| 1 | Earth work excavation in all kind of soil with initial lead and lift including rough dressing to bottom layersand the disposing the excavated Earth by pvt transport vehicles with supply of all material labour transporation charges, taxes, tollage , royalties,port entry fees etc all complete but excluding GST as directed by EIC |
| 2 | P.C.C(1:3:6) by using 20 mm. & down size C.B.G chips of approved quality in foundation & plinth including mixing hosting, laying to proper level & slope, consolidating, curing charges etc. all complete including cost & supply of all materials, labour, T&P, taxes , tollage , royalties etcbut excluding GST as directed by EIC |
| 3 | C.C. M 30 for R.C.C. works using 20mm and 10 mm size C.B.G. chips of approved quality for foundation & plinth including mixing with a concrete mixture as per approved design mix, hoisting, laying, compacting with 40/ 60mmneddle vibrator as and when required, curing with cost and supply of all materials, labour, T&P, taxes, tollage, royalties, machinary charges etc. all complete but Excluding GST & centring and shuttering chargesdirected by Engineer-in-charge. |
| 4 | Providing reinforcement steel of required diameter manufactured by Integrated steel Plant (Original Steel manufacture Company), not from rolling mills,Steel of Fe-500 confirming to IS-1786 including cutting, straightening, bending, binding & placing the grills in position for RCC works including binding the grills with binding wire of 18 to 20 gauge including cost of steel, all labour, materials, binding wire, transportation charges,loading at one end & unloading at other end,T&P, all taxes,etc.all complete as per the direction of Engineer-in-charge but excludingGST. (NB: No Wastageshall be Paid, Steel Coefficient shall be considered as per IS1786 for Payment Purpose.) |
| 5 | Providing rigid smooth leak proof centering & shuttering made ofsteel/ply, plank & MS pipes, jacks and other accessories of approved quality for R.C.C. work for following structures and deshuttering, removing the same after due period with painting with coal tar /lubricants on the ply/steel surface after each use with supply of all materials, labour,transportation, T&P, all taxes, royalties, tollage, but excludingGST etc. complete as directed by Engineer-in-charge. |
| 6 | Foundation plinth |
| 7 | wall,column,beam |
| 8 | Roof slab |
| 9 | Filling the low laying area with dreged spoil as per required level in layer wise ,each layer not exceed 1mtr.,watering,compacting with VRR to achive OMC etc. complete excluding GST and as per direction of Engineer in charge. |
| 10 | Providing & layingquarry dust of aprroved quality as sub-base in layers not exceeding 225mm thickwatering and compacting to the required density to achive O.M.C with Vibratory Road Roller with supply of all material labour transporation charges, hire and running charge of all equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC. |
| 11 | Providing, laying, spreading and compacting stone aggregates of IRC Gr-II(63 mm to 45 mm ) size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling withvibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite quantity of quaary dust to fill up the interstices, watering and compacting to the required density as per clause 404 of MORTH specification for Road & Bridge works with supply of all material labour transporation charges, hire and running charges of all equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC |
| 12 | Engagement the following machineries for Cutting & removal of Extra earth & debrisesfrom the work site including loading one end & unloading at the other end, engagement,hire and running charges, operator expenses,fuel,lubricants with all materials, labour, T&P, taxes, transportation charges,etc all complete but excluding GST as per direction of Engineer-in-charge.NB-No idle Charges of machinaries shall be paid. |
| 13 | Engagement of Earth Excavator 2 Cum bucket Capacity |
| 14 | Engagement of Hyva |
| 15 | Supply of unskilled labour for manual scarifing, lifting of cables & other miscellaneous work with supply of all T&P, Special T&P, taxes, gate entry fees, safety arrangements etc. all complete excluding GST and as per direction of Engineer in charge. |