| 1 | Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5. SR No. 3.4 (Cartage Earth) (Including labour cess but GST will be paid extra as applicable) |
| 2 | Providing, laying and spreading Material on a prepared sub grade, added OPC Cement @ 2% by weight to the spread material, maunually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub base. (Including labour cess but GST will be paid extra as applicable) |
| 3 | Providing, laying and spreading Material on a prepared sub Base, added OPC cement @ 4% by weight to the spread Material, manually mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base.(Including labour cess but GST will be paid extra as applicable) |
| 4 | Tack Coat- Providing and applying tack coat with bitumen VG- 10 grade using pressure distributor at the rate of 0.35 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom. As per T.S.C. 503 & MORD SR N0-5.2(IV). (Including labour cess & Bitumen but GST will be paid extra as applicable) |
| 5 | Premix Carpet- Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm and 11.2 mm aggregates (Dala quarry) either using VG-10 grade bitumen to required line grade and level to serve as wearing coarse on a previously prepared base by manual means including mixing in a sutabule mixol laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades. as per T.S.C. 508. & MORD SR N0-5.9 (Including labour cess & Bitumen but GST will be paid extra as applicable) |
| 6 | Seal Coat type C- Providing and laying seal coat by manual means with VG- 10 grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per T.S.C. 510 & MORD SR N0-5.12 (Including labour cess & Bitumen but GST will be paid extra as applicable) |
| 7 | Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. Sr. No. 3.14 (Including labour cess & Bitumen but GST will be paid extra as applicable) |
| 8 | Earth work in excavation in foundation as per S.I. No 251 (Including labour cess but GST will be paid extra as applicable) |
| 9 | Concrete with 40 mm gauge brick ballast, fine sand of 1.25 F.M. and cement in the proportion of 8:4:1 as per S.I.No. 275 (Including labour cess but GST will be paid extra as applicable) |
| 10 | Brick masonry work in Cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specification clause 600, 1202 and 1203 II. Brick masonery in 1:4 cement mortar S.No. 11.5 (ii) (Including labour cess but GST will be paid extra as applicable) |
| 11 | Supply of 600 mm dia Hume pipe NP-3 type. As per SOR R.C.C. Spun Pipes Sr. No. 7. (Including labour cess but GST will be paid extra as applicable) |
| 12 | Laying and fixing of RCC Hume Pipe NP-3 class length 2.50 mtr (labour only) 600 mm dia. as per SOR No. 5(a) iii (Including labour cess but GST will be paid extra as applicable) |
| 13 | Supply and laying of Compacted 40mm gauge brick ballast arround and below hume pipe. As per SOR Material No. 2 (c) (Including labour cess but GST will be paid extra as applicable) |
| 14 | Struck pointing with 1:2 cement and fine sand. As per S.I. No. 574 (Including labour cess but GST will be paid extra as applicable) |
| 15 | Maintenance of constructed road for next five year after completion of work shall be paid. as per GO No 17/2024/lk0-113/23-1-2024-23-1099-113/2023 yksd fuekZ.k foHkkx vuqHkkx&1 fnuakd 16-01-2024 ,oa dk;kZy; izeq[k vfHk;Urk ;krk;kr oxZ yks0fu0fo0 y[kuÅ dk i=kad&3689lh&vks0ih0vkj0,e0lh0@ewy&23&24 fnuakd 17-02-2024- Payment shall be done as per satisfaction of engineer in chage regarding maintenance work carried out by contractor (Including Labour Cess but GST will paid extra as applicable). 1st year Zero Maintenance cost and 2nd year Total construction of cost Item No. 1 to 14 Rs 11356502.50 @ 0.75% |
| 16 | 3rd Year cost of BOQ @ 1.50% in Item No. 1 to 14 |
| 17 | 4rth Year cost of BOQ @ 2.25% in Item No. 1 to 14 |
| 18 | 5rth Year cost of BOQ @ 3% in item no. 1 to 14 Please Enable Macros to View BoQ information |