| 1 | Construction of embankment with approved material obtained from borrow pits with with all lift and lead transporting to site upto 3 Km , spreading, gradingto required slop and compacting to meet requiredment of table 300-2 as directed by the Engineer incharge.( including royality and labour cess). Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. |
| 2 | Providing, laying, spreading and compacting stone aggregates of 22.4 to 53mm. (Grading-3) size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. As per technical Specification clause 404. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. |
| 3 | Construction of un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30(Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints, applying debonding strips, primer, sealant, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and finished with Power Trowel Cum Floter-Trimix Flooring Machine.(Without Dowel Bar) Technical Specification Clause 1501. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. |
| 4 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. |
| 5 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. |
| 6 | RCC Grade M20 using batching plant transit mixer & Concrete pump MORT&H. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. |
| 7 | CSupplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications MORT&H Specification 1600,2200 Sr No 13.6. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. Please Enable Macros to View BoQ information |