| 1 | Maintenance/serviceing of EOT 10 Ton (electrically operated cranes) by the following method:-(i) Replacement of gear oil in gear boxes.(ii) Grease the whole crane. (iii) Before ferilling the gear boxes clean the gear box for inside and outside by using deisel. (iv) Checking the wheel condition.(v) If thruster breaks are used check the level of oil in it. If required to be refilled, refilled the same. (vi) Check the working of the break if required to change, then change the same. (vii) Checking the connections of motors. (viii) Check the condition of motors if required to be rewind, rewind the same. (ix) Checking the condition of couplings. If required to be change, change the same. (x) Check the nuts & bolts fitted on the crane. If required to be then change the same. (xi) Check the wire rope of the crane. If required to be replaced, replaced the same. (xii) Check the condition of power cables fitted on the crane. If required to be change, change the same. (xiii) Check the break shoe fitted on the break of the crane, If required to be replaced, replaced the same. (xiv) Check the limit switch fitted on the crane, if found unsv replaced the same. (xv) Check step down transformer, single phase preventer, thermal block, MCB, HRC and DBR, if found unsv repalced the same. (xvi) If VFD installed check the same, if found unsv replaced the same and check all the motions of VFD. (xvii) Check the pendent, if element and push buttons found unsv replaced the same complete all as specified and directed by Engr-in-Charge. |
| 2 | Maintenance/serviceing of EOT 08 Ton (electrically operated cranes)by the following method:-(i) Replacement of gear oil in gear boxes.(ii) Grease the whole crane. (iii) Before ferilling the gear boxes clean the gear box for inside and outside by using deisel. (iv) Checking the wheel condition.(v) If thruster breaks are used check the level of oil in it. If required to be refilled, refilled the same. (vi) Check the working of the break if required to change, then change the same. (vii) Checking the connections of motors. (viii) Check the condition of motors if required to be rewind, rewind the same. (ix) Checking the condition of couplings. If required to be change, change the same. (x) Check the nuts & bolts fitted on the crane. If required to be then change the same. (xi) Check the wire rope of the crane. If required to be replaced, replaced the same. (xii) Check the condition of power cables fitted on the crane. If required to be change, change the same.(xiii) Check the break shoe fitted on the break of the crane, If required to be replaced, replaced the same. (xiv) Check the limit switch fitted on the crane, if found unsv replaced the same. (xv) Check step down transformer, single phase preventer, thermal block, MCB, HRC and DBR, if found unsv repalced the same. (xvi) If VFD installed check the same, if found unsv replaced the same and check all the motions of VFD. (xvii) Check the pendent, if element and push buttons found unsv replaced the same complete all as specified and directed by Engr-in-Charge. |
| 3 | Maintenance/serviceing of EOT 05 Ton (electrically operated cranes)by the following method:-(i) Replacement of gear oil in gear boxes.(ii) Grease the whole crane. (iii) Before ferilling the gear boxes clean the gear box for inside and outside by using deisel. (iv) Checking the wheel condition.(v) If thruster breaks are used check the level of oil in it. If required to be refilled, refilled the same. (vi) Check the working of the break if required to change, then change the same. (vii) Checking the connections of motors. (viii) Check the condition of motors if required to be rewind, rewind the same. (ix) Checking the condition of couplings. If required to be change, change the same. (x) Check the nuts & bolts fitted on the crane. If required to be then change the same. (xi) Check the wire rope of the crane. If required to be replaced, replaced the same. (xii) Check the condition of power cables fitted on the crane. If required to be change, change the same. (xiii) Check the break shoe fitted on the break of the crane, If required to be replaced, replaced the same. (xiv) Check the limit switch fitted on the crane, if found unsv replaced the same. (xv) Check step down transformer, single phase preventer, thermal block, MCB, HRC and DBR, if found unsv repalced the same. (xvi) If VFD installed check the same, if found unsv replaced the same and check all the motions of VFD. (xvii) Check the pendent, if element and push buttons found unsv replaced the same complete all as specified and directed by Engr-in-Charge. |
