| 1 | Maintenance of TROLLEY GATE at ASTE Qty -04 including checking and testingon monthly basis all the parts ie rollers , rail , motors for driving the rollers from Engineer from reputed company ,and removing the unserviceable parts of the gate and replacing / repairing the sameand submitting the report to GE offfice on monthly basis all as spd and directed by Engineer in charge. Note: Unserviceable parts will be paid separately under below items |
| 2 | Supply onlyrail wheels . Make as per existing |
| 3 | Supply onlyrail of existing size including weldingand making good as per existing complete all as directedby EIC |
| 4 | M& L for rewinding of motor 5 HP including transportation to work shop and taking it back to site and testing and commissionimg complete all as spd and directed |
| 5 | Spray painting of trolley gate alongwith motor, cover,panelof any typeall as per cplour shade of MES specification after cleaning the dust particle complete all as specifed and directed by EIC |
| 6 | Comprehensive operation and maintenance of Solar Power Plant 60 KW Routine maintenance, performnance monitoring and reporting 24/7, corrective maintenance and other services like basic maintenance, compliance with all safety regulations and standards complete all as directed by EIC |
| 7 | Note: following services shall be include in operation and maintenanceRoutine Inspection and maintenance:1.Visual inspections of solar panels, mounting structure and electrical components2. Cleaning of solar planels to ensure maximum efficiency- max 11 cycles in the period of 11 months3. Inspection of wiring, cables and connectors for wear and tear or any damage.4. Maintenanceof inverters,ACDB,DCDB Box ,and other critical equipment.5. Checking and servicing of monitoring systems to ensure accurate performance data.6.Cleaning of area (with in the boundry of solar modules area in the plant and ensureing No shadow effect on module due to tress) |
| 8 | Performance Monitoring and reporting:1. 24/7 real-time monitoring of plant performance with help of SCADA2. Monthly performance analysis and efficiency optimization.3. Preparation of detailed monthly and annual reports on energy productionequipment status, and any incidents-will make SoP at the time of agreement |
| 9 | Corrective maintenance1. Troubleshooting and rectification of any faults or performance issues.2. Replacement of damaged or malfunctioning components (Note: Spare parts shall be measured and paid separately)3. Emergency response services for major breakdowns with the help of guidelines of OEM of the equipments. |
| 10 | Taking Old unsv , Supply and installation Solar Module panel of exisiting wattage MNRE approved,alongwith miscellaneous components like termination kits, lugs, comprising of existingtechnical specificationcomplete all as specified and as directed by Engineer in charge. |
| 11 | Taking Old Supply MC4 Connector complete all asa pecified and as directed by EIC |
| 12 | Taking down old UNSV inverter& Supply fixing testing and commissioning of Solar grid type inverter for 60 KWalongwithalong with ACDB & DCDB 6 in 6 out box complete all as specified and as directed.Make : Waree/Onewave/TataBP/Luminous |
| 13 | Taking Old UNSV ,Supply and erection of roofmounting structure made of hot dip galvanised steel with minimum thickness of 120 microns of aluminium alloy and suitable for SPV module specified and here in after ,including bolts,nuts ,fasteners,panel mounting clamps,/aluminium alloy mounting arrangement suitable with M15 PCC (1:2:4)type B1 using 20 mm graded stone aggregate as per MNRE standards , completeall as specified and as directed by EIC |
| 14 | Taking Old Supply, laying, testing XLPE insulated screened, PVC innersheathed galvanised steel strip or wire, armoured, heavy duty LT UG electric cable with aluminium conductor, 1100 volts grade, cross-sectional area 185 Sq.mm, 3½ core including taking down existing cablecomplete all as specified. NOTE: Excavation & Earthwork, Sand Cushioning & Cable protection shall be measured & paid seperately |
