|
| 1 | 40MM |
| 2 | Supply and Fixing of M.S table E flange used for Oil & gas refinery |
| 3 | 80MM |
| 4 | 40MM |
| 5 | Supply and Fixing of ball valve with flange End |
| 6 | 80MM |
| 7 | 40MM |
| 8 | Supply and Fixing of Y Strainer |
| 9 | 80MM |
| 10 | 40MM |
| 11 | Supply and Fixing of Non return valve (NRV) |
| 12 | 40MM |
| 13 | Supply and Installation of Analog Flow metere for monitring of unloading of diesel from the tanker. |
| 14 | 80MM |
| 15 | Transportation of 25000 Ltrs HSD tank with loading and unloading from the manufacturing unit to JIPMER as per Engineering In charge |
| 16 | Supply and Painting of Two or more coat bitumen paint inner and outer side along with wrapping of 2mm thich bitumen sheet with complete coating in the HSD tank |
| 17 | Preparation of drawing documentation for obtaining proposed approval and final Licensing documents from the chief Explosive,Nagpur or joint Chief controller of explosive,Chennai including misclelleneous charges |
| 18 | High Speed diesel (HSD) tank installation, testing and commissioning work completion getting safety certificate under rule of 126 petroleum act from PESO. |
| 19 | Supply and drawn of following size of FRLS PVC insulated copper insulated copper condutor single core cable in the exisitng in the exsiting surface recesed steel/PVC conduit as required |
| 20 | 4x2.5Sqmm |
| 21 | Earth work |
| 22 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. |
| 23 | All kinds of soil |
| 24 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : |
| 25 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 26 | Reinforced Cement Concrete work |
| 27 | Centering and shuttering including strutting, propping etc. and removal of form for |
| 28 | Foundations, footings, bases of columns, etc. for mass concrete |
| 29 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : |
| 30 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 31 | Steel Reinforcement |
| 32 | Steel reinforment work for RCC including cutting,strigtining ,bending and placing in all position at complete level. |
| 33 | Thermo-Mechanically Treated bars of grade Fe-500D or more.and U -clamp wherever necessary. |
| 34 | Brick work |
| 35 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: |
| 36 | Cement mortar 1:4 (1 cement : 4 coarse sand). |
| 37 | Structural steel work |
| 38 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 39 | Finishing |
| 40 | 12 mm cement plaster of mix |
| 41 | 1:4 (1 cement: 4 fine sand) |
| 42 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade |
| 43 | Two or more coats on new work |
| 44 | Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound ) content. |
| 45 | With water thinnable cement primer on wall surface having VOC content less than 50 grams/litre |
| 46 | Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. |
| 47 | Two coats |
| 48 | Subtotal (A) |
| 49 | Buy back /Credit of dismantled of Under ground Bulk high speed Diesel(HSD) storage tank removing from the Existing Diesel Storage yard and shifting as per Engineering in - charge |
| 50 | Subtotal (B) |
| 51 | Total (Subtotal A-B) |
| 52 | GST 18% on Total |
| 53 | Grand Total |