| 4 | Maintenance/serviceing of EOT 02 Ton (electrically operated cranes) by the following method:-(i) Replacement of gear oil in gear boxes.(ii) Grease the whole crane. (iii) Before ferilling the gear boxes clean the gear box for inside and outside by using deisel. (iv) Checking the wheel condition.(v) If thruster breaks are used check the level of oil in it. If required to be refilled, refilled the same. (vi) Check the working of the break if required to change, then change the same. (vii) Checking the connections of motors. (viii) Check the condition of motors if required to be rewind, rewind the same. (ix) Checking the condition of couplings. If required to be change, change the same. (x) Check the nuts & bolts fitted on the crane. If required to be then change the same. (xi) Check the wire rope of the crane. If required to be replaced, replaced the same. (xii) Check the condition of power cables fitted on the crane. If required to be change, change the same. (xiii) Check the break shoe fitted on the break of the crane, If required to be replaced, replaced the same. (xiv) Check the limit switch fitted on the crane, if found unsv replaced the same. (xv) Check step down transformer, single phase preventer, thermal block, MCB, HRC and DBR, if found unsv repalced the same. (xvi) If VFD installed check the same, if found unsv replaced the same and check all the motions of VFD. (xvii) Check the pendent, if element and push buttons found unsv replaced the same complete all as specified and directed by Engr-in-Charge. |
| 5 | Maintenance/serviceing of EOT 1.00/ 0.5 Ton (electrically operated cranes) by the following method:-(i) Replacement of gear oil in gear boxes.(ii) Grease the whole crane. (iii) Before ferilling the gear boxes clean the gear box for inside and outside by using deisel. (iv) Checking the wheel condition.(v) If thruster breaks are used check the level of oil in it. If required to be refilled, refilled the same. (vi) Check the working of the break if required to change, then change the same. (vii) Checking the connections of motors. (viii) Check the condition of motors if required to be rewind, rewind the same. (ix) Checking the condition of couplings. If required to be change, change the same. (x) Check the nuts & bolts fitted on the crane. If required to be then change the same. (xi) Check the wire rope of the crane. If required to be replaced, replaced the same. (xii) Check the condition of power cables fitted on the crane. If required to be change, change the same. (xiii) Check the break shoe fitted on the break of the crane, If required to be replaced, replaced the same. (xiv) Check the limit switch fitted on the crane, if found unsv replaced the same. (xv) Check step down transformer, single phase preventer, thermal block, MCB, HRC and DBR, if found unsv repalced the same. (xvi) If VFD installed check the same, if found unsv replaced the same and check all the motions of VFD. (xvii) Check the pendent, if element and push buttons found unsv replaced the same complete all as specified and directed by Engr-in-Charge. |
| 6 | Notes for srl No 01 to 05 :-1. Maintenance, Servicing, repairing of EOT shall be carried out by OEM or their authorised agency only. Contractor shall submit MoU for this aspect within 28 days of Acceptance of tender failing which a penalty of Rs 500/- per day shall be imposed and contract shall liable to be cancelled and no claim shall be entertained on this account.2. Spare parts shall be measured and paid for separately under respective items as Supply only.3.Parts replaced shall be as per existing make. 4. Parts of minor nature such as nuts, bolts, screws & washers required at site are deemed to be included in the cost quoted. 5. Post Maint / Servicing of the gantry if any unserviceability is reported, the contractor must employ a technician who is readily available to attend the same with in 24 Hrs of receipt of complaint. Failure to this will impose a penality of Rs. 500/- per hour of delay after 24 Hrs. |
| 7 | Material and labour for load testing of crane any type any make infront of rep of Engr-in-Charge and AF auth complete all as specified and as directed.Note : -(i) Load will be provided by AF auth. (ii) Load test shall be carried out by any state govt / central govt or authorised rep of OEM agency and certificate of load testing shall be provided by the same authority. |
| 8 | Supply only Gear oil SAF-90 No for EOT crane as per sample, complete all as specified and directed. |
| 9 | Supply only Transformer oil for EOT crane as per sample, complete all as specified and directed. |
| 10 | Supply only Greasefor EOT crane as per sample, complete all as specified and directed. |
| 11 | Supply only Contactor 3 phase 24 Ampfor EOT crane as per sample, complete all as specified and directed. |
| 12 | Supply only Contactor 3 phase 18 Ampfor EOT crane as per sample, complete all as specified and directed. |
| 13 | Supply only Contactor 3 phase 12 Ampfor EOT crane as per sample, complete all as specified and directed. |
| 14 | Supply only Couplingfor EOT crane as per sample, complete all as specified and directed. |
| 15 | Supply only VFD 15HPfor EOT crane as per sample, complete all as specified and directed. |
| 16 | Supply only VFD 5HPfor EOT crane as per sample, complete all as specified and directed. |
| 17 | Supply only VFD 3HPfor EOT crane as per sample, complete all as specified and directed. |