| 15 | Taking Old ,Supply, laying, testing XLPE insulated screened, PVC innersheathed galvanised steel strip or wire, armoured, heavy duty LT UG electric cable with aluminium conductor, 1100 volts grade, cross-sectional area 120Sq.mm, 3½ core including taking down existing cablecomplete all as specified. NOTE: Excavation & Earthwork, Sand Cushioning & Cable protection shall be measured & paid seperately |
| 16 | Taking Old Supply, laying, testing XLPE insulated screened, PVC innersheathed galvanised steel strip or wire, armoured, heavy duty LT UG electric cable with aluminium conductor, 1100 volts grade, cross-sectional area 70 Sq.mm, 3½ core including taking down existing cablecomplete all as specified. NOTE: Excavation & Earthwork, Sand Cushioning & Cable protection shall be measured & paid seperately |
| 17 | Taking Old Supply ,fix,testing and commissioning of 1C X 16 Sq.mm UG cable complete all as specified and as directed by EIC |
| 18 | Material and labour for maintenance free earth consisting of one earth pits using copper -bonded steel rods, compression couplers earth enanching compound and exothermic welding for connectingpit electrodes to strip . Each earth pit consists of 17.2mm copper bonded steel ectrodes 10ft long -01 Nos, Earth enhancing compound of 10 kg bag -5 Nos, 25mm x 2mm copper strip -7.5 mts , including inspection chamber of size 30cmx30cm Lightening arrester with necessary arrangement alongwith suitable EMC electrode complete all as specified and directed by Eng - in- Charge. Note :(1) On testing after completion of Job , if desired earth resistence (Less than1 Ohm )is not obtained , the earthing shall be redone by the contractor without any cost to Govt. (2) The chemical earthing will be done by the manufacturer or its authorised representative on the site. |
| 19 | Taking Old ,Supply install testing and commissioning of 2\" UPVC pipes complete all as specified and asd Directed .Note : All fittings like T Bend,L bend,Coupler,End Cap etc complete all as specified and as directed . |
| 20 | Taking Old Supply install testing and commissioning of 1\" UPVC pipes complete all as specified and asd directed .Note : All fittings like T Bend,L bend,Coupler,End Cap etc complete all as specified and as directed . |
| 21 | Supply installation of Stickers - Sign Boards for All Solar Equipments complete all as specified and as diirected |
| 22 | Taking Old ,Supply install testing and commissioning of FRPwalkway (350 mm widh x 25 mm thickness) if required some concreting work complte all as specified and as directed . |
| 23 | Taking Old ,Supply fixing testing & commissioning of Ladder cable tray of aluminium of size 120 x50x1.2 mm complete all as specified and as directed |
| 24 | Supply ABC type fire extinguisher of capacity 6 kg complete all as specified and as directed |
| 25 | Taking down Old UNSV,Supply pressure pump of motor power 2000W ,water flow rate 600 L/H portable type ,maximum pressure 130 bar ,of hose length 8 mtr complete all as specified and as directed by EIC |
| 26 | Comprehensive maintenance and servicing on once in two months basis of boom barriers of span 5.5 metre installed at VISHWA VIHAR,electrically operated, lifting type, of make: M/S NIKASH including repairs and servicing of electrical motor, fly wheel,pinions, clutch plates, limit switch, control cables, switch gears and replacement of oil etc, complete for smooth functioning all as specified and as directedby Engr-in-Charge. |
| 27 | Comprehensive maintenance and servicing on once in two months basisof boom barriers of span 7.2 metre installed at ASTE,electrically operated, lifting type, of make: M/S NIKASH including repairs and servicing of electrical motor, fly wheel,pinions, clutch plates, limit switch, control cables, switch gears and replacement of oil etc, complete for smooth functioning all as specified and as directedby Engr-in-Charge. |
| 28 | Comprehensive maintenance and servicing on once in two months basis of boom barriers of span 5.5 metre installed at IAM,electrically operated, lifting type, of make: M/S NIKASH including repairs and servicing of electrical motor, fly wheel,pinions, clutch plates, limit switch, control cables, switch gears and replacement of oil etc, complete for smooth functioning all as specified and as directedby Engr-in-Charge. |
