|
| 1 | Construction of Embankment with material obtained from Boorrow Pit with a lift of 1.50 m. and transporting upto site. spreading,grinding to required slope and compacting to meet requirement to table no. 30.1 and 300.2 with lead upto 3 Km. as per clause 301.5 (Excluding GST) |
| 2 | Providing and laying of 600 mm Dia Hume pipe.(Excluding GST) |
| 3 | Supply and laying Brick soling laid on edge with new bricks in the soling road i/c all material, labour and T&P etc completed. (Excluding GST) |
| 4 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres (Excluding GST) |
| 5 | Excavation of foundation in ordinary soil (Ioam clay or sand) including lift up to 1.50 meter and lead up to 30meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer in charge up to a distance of 30 meters from the foundation trenches.as per S.I. No. 251 (Excluding GST) |
| 6 | Sand Filling in plinth under foundation, floors including watering ramming consolidating and dressing complete including lead up to 50 m and lift up to 1.5 m including cost of sand. (Excluding GST) |
| 7 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.(Excluding GST) |
| 8 | Plain/Reinforced Cement Concrete in Sub/Super structure complete as per Drawing and Technical Specifications. RCC Grade M30 using batching plant transit mixer & manual placing (Excluding GST) |
| 9 | Providing and fabrication, transportation, storing, binding and fixing in position uncoated HYSD bar reinforcement in foundation all complete as per drawing and technical specification 1600, 2100. as per SI No 504 (Excluding GST) |
| 10 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M35 using batching plant transit mixer & Concrete pump (Excluding GST) |
| 11 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm Dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications (Excluding GST) |
| 12 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification (Excluding GST) |
| 13 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2..(Carted Upto 3.0 km) (Excluding GST) |
| 14 | (A) By Mix in Place MethodConstruction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MORD Technical Speicification Clause 401 (Excluding GST) |
| 15 | Providing, laying, spreading and compacting stone aggregates from approved quarry to Wet Mix macadam specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layer with paver in sub basae/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MORTH specification 406.(Excluding GST) |
| 16 | Providing and applying Primer coat with bitumen emulsion on prepared (SS-2) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.70 kg / sqm using mechanical means. As per technical specification clause 502.(Excluding GST) |
| 17 | Providing and laying dense graded bituminous macadam with 60-90 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 4.50 percent by weight of total mix and filler, fransporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects.. As per Sr No. 5.6 & MoRT&H Specification Ref. No. 507 (GST will be paid extra as applicable) including labour cess. .(Excluding GST) |
| 18 | Providing and applying tack coat with bitumen (VG-10)using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Speicification Clause 503.(Excluding GST) |
| 19 | Providing and laying bituminous concrete with 60-90 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder (VG 30) @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction As per Sr No. 5.8 & MoRT&H Specification Ref. No. 509 (GST will be paid extra as applicable) including labour cess..(Excluding GST) Please Enable Macros to View BoQ information |