| 1 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/ structure &back filling |
| 2 | Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & back filling. |
| 3 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11KV DP incl. conveyance of materials. |
| 4 | Transporting poles by hired vehicle to a distance up to 5km and carrying up to 4 poles excluding loading & unloading |
| 5 | Dismantling one channel cross arm from existing DP structure and bringing back to section store |
| 6 | Dismantling one ordinary street light /CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting |
| 7 | Transporting poles by hired vehicle to a distance beyond 5km and carrying up to 4 poles (Running km) |
| 8 | Fitting one Additional 75x40mm, 1.8m channel cross arm in existing single pole incl. conveyance of materials |
| 9 | Fitting one Additional V cross arm in existing single pole incl. conveyance of materials |
| 10 | Loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 11 | Fitting and erecting one HT A type pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads |
| 12 | Fitting and erecting one HT PSC type pole in position incl. fitting cross arm, digging & back filling pit,drawing earth leads |
| 13 | Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 14 | Fitting and providing one HT stay for 11KV pole incl. digging and back filling pit |
| 15 | Stringing of one km 3PH 11kV line with XLPE Insulated ACSR Racoon |
| 16 | Fitting one set AB switch and giving connection |
| 17 | Drilling hole of various sizes on existing Channel/Cross arm |
| 18 | Additional rate for excavation of Pit for A type pole in Laterite |
| 19 | Providing/inserting 2 line spacer on the existing LT OH line |
| 20 | Providing/inserting 3 line spacer on the existing LT OH line |
| 21 | Providing bridging at cut points for 3 PH 11 kV line with XLPE insulated ACSR Racoon |
| 22 | Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion |
| 23 | Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion |
| 24 | Additional rate for excavation of one pit for HT poleHT stay in Hard Laterite |
| 25 | Dismantling without damage LT stay incl digging pits in all classes of soil and backfilling |
| 26 | Loading LT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 27 | Additional rate for refitting/redoing one Shackle set and reshackling one span while renewing any type of pole |
| 28 | Fitting and erecting one HT DP using A type pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads |
| 29 | Additional rate for providing one disc set on any type of HT pole for making cut point |
| 30 | Additional rate for refitting/redoing one disc set and while renewing any type of 11 kV cut pole |
| 31 | Fitting one additional HT pin with insulator |
| 32 | Dismantling ( without damage) one LT PSC/RCC pole after disconnecting stays, strut, etc. and stacking the same |
| 33 | Dismantling (without damage) one 11 kV PSC/RCC pole after disconnecting stays,strut etc and stacking the same |
| 34 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays,strut etc and stacking the same |
| 35 | Fitting one no section fuse on LT line with dropping cables,crimping sockets connecting with bolt & nut etc |
| 36 | Pole numbering using printed Aluminium sheets/Painting the surface of pole with anti algal yellow paint and painting Letters with black paint as specified incl cost of paint |
| 37 | Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all materials(as per specification) |
| 38 | Fitting one set (3 Nos)11 kV LA and giving connection |
| 39 | Providing fly stay for LT pole using LT PSC pole incl digging & backfilling pit |
| 40 | Providing strut for LT pole using LT PSC pole incl digging & backfilling pit |
| 41 | Fitting one LT 2 line cross arm on HT or LT existing poles incl fitting insulators and binding the same with LT line |
| 42 | Fitting one LT 4 line cross arm on HT or LT existing poles incl fitting insulators and binding the same with LT line |
| 43 | Fitting one additional F top bracket |
| 44 | Cutting trees beyond 30 cm but upto and incl 60 cm girth cutting of trunks,branches,removing the root completely and stacking |
| 45 | Cutting trees beyond 60 cm but upto and incl 120 cm girth cutting of trunks,branches,removing the root completely and stacking |
| 46 | Conveyance of one km 11 kV line materials from section store/stacking placeto the work site (excluding poles) |
| 47 | Traffic signal painting of pole 1.5m height using black and white paints in alternate rings of 25 cm width incl cost of paint as specified |
| 48 | Transferring LT 3 ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole |
| 49 | Transferring LT 3 ph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole |
| 50 | Additional rate for excavation of one Pit for HT pole/ HT stay in laterite Please Enable Macros to View BoQ information |