| 1 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For embankment / sub grade Box Cutting for widening portion |
| 2 | Construction of Granular Sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 & IRC 37-2018 - for Grading-V Material. |
| 3 | Construction of Granular Sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 & IRC 37-2018 - for Grading-III Material |
| 4 | Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 |
| 5 | Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5. |
| 6 | Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 502 of MoRTH Rev-V. |
| 7 | Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 |
| 8 | Providing and laying Tack Coat over Existing Concretesurface using 3Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 |
| 9 | Providing, laying consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50- 13.20mm, 0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20- 30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm using paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory rollers and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 - Grade I (80mm Thick) - Widening Portion Only |
| 10 | Providing, laying consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50- 13.20mm, 0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20- 30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm using paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory rollers and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 - Grade II (50mm Thick) - Strengthening Portion Only |
| 11 | Providing and laying Bituminous Concrete using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratoryroller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 - Grade-II (30/40 mm Thick) - Widening & Strengthening Portion |
| 12 | Providing and laying Bituminous Concrete using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG 30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratoryroller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 - Grade-I 50mm Thick (Over Box Culvert Portion - Concrete Surface) |
| 13 | Providing compaction for embankment / making up of low berms using the available box cut earth including all hire and fuel charges for power roller for compaction, water sprinkler, including all labour charges for laying, spreading, watering etc., complete and as directed by the departmental engineers. |
| 14 | Construction of Single cell BoxCulvert at Km 0/4Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bankwith all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion, backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for Foundation for Box Culvert and Wing wall. |
| 15 | Plain Cement Concrete of grade M15 (Nominal mix) using 40mm ISS hard broken granite metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for LEVELLING COURSE BELOW of Box Culvert and Wing wall. |
| 16 | Vibrated Reinforced cement concrete of grade M25 (Design mix) using 20mm ISS hard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Box culvert. |
| 17 | Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges forlaying,compacting, curing all incidental charges etc., complete for Wing wall and Parapet |
| 18 | Supply and fabrication of STEEL grade Fe500 withsuitable anticorrsive measure required for all the reinforced cement concrete items of work involved in the shedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete |
| 19 | Construction of Single cell BoxCulvert at Km 8/2Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bankwith all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion, backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for Foundation for Box Culvert and Wing wall. |
| 20 | Plain Cement Concrete of grade M15 (Nominal mix) using 40mm ISS hard broken granite metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for LEVELLING COURSE BELOW of Box Culvert and Wing wall. |
| 21 | Vibrated Reinforced cement concrete of grade M25 (Design mix) using 20mm ISS hard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Box culvert. |
| 22 | Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges forlaying,compacting, curing all incidental charges etc., complete for Wing wall and Parapet |
| 23 | Supply and fabrication of steel Grade Fe-500 D required for all RCC items of works involved in the schedule including cost of steel cost of fabrication labour charges for cleaning the rods straightening cutting bending tying grills hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc. complete as per standard specification |
| 24 | PCC Retaining wall at Km 6/2Earthwork excavation in all classes of soils except hard rock requring blasting depositing on bank with all leads and lifts as per SS 20B including cost of all labour,materials, tools, equipments and all incidential charges such as bailing out water providing and maintaining necessary conferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and cleaning the site and disposal of all surplus materials etc complete as per relevant standard specifiation for FOUNDATION OF RETAINING WALL |
| 25 | Cement concrete of grade M10 (nominal mix 1:3:6) 40mm HBG metal including cost and conveyance of all materials to site and cement at site including cost of form work, and centering ,labour charges for mixing, transpoting, including hire and fuel charges for all tools and plants engaged finishing and curing,tools and plants and other incidental charges such as bailing out water wherever necessary forming protective bunds, coffer dams etc complete for levelling course as per MORTH & H specification Cl.1000, 1500, 1700 & 2908. |
| 26 | Vibrated cement concrete of grade M20 (nominal mix 1:1.5:3) 40mm HBG metal including cost and conveyance of all materials to site and cement at site including cost of form work, and centering ,labour charges for mixing, transpoting, including hire and fuel charges for all tools and plants engaged finishing and curing,tools and plants and other incidental charges such as bailing out water wherever necessary forming protective bunds, coffer dams etc complete for foundation & body wall below sill level as per MORTH & H specification Cl.1000, 1500, 1700 & 2908. |