| 18 | M&l for rewinding of Hoist motor of capacity 10 HP to 7.5HP with super enamelled copper wire of size, gauge, weight and specification as that of exisiting material including insulation paper strips and thread etc, complete all as specified and directed |
| 19 | M&L for rewinding of electric motor of capacity5 HP to 3HP with super enamelled copper wire of size, gauge, weight and specification as that of exisiting material including insulation paper strips and thread etc complete all as specified and directed |
| 20 | M&L for rewinding of electric motor of capacity3 HP to 0.5HP with super enamelled copper wire of size, gauge, weight and specification as that of exisiting material including insulation paper strips and thread etc complete all as specified and directed |
| 21 | Supply only Power cable 6 Sqmm x 4 corefor EOT crane as per sample, complete all as specified and directed. |
| 22 | Supply only Power cable 4 Sqmm x 4 corefor EOT crane as per sample, complete all as specified and directed. |
| 23 | Supply only Power cable 1.5 Sqmm x 4 corefor EOT crane as per sample, complete all as specified and directed. |
| 24 | Supply only Step down transformerfor EOT crane as per sample, complete all as specified and directed. |
| 25 | Supply only Single phase preventerfor EOT crane as per sample, complete all as specified and directed. |
| 26 | Supply only Terminal blockfor EOT crane as per sample, complete all as specified and directed. |
| 27 | Supply only MCB TPN 63 Amp for EOT crane as per sample, complete all as specified and directed. |
| 28 | Supply only DBR for EOT crane as per sample, complete all as specified and directed. |
| 29 | Supply only wire rope 16mm for EOT crane as per sample, complete all as specified and directed. |
| 30 | Supply only wire rope 12mm for EOT crane as per sample, complete all as specified and directed. |
| 31 | Supply only wire rope 8mm for EOT crane as per sample, complete all as specified and directed. |
| 32 | Supply only wire rope 6mm for EOT crane as per sample, complete all as specified and directed. |
| 33 | Supply only Thruster break 150mm for EOT crane as per sample, complete all as specified and directed. |
| 34 | Supply only Thruster break 100mm for EOT crane as per sample, complete all as specified and directed. |
| 35 | Supply only Break AC Shoe type 150mm for EOT crane as per sample, complete all as specified and directed. |
| 36 | Supply only Break AC Shoe type 100mm for EOT crane as per sample, complete all as specified and directed. |
| 37 | Supply only Break AC disc type 100mm for EOT crane as per sample, complete all as specified and directed. |
| 38 | Supply only Break shoe for EOT crane as per sample, complete all as specified and directed. |
| 39 | Supply only Limit switch FP for Hoist for EOT crane as per sample, complete all as specified and directed. |
| 40 | Supply only Limit switch LT & CT F/P for Hoist for Hoist for EOT crane as per sample, complete all as specified and directed. |
| 41 | Supply only Limit switch N/F/P for EOT crane as per sample, complete all as specified and directed. |
| 42 | Supply only Element of Limit switch for EOT crane as per sample, complete all as specified and directed. |
| 43 | Supply only Element of Push button for EOT crane as per sample, complete all as specified and directed. |
| 44 | Supply only Push button F/P station for EOT crane as per sample, complete all as specified and directed. |
| 45 | Supply only Push button station N/F/P for EOT crane as per sample, complete all as specified and directed. |
| 46 | M&L for reprogramming / resetting of exixting AC drive / variable frequency drive (VFD) / frequency converter device 3 phase supply system complete and testing on load and making disturbed wiring connection as properly system for smooth controlling panel of OHT crane and including replacement of defected / burn out control wiring connection for main controlling panel of crane as per existing system and including replacement of burnt out FRLS PVC insulated electric wire with copper conductor wirirng having of single core of size 0.5 sqmm to 2.5 sqmm, 1100 volt grade complete entire satisfactiion of Engineer -in-charge, complete all as specified and directed. |
| 47 | Taking down and repair of existing thruster break assembly and including rewinding of thruster break unit as per existing type/gauge of winding material and replacement of oil seal with connecting fixing accessories as per existing sample/model suitable for 2 to 5 Ton EOT crane and testing on load entire satisfaction of Engineer-in-charge, complete all as specified and directed. |
| 48 | Taking down and repair of existing thruster break assembly and including rewinding of thruster break unit as per existing type/gauge of winding material and replacement of oil seal with connecting fixing accessories as per existing sample/model suitable for 10 Ton EOT crane and testing on load entire satisfaction of Engineer-in-charge, complete all as specified and directed. |