| 29 | Comprehensive maintenance and servicing of boom barriers of span 5.5 metre installed at 26ED,electrically operated, lifting type, of make: M/S NIKASH including repairs and servicing of electrical motor, fly wheel,pinions, clutch plates, limit switch, control cables, switch gears and replacement of oil etc, complete for smooth functioning all as specified and as directedby Engr-in-Charge. |
| 30 | Disconnection ,Supply and Fix Electronic Controller for suitable boom Barrier /Sliding gate complete all as specified and as directed by EIC |
| 31 | Disconnection ,Supply and Fixgate barrier of of boom of existing span of length complete all as specified and as directed . |
| 32 | Disconnection , Supply and Fix Wheels suitable for Sliding gate installed at 26 ED/ complete all as specified and as directed . |
| 33 | M/L for providing earthing with GI earth plate electrode 600 x 600 x 6.3 mm thick burried directly in ground vertically to depth of not less than 2.25 mtr deep below normal ground level with top edge of the plate not less than 1.5 mtr below ground level connected to GI earth strip of 25x4mm by means of bolts, nuts, washers of GI and provision of earth lead, GI protection pipe with 15mm light grade galvanized including necessary earth work in any type of soil, PCC 1:3:6type CI (using 20mm graded stone aggregate) earth chamber and 1:2:4 type B1 RCC cover fitted with50mm thick with 6mm dia MS bars complete all as shown in SSR Pt - 1 electrical plate No 3. Note : Quoted rate deemed to include the cost or excavation and earth work PCC Chamber, funnel cover etc. |
| 34 | Supply, laying, testing XLPE insulated screened, PVC innersheathed galvanised steel strip or wire, armoured, heavy duty LT UG electric cable with aluminium conductor, 1100 volts grade, cross-sectional area 16 Sq.mm, 4 core including taking down existing cablecomplete all as specified. NOTE: Excavation & Earthwork, Sand Cushioning & Cable protection shall be measured & paid seperately |
| 35 | Supply, laying, testing XLPE insulated screened, PVC innersheathed galvanised steel strip or wire, armoured, heavy duty LT UG electric cable with aluminium conductor, 1100 volts grade, cross-sectional area 10 Sq.mm, 4 core including taking down existing cablecomplete all as specified. NOTE: Excavation & Earthwork, Sand Cushioning & Cable protection shall be measured & paid seperately |
| 36 | Excavating in trenches, not exceeding 1.5 m wide and not exceeding 1.5 m in depth, not exceeding 10 sq m on plan and getting out inhard/dense soil complete all as specified. |
| 37 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25 cm thick with soils. |
| 38 | Removal of surplus soil to a distance not exceeding 50 m and deposited where directed at a level notexceeding 1.5 mabove the starting point complete all as specified. |
| 39 | S&F 50 mm bore GI tubing light grade including necessary fittings such as bend, tee, elbow etc complete in trenches/ on wall complete all as specified. |
| 40 | Supply and laying unreinforced pre cast concrete cable cover class LV type I flat size 250 x 150 x 40 mm for cable protection |
| 41 | Supply and spreading M-Sand in trenches for cushioning of under ground cable all as directed by Engr-in-Charge at site Note:- Only punned thickness 18 cm will be measured and paid . |
| 42 | Taking Old Supply, installation and testing commissioning three phase gear motor 415 voltof cap 2 HP high speed motor (motor should be fitted to master leaf) with suitable heavy grade speed reduction gear attachments for the movement of main leaf along with subsequent movement of slave leaf - 05 Nos with slave arrangement mechanism including suitable declutching facility for manual operation, the speed of door movement shall be as per international standard i.e. 7 to 8 mtr per minute for Hangar doors including removal of existing motor and handing over to MES complete all as specified and directed. |