| 27 | Vibrated cement concrete of grade M20 (nominal mix 1:1.5:3) 40mm HBG metal including cost and conveyance of all materialsto site and cement at site including cost of form work, softwork, labour charges for mixing , transporting , laying and curing concrete working at depths,tools and plants and incidental charges such as maintaining of protective bunds,coffer dams shoring,strutting etc complete as per relevent standard specification for substructure above sill level. |
| 28 | Providing and fixing SEEPAGE PIPES of 100mm dia PVC pipes of required length for Retaining Walls including cost and conveyance of all materials to worksite,cost and labour for 900mm dia.Semi-spherical back fill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing etc., to drain of the Backfill in the Retaining Wall |
| 29 | Providing and fixing Bituminous pad expansion joint 20mm thick including cost and conveyance of the same to work site labour charges for fixing in correct position and all labour charges etc.complete |
| 30 | Refilling behind Retaining wall with approved materials obtained from borrow pits with all leads and lifts, transporting to site spreading grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000m as per Technical specification clause 303.1 and as per directed by Engineer in charge |
| 31 | Road FurnitureRoad Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface.Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35- 2015. The finished surface to be level, uniform and free from streaks and holes etc., complete as per MoRT&H specification No.803 |
| 32 | Providing and fixing reflective road studs of ‘category A’ Raised pavement markers made out of poly carbonate / methyl methercrylate/ABS moulded body confirming to ASTM D 788 and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face with retro reflectance and chromaticity values conforming to ASTM D4280. The reflective raised pavement markers shall also confirm to the MoRT&H circular No RW / NH. 33023/10/ 97-DO. III dt 11.06.97. The height, width and length shall not be less than 15 mm, 90 mm and 100 mm and with minimum reflective area of 13 Sq.cm on each side and the slope to the base shall be 35 (+/-) 5 degree. Each reflector shall have a CIL not less than values specified in Table 2 of said MoRT&H circular. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 (+/-) 2mm and height not less than 30 (+/-) 2 mm) from the body is to be a minimum value of 500 Kgf. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the Engineer. The marker shall support a load of 13635 Kg tested in accordance with ASTM D4280 and confirming to IRC 35 - 2015 guidelines and MoRT&H specification 804 etc., complete |
| 33 | Providing and Erecting of Retro - Reflectorised Hazard Marker Traffic Sign made out of High Intensity Prismatic Grade Sheeting confirming to Type-IV standards of IRC-67: 2022 and ASTM D 4956 –09, specification and fixed over 2mm thick Aluminium sheetfixed over a back supporting frame of 25mmx25mmx3mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm and 0.60m below ground level. The sign post should be painted as per IRC 67-2022 and firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cmX45cmX60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer-in-charge. High intensity Retro - Reflectro sheet shall consist of minimum coefficient of Retro-reflection as per Table 6.6 of IRC 67-2022. The retro- reflective sheeting shall be covered under 7 year warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67:2022. (as per MoRT&H Specification No.801) 30cm x 90cm rectangular |
| 34 | Providing and erecting of Retro - Reflectorised Cautionary, Mandatory and Informatory signs (without definition board) made out of High Intensity Prismatic Grade Sheeting confirming to Type-IV standards of IRC-67: 2022 and ASTM D 4956 –09, specification and fixed over 2mm thick Aluminium sheet fixed over a back supporting frame of 25mm x 25mmx3mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm with a clear height of not less than 2.10m from the ground level to the bottom of the sign board and 0.60m below ground level. The sign post should be painted as per IRC 67-2022 and firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cmX45cmX60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer-in-charge. High intensity Retro - Reflectro sheet shall consist of minimum coefficient of Retro-reflection as per Table 6.6 of IRC 67-2022. The retro - reflective sheeting shall be covered under 7 year warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67:2022.(as per MoRT&H Specification No.801)90cm equilateral Triangle |
| 35 | 60cmX 45Cm Rectangular |
| 36 | 60cm Circular |
| 37 | 90Cm Octagon |
| 38 | Providing and erecting of Direction and Place Identification Retro-reflectorised Sign made out of High Intensity Prismatic Grade Sheeting confirming to Type-IV standards of IRC-67: 2022 and ASTM D 4956 –09, specification and fixed over 2mm thick Aluminium sheet fixed over a back supporting frame of 25mmx25mmx3mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm with a clear height of not less than 2.10m from the ground level to the bottom of the sign board and 0.60m below ground level. The sign post should be painted as per IRC 67-2022 and firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cmX45cmX60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer- in- charge. High intensity Retro Reflectro sheet shall consist of minimum coefficient of Retro-reflection as per Table 6.6 of IRC 67-2022. The retro- reflective sheeting shall be covered under 7 year warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC67:2022. (as per MoRT&H Specification No.801) (for sign having area more than 0.9 sqm) (Type-IV) |
| 39 | Supplying and installation of delineators (road way indicators, hazard markers and object markers), 80-100 cm high above ground level, painted at alternatively black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79 etc., complete (as per MoRT&H specification No. 806) |
| 40 | Proving and fixing Solar powered Traffic Blinkers of 30cm dia with Polycarbonate Dome 5mm Red of Led 150 Nos. iri each Red Blinkers Light - 1 No. with Red / White / Blue Led Blinkers Delineator Solar Panel : 12v 50w Solar Panel — 1 No. 12v 18 AH Battery -1 No. with Box, Solar Circuit Controller Board Box. Straight Pole : MS Pole 3” dia 2.5mm thick 18 Feet height pole (1 No.) with 2 Feet under ground pole foundation, pole painting including transportation charges, installation charges etc., complete as per standard specification |
| 41 | Base Cost Estimate |
| 42 | GST18% |