Tender For Painting Of Radial Gates, Intake Gates, Intake Bulkhead Gates, Gantry Cranes, Trcm And Intake Gate Cylinders Along With Its Accessories At Omkareshwar Power Station, East Nimar-Madhya Pradesh
TDR : 52667852
Tender Notice
Corrigendum Details
BOQ
Expired
East Nimar
Madhya Pradesh
Corrigendum : Tender For Painting Of Radial Gates, Intake Gates, Intake Bulkhead Gates, Gantry Cranes, Trcm And Intake Gate Cylinders Along With Its Accessories At Omkareshwar Power Station
Name of Work: Painting of Radial gates, Intake Gates, Intake Bulkhead Gates, Gantry Cranes, TRCM and Intake Gate Cylinders along with its Accessories at Omkareshwar Power Station
Sl. No.
Item Description
1
Painting of Spillway gates, sluice gates, canal gates (both vertical or radial), stop log gates, exposed embedded parts and all un machined ferrous surface (hoist cylinders, cylinder heads, hydraulic piping, pipe fittings, bonnet covers), exposed to water as per IS 14177,for which surface preparation by blast cleaning of class \"B\" primer coat (one coat) of inorganic zinc silicate (preferably airless spray)or alternatively, two coats of zinc rich primer(containing not less than 85% zinc on dry film) to give dry film thickness of 70 ± 5micron and finish coat (two coats) of solvent less coal tar epoxy paint using airless spray to provide dry film thickness of 150±5 micron per coats. Thus, total dry film thickness of all the coats, including primer coating, should not be less than 350 microns, this will be include expenses on mobilisation and demobilisation of equipment’s. For maintenance painting the surface preparation shall be done by appropriate hand and power tool cleaning, prior to hand power tool cleaning. Any heavy layer of rust should be removed by chipping visible oil, grease, dirt and other foreign material be cleaned using solvents like clean mineral spirits, xylol or white gasoline. After hand and power tool cleaning the surface should be cleaned of loose dust and debris and/or blast cleaned as laid down in para 7.0 of IS code 14177. After the surface preparation the primer and finishing coats shall be carried out as provided above for painting. etc. complete.
2
Up to 1.5m height
3
Beyond 1.5m height
4
Painting of structural components of Hoist including supporting structures and surfaces of hydraulic hoist sun exposed to water as per IS:14177, for which surface preparation by blast cleaning of class \"B\", primer coat (two coats) of zinc phosphate primer to give dry film thickness of 40±5 microns per coat and finish coat (one coat) of alkyd based micaceous iron oxide paint give dry film thickness of 65±5 microns followed by two coats of synthetic enamel paint, using airless spray, to give dry film thickness of 25±5 microns per coat, at an interval of 24 Hours. Thus total dry film thickness of all the coats, including primer coating, should not be less than 175 microns. This will include expenses on mobilization and demobilisation of equipment\"s. For maintenace painting, the surface preparation shall be done by appropriate hand and power tool cleaning. Prior to hand and power tool cleaning, any heavy layer of rust should be removed by chipping. Visible oil, grease, dirt and other foreign material be cleaned using solvents like clean mineral spirits, xylol or white gasoline. After hand and power tool cleaning, the surface should be cleaned of loose dust and debris sand / blast cleaned as laid down in Para 7.0 of IS Code 14177. After the surface preparation, the primer and finishing coats shall be carried out as provided above for painting etc. complete.
5
Up to 1.5m height
6
Beyond 1.5m height
7
Painting of lifting beam / lifting tackles are per IS : 14177, for which surface preparation by blast cleaning, as per class \"C\" or class \"B\", primer coat (two coats) of zinc Phosphate primer, to provide dry film thickness of 40 microns per coat and finish coat (two coats) of alkyd based micaceous iron oxide paint, using airless spray, to provide minimum dry film thickness of 65± 5 microns per coat, at an interval of 24 hours. Thus, total dry film thickness of all the coats, including primer coating, should not be less than 200 microns. This will include expenses on mobilisation and demobilisation of equipment’s. For maintenance painting, the surface preparation shall be done by appropriate hand and power tool cleaning. Prior to hand and power tool cleaning, any heavy layer of rust should be removed by chipping. Visible oil, grease, dirt and other foreign material be cleaned using solvents like clean mineral spirits, xylol or white gasoline. After hand and power tool cleaning, the surface should be cleaned of loose dust and debris and / or blast cleaned as laid down in para 7.0 of IS Code14177. After the surface preparation, the primer and finishing coats shall be carried out as provided above for painting etc. complete.
We takes all possible care for accurate & authentic tender information, however Users