| 43 | Taking Old Supply, installation and testing of VFD for controller complete all as specified and directed. |
| 44 | Dismantling of existing wheel assembly complete by protecting entire door without any damages and replace with heavy duty wheel made out of MS embedded with ball bearing complete all as specified.(HN10,HN11) |
| 45 | Taking Old Supply, installation and testing of control panel indoor type for operation of suitable starters locally and remote control alongwith indication lamps and multifunction meter, push buttons and single phase preventer complete all as specified and directed. |
| 46 | Taking Old Supply, installation and testing of 4 core 2.5 sqmm sheathed copper cable alongwith guide wire and rails complete all as specified and directed. |
| 47 | Taking Old Supply, installation and testing of limit switch heavy duty complete all as specified and directed. |
| 48 | Maintenance and servicing of Slidinggateelectrically operated including repairs and servicing of electrical motor, fly wheel, pinions, clutch plates, limit switch, control cables, switch gears and replacement of oil etc., installed at 26 ED(AF) complete for smooth functioningall as specified and as directedby Engr-in-Charge.Note : All the minor parts like flywhell pinions,clutch plate,limit switch ,control cables if required need to be change inclusive in the above rate quoted. |
| 49 | Disconnection , Supply and Fix Wheels suitable for Sliding gate installed at 26 EDcomplete all as specified and as directed . |
| 50 | Taking down ,Supply,Fixing,Testing & Commissioning Smart ,Solar LED street light (All in One)(24 W)with following specifications Battery Lithium ion of capacity 28.6AH 11.1 V,Autonomy 42 Hrs ,LED 48 ,pole height 8 mtrs ,solar charging time 5-6 hrs ,Lighting time 24 hrs ,Body fibre reinforced plastic,Protection IP 65,Sensor PIR motion ,Work temperature -10 degree celsuis to +55 degree celsius ,Light Source W-LED ,Cplour temperature 5500-6500 K,Light Output 180 lm/watt ,Duty cycle dusk to dawn,PV Module (Wp)under STC 55 Wp,PV module chemistry -monocrystalline ,PV module efficiency 17 %, etc complete all as specified an as directed by EIC |
| 51 | Taking down Old Supply testing and commissioning of CS 250 Energizer with hooter complete all as specified and as directed |
| 52 | Taking down Old Supply testing and commissioning of Fence lite complete all as specified and as directed |
| 53 | Taking down Old Supply testing and commissioning of 12V 65AH Batterycomplete all as specified and as directed |
| 54 | Taking down Old Supply testing and commissioning of charge controller complete all as specified and as directed |
| 55 | Taking down Old Supply intermediate post Kwitah/T angular 5 feetlength with square post duly galvaniized complete all as specified and as directed |
| 56 | Taking down Old Supply end corner post 40 mm SQ galvanised post of 5 feet length complete all as specified and as directed |
| 57 | Taking down Old Supply support post of 25 mm dia galvanised post of 5 feet lengthcomplete all as specified and as directed |
| 58 | Taking down Old Supply fixing of breakway insulatorscomplete all as specified and as directed |
| 59 | Taking down Old Supply fixing of endstrain insulatorscomplete all as specified and as directed |
| 60 | Taking down Old Supply fixing of S Hookcomplete all as specified and as directed |
| 61 | Taking down Old Supply fixing of joint Clampscomplete all as specified and as directed |
| 62 | Taking down Old Supply fixing of flat wire tightenercomplete all as specified and as directed |
| 63 | Taking down Old Supply testing and commissioning of HT wire 2.59 mm -12 Gcomplete all as specified and as directed |
| 64 | Taking down Old Supply double insulated cable 2.5 sqmmall as specified and as directed |
| 65 | Taking down Old Supply warning sign boardall as specified and as directed |
| 66 | Taking down Old Supply Earthing kitall as specified and as directed |
| 67 | Taking down Old Supply lightning diverter kit all as specified and as directed |