| 1 | Earthwork Excavation in all Sorts of Soil for foundation trenches, walls, drains, plinths, footings, pedestals, columns and for all other miscellaneous foundation works etc., including Cutting / removing & clearance of jungle, bushes, grass & creepers etc. Shoring, strutting, bailing out water [if necessary], dressing, leveling & hand ramming the bottom of foundation base using wooden hand rammer with proper watering, refilling the sides of the foundation with excavated available good quality of Soil, leveling & hand ramming the sides of foundation base using wooden hand rammer with proper watering, providing; fixing & removing necessary staging / platform / ladder, collecting & disposing the waste soil or surplus soil, generated waste up to a lead of 2 to 3 kms. from the place of work & cleaning the work area,etc. complete all as per standard technical specification, drawing [if any] and as directed by engineer-in-charge at all locations and at all lift / height. |
| 2 | Providing and laying 150 mm thick Stone Solingbelow floor & foundations bed etc. using hard, durable & approved quality stones, rubbles, filling interstices using small size stones, stone chips, murum & watering [to fill up all gaps] etc. including preparation of base properly, levelling, dressing & hand ramming, providing; fixing & removing necessary staging / platform / scaffolding, collecting & disposing the generated waste, costruction waste up to a lead of 2000 to 3000 metersfrom the place of work & cleaning the work area,etc. complete all as per standard technical specification, drawing and as directed by engineer-in-charge at all locations and at all lift & height. |
| 3 | Providing and laying RCC, 1:1.5:3, using 20 mm & downsize, clean, crushed, well graded of hard, durable and approved quality for RCC works including mixing [volumetric / as directed by engineer-in-charge] including preparation of base by closed hacking / chipping the concrete / plastered surfaces; racking out the adjoining masonry joints and cleaning, machine mixing, transporting, laying, spreading, consolidation, leveling, finishing, curing, providing; fixingremoving staging / platform, collecting and disposing the generated waste upto a lead of 3000 meters from the place of work & cleaning the work area etc., complete all as per standard technical specification and as directed by the engineer-in-charge at all locations and at all lifts & heights. Note: OPC 43 grade Cement of reputed brand & brand as selected by EIC shall be used. |
| 4 | Providing, placing and removing formwork for all in-situ concrete works including providing, fixing & removing centering, shuttering, supports, brackets, clips, preparation of surface etc, providing, fixing removing staging / platform, collecting and disposing the generated waste upto a lead of 3000 meters from the place of work & cleaning the work area etc., complete all as per standard technical specification and as directed by the engineer-in-charge at all locations and at all lifts & heights. |
| 5 | Providing and laying reputed make [make as selected by engineer-in-charge] high yeild strength deformed Reinforcement Bars of all diameters confirming to grade D-550 of IS:1786 [latest edition] including preparation of base, cutting, bending, transporting, placing in position & providing & tying using binding wire of suitable guage [soft annealed binding wire] for all in situ concrete works and all othermiscellaneous RCC works, providing & placing spacer bars, cover blocks [cover blocks shall be cast in same grade of concrete& cured properly] ,providing, fixing removing staging / platform, collecting and disposing the generated waste upto a lead of 3000 meters from the place of work & cleaning the work area etc., complete all as per standard & manufacturers technical specification and as directed by the engineer-in-charge at all locations and at all lifts & heights. |
| 6 | Providing , fabricating and erecting Mild Steel Structural items of various thickness & sizes such as channels, angles, I sections, MS pipes, GI Pipes; flats, plates, MS & Reinf. rods, and other approved sections etc. & transporting to the workplace, including loading, unloading, cutting, fabricating the MS gates,MS grills, ladders, hand rails, angle frames, panels, struts, tubular space frames, columns, beams, purlins, rafters, fencing posts, EP Plates, EP Flats & all other required miscellaneous structural steel works and fixing/ erecting the same in position as directed. including providing & fixing wherever required suitable anchor Fasteners, of approved quality, providing, fixing and removing necessary scaffolding, staging, platform wherever required , surface preparation , providing & painting One coat of approved Primer and two coatssynthetic enamel paintof approved make , shade / colour.disposing the debris up to a lead of 2 to 3 kmout side the periphery of the work premises etc., complete all as per specification,and as directed by the Engineer -in-charge at alllifts / heights &at all locations. |
