Housing Urban and Rular Development Local Bodies Closing in 0 days TDR #52642472

Tender For Construction Of New Oht 30000 Lit At In Kanakiliyanalllur Panchayat

Issued by Local Bodies · pullambadi, Tamil Nadu
Tender Value
Ref. Documents
Estimated cost
Bid Submission
09 Dec 2025
0 days left
EMD
19710
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
pullambadi → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Construction Of New Oht 30000 Lit At In Kanakiliyanalllur Panchayat

BOQ

Name of Work:- 15Th Cfc (B.P)2025-26
Sl. No. Item Description
1Construction of new OHT 30000 LIT at in Kanakiliyanalllur Panchayat Pullambadi Panchyat Union. Earth work excavation in all type of soil like HSC soil with initial lead and lift including all other labour charges etc. complete as per SS20B double the rate for narrow foundation trenches. Ist depth
2Earth work excavation in all type of soil like HSC soil with initial lead and lift including all other labour charges etc. complete as per SS20B double the rate for narrow foundation trenches. IIst depth
3Providing M sand filling to 15cm thick including cost and conveyance of all materals to site and 100% compaction etc. complete for pavement portion.
4Cement concrete (1:4:8) mix using 40mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc. complete as per standard specification.
5Supplying and erecting steel centering for sides and soffits I including necessary supports\" and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete and as directed by TWAD Board officers. For below
6Supplying, fabrication and placing in position of HSD steel rods for reinforcement incluing the cost of steel and binding wire etc., complete
7RCC in M30 GRADE using graded of HBGs excluding cost of reinforcement,centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechancial vibrator, finishing, curing etc., complete
8Supplying and erecting centering shuttering including necessary supports for plane.
9RCC in M30 GRADE using graded of HBGs excluding cost of reinforcement,centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechancial vibrator, finishing, curing etc., complete
10Earth work excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD board officers. Hard stiff clay, block cotton,hard red earth shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B
11Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by TWAD Board officers.
12Supplying and erecting steel centering for sides and soffits I including necessary supports\" and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.
13Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete
14RCC in M30 GRADE using graded of HBGs excluding cost of reinforcement,centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechancial vibrator, finishing, curing etc., complete
15Refilling the foundation with excavated earth including watering and consolidation etc., complete.
16Supplying and erecting steel centering for sides and soffits I including necessary supports\" and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.
17RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete.
18Supplying and erecting steel centering for sides and soffits I including necessary supports\" and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.
19Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete
20RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete.
21Supplying and erecting steel centering for sides and soffits I including necessary supports\" and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.A) Square Column (3.02 - 3.30)
22B) Square Column (3.30 - 4.30)
23C) Square Column (4.30 - 5.30)
24D) Square Column (5.30 - 5.74)
25RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete.A) Square Column (3.02 - 3.30)
26A) Square Column (4.50 - 5.74)
27Supplying and erecting steel centering for sides and soffits I including necessary supports\" and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.
28Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete
29RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete.
30Supplying and erecting steel centering for sides and soffits I including necessary supports\" and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.A) Square Column (6.04 - 6.30)
31B) Square Column (6.30- 7.30)
32C) Square Column (7.30-8.30)
33D) Square Column (8.30-8.76)
34RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete.
35Supplying and erecting steel centering for sides and soffits I including necessary supports\" and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.
36Supplying and erecting centering shuttering including necessary supports for plane
37RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete.A) Third brace beam (8.76-9.06)
38B) Third brace beam (9.00-9.06)
39Supplying and erecting steel centering for sides and soffits I including necessary supports\" and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.Third Brace Beam Top to Floor (Grid) Beam Bottom (9.06 - 11.31) Square Column (9.06 - 9.30)
40Square Column (9.30 -10.30)
41Square Column (10.30-11.30)
42Square Column (11.30-11.31)
43RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete.Column From Third Brace beam Top to Floor (Grid) Beam Bottom (9.06 - 11.31)
44Supplying and erecting steel centering for sides and soffits I including necessary supports\" and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.Floor grid beam (11.31-11.61)