| 49 | M&L for painting of EOTdouble girder travelling over head crane system alongwith trolly, footpath, railling system and its connected item fixing accessories/equipments complete for crane system by applying two coats of synthetic enamel paint of existing type color code after scrapping of old rusted surface and cleaning of oil and grease, soil dust particles material by manually with sand paper suitable for any capacity and Span and girder of any lenght, complete all as specified and directed. |
| 50 | M&L for painting of two coats of synthetic enamel paint of ISMB/Side Girders of crane in buildings of different sizes at different locations, cleaning the girders with waste cloth before painting complete with as per existing color complete all as specified and directed. |
| 51 | Labour only for locating the fault in EOT cranes, any capacity, make and type including rectification of minor defects such as tightening of nut & bolts, checking and rectfying loose connection of control panels, accesoories and current collectors, replacing of fuse wire etc to keep the cranes functional, complete all as specified and directed. Note :-(i) Supply only spare parts excluding minor parts will be measured and paid for under relevant items.(ii)Contractor shall attend day to day basis complaint of crane regularly as and when called within two to six hours effected time & maintenance shall be carried out accordingly for smooth funtioning of crane and cost of the same shall deemed to be included in the quoted rates. |
| 52 | Maintenance & serviceing of Hanger doors (electrically operated doors any type any make) by the following method on any locations:-(i) Replacement of gear oil in gear boxes.(ii) Grease the wheels. (iii) Before ferilling the gear boxes clean the gear box for inside and outside by using deisel. (iv) Checking the wheel condition.(v) Check the working of the chain if reqd to be changes, then change the same.(vi) Checking the connections of motors.(vii) Check condition of motor if reqd to rewind, rewind the same.(viii) Checking the condition of coupling. if reqd to be change then change the same.(ix) Check the nuts & bolts fitted on the door. if reqd to be change then change the same.(x) Check condition of power cables fitted on the doors. if reqd to be change, change the same.(xi) Check limit switch fitted on the door. if reqd to be change, change the same.(xii) Check step down transformer, single phase preventer, terminal block, MCB, HRC and DBR if reqd to be change, change the same.(xiii) If VFD installed check the same if reqd to be cahnge, change the same. If VFD installed at all motions check each motion.(xiv) Check the pendent if element and push button reqd to be change, then change the samecomplete all as specified and directed by Engr-in-Charge. |
| 53 | Note for Item No 52 :- 1. Maintenance, Servicing, repairing of Door Hanger shall be carried out by OEM or their authorised agency only. Contractor shall submit MoU for this aspect within 28 days of Acceptance of tender failing which a penalty of Rs 500/- per day shall be imposed and contract shall liable to be cancelled and no claim shall be entertained on this account.2. Spare parts shall be measured and paid for separately under respective items as Supply only.3. Parts replaced shall be as per existing make.4. Parts of minor nature such as nuts, bolts, screws & washers required at site are deemed to be included in the cost quoted. 5. If Door shifted to workshop for repair, rates included for dismantling and taking down and loading in suitable vehicle and refixing the same after repairs. Transportation charges deemed to be included in quoted price for To & Fro.6. Post Maint/Servicing of the Door if any unserviceability is reported, the contractor must employ a technician who is readily available to attend the same with in 24 Hrs of receipt of complaint. Failure to this will impose a penality of Rs. 200/- per hour of delay after 24 Hrs.7. Servicing/Maint of the Doors must be carried as per schedule given by the Engr-in-Charge. Non-adherence to timelines given will impose a penality of Rs. 500/- per day of delay. |
| 54 | Supply only Gear oil 90 No for Hanger doors, complete all as specified and directed. |
| 55 | Supply only Chain for sprocket for Hanger doors as per existing sample, complete all as specified and directed. |
| 56 | Supply only Greasefor Hanger doors, complete all as specified and directed. |
| 57 | Supply only Contactor 3 phase 24 Ampfor Hanger door as per existing sample, complete all as specified and directed. |
| 58 | Supply only Contactor 3 phase 18 Ampfor Hanger doors as per existing sample, complete all as specified and directed. |
| 59 | Supply only Contactor 3 phase 12 Ampfor Hanger doors as per existing sample, complete all as specified and directed. |
| 60 | Supply only Contactor 3 phase 09 Ampfor Hanger doors as per existing sample, complete all as specified and directed. |
| 61 | Supply only Sprocketfor Hanger doors as per existing sample, complete all as specified and directed. |
| 62 | Supply only Nut and boltsfor Hanger doors, complete all as specified and directed. |
| 63 | Supply only VFD 7.5 HPfor Hanger doors as per existing sample, complete all as specified and directed. |
| 64 | Supply only VFD 5 HPfor Hanger doors as per existing sample, complete all as specified and directed. |
| 65 | Supply only VFD 3 HPfor Hanger doors as per existing sample, complete all as specified and directed. |
| 66 | M&L for rewinding of Electricmotor of capacity10 HP to 7.5HP with super enamelled copper wire of size, gauge, weight and specification as that of exisiting material including insulation paper strips and thread etc, complete all as specified and directed. |
| 67 | M&L for rewinding of electric motor of capacity5 HP to 3HP with super enamelled copper wire of size, gauge, weight and specification as that of exisiting material including insulation paper strips and thread etc, complete all as specified and directed. |
| 68 | M&L for rewinding of electric motor of capacity3 HP to 0.5HP with super enamelled copper wire of size, gauge, weight and specification as that of exisiting material including insulation paper strips and thread etc, complete all as specified and directed. |
| 69 | Supply only Power cable 6 Sqmm x 3 corefor Hanger Doors as per sample provided by OEM/original manfacturer, complete all as specified and directed. |
| 70 | Supply only Power cable 4 Sqmm x 3 corefor Hanger Doors as per sample provided by OEM/original manfacturer, complete all as specified and directed. |
| 71 | Supply only Power cable 1.5 Sqmm x 3 corefor Hanger Doors as per sample provided by OEM/original manfacturer, complete all as specified and directed. |
| 72 | Supply only Step down transformerfor Hanger Doors as per existing sample, complete all as specified and directed. |
| 73 | Supply only Single phase preventerfor Hanger Doors as per existing sample, complete all as specified and directed. |
| 74 | Supply only Terminal blockfor Hanger Doors as per existing sample, complete all as specified and directed. |
| 75 | Supply only MCBs 18 Amp for Hanger Doors, complete all as specified and directed. |
| 76 | Supply only MCBs 25 Amp for Hanger Doors, complete all as specified and directed. |
| 77 | Supply only DBR for Hanger Doors as per existing sample, complete all as specified and directed. |
| 78 | Supply only Limit switch for Hanger Doors as per existing sample, complete all as specified and directed. |
| 79 | Supply only Element of Limit switch for Hanger Doors as per existing sample, complete all as specified and directed. |
| 80 | Supply only Element of Push button for Hanger Doors as per existing sample, complete all as specified and directed. |
| 81 | Supply only Push button Element for Hanger Doors as per existing sample, complete all as specified and directed. |
| 82 | Supply only Wheel for Hanger Doors as per existing sample, complete all as specified and directed. |
| 83 | M&L for repair, Overhaulling, Maintenance of electric Driven car washing pumping set with suitable capacity of 3 HP, 3 Phase, 415 Volts with connected all accessories such as suitable size & length of rubber pipe, Nozzle etc. as provided by manufacturer complete making it operatinal to the satisfaction of Engr-in-charge, complete all as specified and directed. |
| 84 | M&L for repairing, Overhaulling, Maintenance of Hydraulic lifting Jack of Capacity 5 Ton complete with suitable size of ramp girder, hydraulic oil tank of suitable capacity includes first full of hydraulic oil, suitable capacity of air compressor mounted on hydralic oil tank, including motor, starter, automatic pressure switch, pressure gauge, safety valves, non return valve, visible oil level indicator, belt guard and hydraulic pressure pipe of suitable size as provided by manufacturer complete making it operatinal to the satisfaction of Engr-in-charge, complete all as specified and directed. |
| 85 | M&L for epairing, Overhaulling, Maintenance of Air compressor electric driven three phase motor model (TS 05 120 HN TC-500) , two stage, two cylinder giving free air delivery of 14.5 CFM at 175psi/12Kg, cm2 pressure.Compressor is mounted on 220 litrs tank the supply complete with motor, starter, automatic pressure switch, pressure gauge, safety valves, non return valves, visible oil level indicator belt size as provided by manufacturer complete making it operatinal to the satisfaction of Engr-in-charge, complete all as specified and directed.Note :-1. Servicing & Maint of the items Ser No. 83 to 85 must be carried as per schedule given by the Engr-in-Charge. 2. Any defective Spare Parts required to be replaced at site shall deemed to be included in quoted rates. |
| 86 | Material and labour for load testing of Hydraulic Jack in the presence of Engr-in-Charge and AF auth, complete all as specified and as directed.Note : Load test shall be carried out by any state govt / central govt or authorised rep / OEM agency and certificate of load testing shall be provided by the same authority. |