| 7 | Providing and laying / fixingPlain or Curved Galvalum Sheets for Roofing, c.[ 0.45 to 0 .47 mm thick] of Colour Mat Finish Coating: AZ - 150 / 550 MPA, Paint : RMP [Regular Modified Polyester], Top Coat: 18 - 20 Micron, Bottom Coat: 5 - 7Micron, Trapezoidal Profile 0.47 mm thick at pitch 250 mm., Width 1060 mm, Length as per site measurement, Aluminium - Zinc Steel Sheet [Galvalume Base] 55 % aluminium, 43 % Zinc, 1.60 % Silicon with Tensile strength of 345 to 550 MPA including providing & fixing necessary self drilling screws of best quality & EPDM washers, Galvalum sheets Roofingshall be of approved shade / colour & confirming to the relavent BIS specification of the latest edition and of approved make, preparation of base, providing; fixing & removing Staging / platform / ladder, collecting & disposing the generated waste up to a lead of 2 to 3 kms. from the place of work & cleaning the work area,etc. complete all as per standard & manufacturers technical specification, drawing [if any] and as directed by engineer-in-charge at all locations and at all lift / height. |
| 8 | Providing fixing double scaffolding system ( cuplock type ) on the interior side , up to seven story height made with 40mm dia M.S tube 1.5 m C/C, horizontal and verticle tube joining with cuplock system with M.S tube , M.S tube Challies,M.S clamps and M.S staircase system in the scaffolding for working platform etc. and maintaing serviceable condition for required duration as provided and removing there after. the scaffolding system will be stiffened with bracing, runners,connection with the building etc where ever required for inspection of work at required location with essential safety featuers for workman etc. complete as per directions and approval of Enggineer-in-charge. the elevation area of the scaffolding shall be measured for payment purpose. Note : The payment will be made once irrespective of duration of scaffolding |
| 9 | Providing, fixing and frabricating stainless steel door frame, shutters and frame work for oppening [ shall be conferming with relevent BIS specification of letest edition of 304L grade ] of required size as suitable to work place with necessary frame work consist of angle 75x75x12mm , 25x25x5mm,sheet and other door fittings including labour charges, required consumable tools & tackles and ensuring smooth function providing; fixing & removing necessary staging / platform / ladder, collecting & disposing the waste soil or surplus soil, generated waste up to a lead of 2 to 3 kms. from the place of work & cleaning the work area,etc. complete all as per standard technical specification, drawing [if any] and as directed by engineer-in-charge at all locations and at all lift / height. |
| 10 | Providing and laying / fixingPlain Anodized Aluminium Sheets .[ 0.45 to 0 .47 mm thick]including providing & fixing necessary self drilling screws of best quality & EPDM washers, Plain Anodized Aluminium Sheets sheetsshall be of approved shade / colour & confirming to the relavent BIS specification of the latest edition and of approved make, preparation of base, providing; fixing & removing Staging / platform / ladder, collecting & disposing the generated waste up to a lead of 2 to 3 kms. from the place of work & cleaning the work area,etc. complete all as per standard & manufacturers technical specification, drawing [if any] and as directed by engineer-in-charge at all locations and at all lift / height. |
| 11 | Providing and fixing Aluminium Chequer Plate 5mm thick [of approved shade / colour] /Anodized Aluminium&other miscellaneous works with extruded built up standard tubularand other sections of approved make conforming to IS:733 and IS:1285, fixed with rawl plugs and screws, clips,including cleat angle, aluminium snap beading for glazing / panelling, C.P. brass / stainless steel screws, preparation of base, providing; fixing & removing necessary staging / platform, collecting & disposing the generated waste, up to a lead of 500 mtrs. from the place of work & cleaning the work area,etc. complete all as per standard technical specification, drawing, manufacturers technical specification, as per site requirement and as directed by engineer-in-charge at all locations & lifts / heights. |
| 12 | Providing and fixing Drift Eliminators made up of one full wave asbestos cement sheet blades of 146x6 mm thick assembled as panel with providing proper cover block in each pannel and other fixing works[ As directed by Engineer-in-charge ].Fixing & removing necessary staging / platform, collecting & disposing the generated waste, up to a lead of 500 mtrs. from the place of work & cleaning the work area,etc. complete all as per standard technical specification, drawing, manufacturers technical specification, as per site requirement and as directed by engineer-in-charge at all locations & lifts / heights. |
| 13 | Providing and applying1.0 mm. thick self level tough,abrasion, impact & chemical resistant , joint less, smooth, non-porous, hygienic, high build epoxy floor toppingincluding 80 to 90 micron thick one coat Epoxy primer over Existingconcrete surface including surface preprationetc.,. complete all as per standard & manufacturer technical specification and as directed by the Engineer-in-Charge at all lifts/heights & at all locations. and at active/ non-active areas. |