy of three yearsoutdoor exposure report shall be obtained as per IRC.(for sign having area more than 0.9 sqm) (Type-IV) |
| 165 | Providing and fixing Solar powered Traffic Blinkers of 30cm dia with Polycarbonate Dome 5mm Red of Led 150 Nos.iri each Red Blinkers Light - 1 No. with Red / White /Blue Led Blinkers Delineator Solar Panel : 12v 50w SolarPanel — 1 No. 12v 18 AH Battery -1 No. with Box,Solar Circuit Controller Board Box. Straight Pole : MS Pole 3” dia 2.5mm thick 18 Feet height pole (1 No.)with 2 Feet under ground pole foundation, pole paintingincluding transportation charges, installation charges etc., complete as per standard specification. |
| 166 | Supplying and installation of delineators (road way indicators, hazard markers and object markers), 80-100 cm high above ground level, painted at alternatively black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79 etc., complete (as per MoRT&H specification No. 806) |
| 167 | Base Cost Estimate |
| 168 | GST18% |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |