| 1 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 metre and lead upto 30 Mtr. Including filling watering and ramming of excavated earth into the trenches of into the space between the building and the sides of foundation trenches or into the plinth and removal & disposal of surplus earth upto 2 Km as directed by the Engineer incharge upto a distance of 30m from the foundation trenches. Excluding GST SI N 251 |
| 2 | Concrete with 4 cm gauge brick ballast fine sand of 1.25 F.M. and cement in proportion of 8:4:1 in foundations and under floors including supply of all materials, labour, tools & plants etc. required for proper completion of the work. Pwd si 281 |
| 3 | Class 150 Brick work in proportions of 1 : 6 cement and fine sand of 1.25 FM in founadtion and plinth including supply of all materials, labour, tools & plant etc required for proper completion of the work.upto plinth level pwd si 303 |
| 4 | Class 150 Brick work in proportions of 1 : 6 cement and fine sand of 1.25 FM in above plinth level upto floor two including supply of all materials, labour, tools & plant etc required for proper completion of the work.brick work in thickness of wall more than 12 cm pwd si310 |
| 5 | RCC Work rcc work with cement approved corase sand and 2cm gauge approved stone ballast in propporation 1:1.5:3 in lintels od foor and windows exculidng supply of reinforcement and its bending but including its fixing and binding and shuttering etc and also including supply of all material labour and T&P etc required for proper completion of the works strenght of the concrete shal not be less than M-20 . As in the aove item No 283 but RCC in coumn Ratio 1:1.5:3 pwd SI 283 |
| 6 | TOR Steel M.S. (tor steel or plain) in Plain work such as RCC or R.B. work including bending for proper shape and including supply of steel & its wastage bend, hooks and authorised overlapping shall be measured and including cost of binding wire. Excluding GST S.I 504 |
| 7 | Add GST@ 18% |
| 8 | Add Labour Cess @1% |
| 9 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 metre and lead upto 30 Mtr. Including filling watering and ramming of excavated earth into the trenches of into the space between the building and the sides of foundation trenches or into the plinth and removal & disposal of surplus earth upto 2 Km as directed by the Engineer incharge upto a distance of 30m from the foundation trenches. Excluding GST SI N 251 |
| 10 | Concrete with 4 cm gauge brick ballast fine sand of 1.25 F.M. and cement in proportion of 8:4:1 in foundations and under floors including supply of all materials, labour, tools & plants etc. required for proper completion of the work. Pwd si 281 |
| 11 | Dismanteling works |
| 12 | RCC Work rcc work with cement approved corase sand and 2cm gauge approved stone ballast in propporation 1:1.5:3 in lintels od foor and windows exculidng supply of reinforcement and its bending but including its fixing and binding and shuttering etc and also including supply of all material labour and T&P etc required for proper completion of the works strenght of the concrete shal not be less than M-20 . As in the aove item No 283 but RCC in coumn Ratio 1:1.5:3 pwd SI 283 footing |
| 13 | RCC Work rcc work with cement approved corase sand and 2cm gauge approved stone ballast in propporation 1:1.5:3 in lintels od foor and windows exculidng supply of reinforcement and its bending but including its fixing and binding and shuttering etc and also including supply of all material labour and T&P etc required for proper completion of the works strenght of the concrete shal not be less than M-20 . As in the aove item No 283 but RCC in coumn Ratio 1:1.5:3 pwd SI 283 slab |
| 14 | TOR Steel M.S. (tor steel or plain) in Plain work such as RCC or R.B. work including bending for proper shape and including supply of steel & its wastage bend, hooks and authorised overlapping shall be measured and including cost of binding wire. Excluding GST S.I 504 |
| 15 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 metre and lead upto 30 Mtr. Including filling watering and ramming of excavated earth into the trenches of into the space between the building and the sides of foundation trenches or into the plinth and removal & disposal of surplus earth upto 2 Km as directed by the Engineer incharge upto a distance of 30m from the foundation trenches. Excluding GST SI N 251 |
| 16 | EarthFilling in plinth under the floor including watering ramming consoliding and dressing complete including lead upto 50 and lift upto1.5 m carted earth |
| 17 | Concrete with 4 cm gauge brick ballast fine sand of 1.25 F.M. and cement in proportion of 8:4:1 in foundations and under floors including supply of all materials, labour, tools & plants etc. required for proper completion of the work. Pwd si 281 |
| 18 | Class 150 Brick work in proportions of 1 : 6 cement and fine sand of 1.25 FM in founadtion and plinth including supply of all materials, labour, tools & plant etc required for proper completion of the work.upto plinth level pwd si 303 |
| 19 | Class 150 Brick work in proportions of 1 : 6 cement and fine sand of 1.25 FM in above plinth level upto floor two including supply of all materials, labour, tools & plant etc required for proper completion of the work.brick work in thickness of wall more than 12 cm pwd si310 |
| 20 | RCC Work rcc work with cement approved corase sand and 2cm gauge approved stone ballast in propporation 1:1.5:3 in lintels od foor and windows exculidng supply of reinforcement and its bending but including its fixing and binding and shuttering etc and also including supply of all material labour and T&P etc required for proper completion of the works strenght of the concrete shal not be less than M-20 . As in the aove item No 283 but RCC in coumn Ratio 1:1.5:3 pwd SI 283 |
| 21 | TOR Steel M.S. (tor steel or plain) in Plain work such as RCC or R.B. work including bending for proper shape and including supply of steel & its wastage bend, hooks and authorised overlapping shall be measured and including cost of binding wire. Excluding GST S.I 504 |
| 22 | Flooring supply and fixing of kota stone in flooring 20mm thick and joint filled with 1:2 cement and corase sand with approved clorouring materials to be given an even shade with 12 mm base coat bedding of 1:2 cement and coars sand |
| 23 | Kota stone slabs 20 mm thick in risers of steps, skirting, dado and pillarslaid on 12 mm (average) thick cement mortar 1:3 (1 cement: 3 coarsesand) and jointed with grey cement slurry mixed with pigment to matchthe shade of the slabs, including rubbing and polishing complete. |
| 24 | Providing and laying of coloured interlocking 80mm thick etc complete |
| 25 | Supply and fixing of rcc bench |
| 26 | Cost of misc work (dosmantling of room widening of entry) |
| 27 | Add GST@ 18% |
| 28 | Add Labour Cess @1% |
| 29 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 metre and lead upto 30 Mtr. Including filling watering and ramming of excavated earth into the trenches of into the space between the building and the sides of foundation trenches or into the plinth and removal & disposal of surplus earth upto 2 Km as directed by the Engineer incharge upto a distance of 30m from the foundation trenches. Excluding GST SI N 251 |
| 30 | Concrete with 4 cm gauge brick ballast fine sand of 1.25 F.M. and cement in proportion of 8:4:1 in foundations and under floors including supply of all materials, labour, tools & plants etc. required for proper completion of the work. Pwd si 281 |
| 31 | Class 150 Brick work in proportions of 1 : 6 cement and fine sand of 1.25 FM in founadtion and plinth including supply of all materials, labour, tools & plant etc required for proper completion of the work.upto plinth level pwd si 303 |
| 32 | Class 150 Brick work in proportions of 1 : 6 cement and fine sand of 1.25 FM in above plinth level upto floor two including supply of all materials, labour, tools & plant etc required for proper completion of the work.brick work in thickness of wall more than 12 cm pwd si310 |
| 33 | RCC Work rcc work with cement approved corase sand and 2cm gauge approved stone ballast in propporation 1:1.5:3 in lintels od foor and windows exculidng supply of reinforcement and its bending but including its fixing and binding and shuttering etc and also including supply of all material labour and T&P etc required for proper completion of the works strenght of the concrete shal not be less than M-20 . As in the aove item No 283 but RCC in coumn Ratio 1:1.5:3 pwd SI 283 |
| 34 | TOR Steel M.S. (tor steel or plain) in Plain work such as RCC or R.B. work including bending for proper shape and including supply of steel & its wastage bend, hooks and authorised overlapping shall be measured and including cost of binding wire. Excluding GST S.I 504 |
| 35 | Add GST@ 18% |
| 36 | Add Labour Cess @1% |
| 37 | Solar Street light |
| 38 | Solar High Mast Street light |
| 39 | Ro water with water coolar |
| 40 | Area on Ground floor yatri shed ht 3.5 |
| 41 | internal water supply &and saitary system |
| 42 | internal water supply &and saitary system |
| 43 | electrical external service connection |
| 44 | civill external service connection |
| 45 | local body approvals |
| 46 | internal electical installation |
| 47 | third party quality assurance |
| 48 | open stam water draiange line grid etc |
| 49 | Supply & fixing of 9 mtr GI Octagonal Pole of approvedmake (top dia 70mm, Bottom dia 155 mm and base plate12mm thik) having 3mm thikness with single armbracket (1 Mtr length) on RCC foundation including thecost of foundation, foundation bolts, excavation & backfilling and Required T&P completee in all respect. |
| 50 | Supply and fixing of LED Street light Fitting havingdie cast aluminium body and diffuser with driver setsuitable for 52 watt to 72 Watt. Confirming to IP66Protection complete in all respect. |
| 51 | Supply and fixing of thee core aluminum cable and mcb Protection complete in all respect. |
| 52 | Add GST@ 18% |
| 53 | Add Labour Cess @1% |
| 54 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 metre and lead upto 30 Mtr. Including filling watering and ramming of excavated earth into the trenches of into the space between the building and the sides of foundation trenches or into the plinth and removal & disposal of surplus earth upto 2 Km as directed by the Engineer incharge upto a distance of 30m from the foundation trenches. Excluding GST SI N 251 |
| 55 | Concrete with 4 cm gauge brick ballast fine sand of 1.25 F.M. and cement in proportion of 8:4:1 in foundations and under floors including supply of all materials, labour, tools & plants etc. required for proper completion of the work. Pwd si 281 |
| 56 | Class 150 Brick work in proportions of 1 : 6 cement and fine sand of 1.25 FM in founadtion and plinth including supply of all materials, labour, tools & plant etc required for proper completion of the work.upto plinth level pwd si 303 |
| 57 | Class 150 Brick work in proportions of 1 : 6 cement and fine sand of 1.25 FM in above plinth level upto floor two including supply of all materials, labour, tools & plant etc required for proper completion of the work.brick work in thickness of wall more than 12 cm pwd si310 |
| 58 | RCC Work rcc work with cement approved corase sand and 2cm gauge approved stone ballast in propporation 1:1.5:3 in lintels od foor and windows exculidng supply of reinforcement and its bending but including its fixing and binding and shuttering etc and also including supply of all material labour and T&P etc required for proper completion of the works strenght of the concrete shal not be less than M-20 . As in the aove item No 283 but RCC in coumn Ratio 1:1.5:3 pwd SI 283 |
| 59 | TOR Steel M.S. (tor steel or plain) in Plain work such as RCC or R.B. work including bending for proper shape and including supply of steel & its wastage bend, hooks and authorised overlapping shall be measured and including cost of binding wire. Excluding GST S.I 504 |
| 60 | Add GST@ 18% |
| 61 | Add Labour Cess @1% Please Enable Macros to View BoQ information |