45floor slab
46floor slab side(curved surface)
47Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete
48RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete.
49FLOOR / GRID BEAM AND FLOOR SLAB LAID Supplying and erecting steel centering for sides and soffits I including necessary supports\" and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete. A) Curv. Surface haunch (slanding)
50B) Curv. Surface Tank Side wall inner (12.30-13.30)
51C) Curv. Surface Tank Side wall inner (13.30-14.30)
52D) Curv. Surface Tank Side wall inner (14.30-14.75)
53RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete.RCC rate (11.85-13.50)
54RCC rate (13.50-14.75)
55Supplying and erecting steel centering for sides and soffits I including necessary supports\" and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete. Cover Slab Bottom (14.75-14.75)
56Tank cover slab side wall (curved) (14.75-14.93)
57Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete
58RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete.
59Providing PVC ventilating arrangements mosquito proof nylon net with 110 mm PVC pipes and cowl etc., complete.,
60Providing manhole cover of size 0.60 m X 0.60 m in RCC 1: 1.5:3 with suitable reinforcement and 5O x 5O x 6mm MS angle fixed along edges etc., complete.,
61Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (one cement, one and half sand and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete curing etc., to required height and clear width of 4Scm consisting of two Nos. of ve~ical post of 10cm x lScm and step slab of 25mm x 25mm etc., complete.
62Fabrication, supply, delivery and fixing of outside MS Ladder of 45cm clear wide made out of 50 mm x 50 mm x 60 mm MS angle for both sides and for steps at 30 cm C/C welded jointed etc., for I staging from GL to Fst level brace (weight 4.5kg/m) Iind and IIIrd staging upto floor slab and IVth staging from floor slab to roof top. Supply, delivery and fixing of 32 mm GI pipes medium for hand rails from I stage to IVth stage. RCC M30 Grade mix for Landing slab 5 nos. at Ground Level - 1 No. and abouve Ground Level - 4 Nos. Supply and fixing of 32 mm GI pipe medium for hand rails for the Landing slab. Supplying and fixing of MS base plate of 100 mm x 100mm x 6 mm thick for fixing Anchore fastener bolt for fixing of hand rails at Landing Slab and MS Ladder providing locking arrangements with two coats of approved enamel paint over one coat of red oxide paint as per approved Type Design and as directed by TWAD board officers.
63Providing cut stone slab in CM 1:3 etc., complete.,(.45x.45x.15)
64Exterior Emulsion Paint two coats with approved exterior emulsion paint over one coat of priming coat over cement plastered exposed surface of the Reservoir including cleaning, preparing the surface and curing etc., complete.
6565mm dia GI pipes for inlet connection
6665mm dia GI pipes for over flow and RWH
6765mm dia GI pipes for delivery pipe.
6850mm dia GI pipes for scour pipe.
6990mmx80mm dia PVC Threaded coupler
7063mm x 40mm dia PVC Threaded coupler
7165mm dia GI Tee
7265mm dia 90 bend
7365mm dia GI bend
7465mm dia GI coupler
7565mm dia GI union
7665mm dia GI elbow
7750mm dia GI union
7850mm dia GI Elbow
7965mm dia GI Tee
8065x50mm dia GI Reducer
8175x63mm dia pvc Reducer
8275x90mm dia pvc Reducer
8365 mmGM Gate valve
8450 mmGM Gate valve
8575mm PVC Threaded coupler
8663 mm PVC Pipe
87Earth work excavation in all classes of soils for lincluding labour charges only as per SS 20B.
88provision for hand rails top Tank
89Provision forWater meter
90Provision for Dirt Box
91Provision for erection charges
92Earth work excavation in all classes of soils for lincluding labour charges only as per SS 20B.\" platform for OHT
93Cement concrete (1:4:8) mix using 40mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc. complete as per standard specification.
94Brick work using country brick 83/4x41/4x23/4 in cement motor 1:5 including completed
95Cement concrete (1:2:4) mix using 20mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc. complete as per standard specification.
96Provision for Rain water Rcc Rings
97Provision for name board chrges
98GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 52642472
AUTHORITY Local Bodies
TENDER VALUE Ref. Documents
LAST DATE 09-12-2025
Authority
Authority Name Rural Development And Panchayats Department
Work Description Tender For Construction Of New Oht 30000 Lit At In Kanakiliyanalllur Panchayat
Basic Detail
Tender No A2/2780/2025
Bidding Type Tender
Location
City pullambadi
State Tamil Nadu
Key Dates
Publish Date 28 Nov 2025
Submission Date 09 Dec 2025
Open Date 09 Dec 2025
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 19710
Exemption Not Available
Document List
BOQ_750047.xls
f6c490d1-7a4c-4b5d-9ba6-781a538de898.html
PriceBid.pdf
TechnicalBid.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 28, 2025
11:30 IST

Tender Published

Tender notice published.

Completed
Dec 09, 2025
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Dec 09, 2025

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
xls

BOQ_750047.xls

html

f6c490d1-7a4c-4b5d-9ba6-781a538de898.html

pdf

PriceBid.pdf

pdf

TechnicalBid.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders