| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m lead and lift up to 1.5 m,disposed soil to be levelled and neatly dressed, All kinds of soil. |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including dressing of sides and ramming of bottom disposal of excavated earth, lead up to 50m and lift up to 1.5m, disposed earth to be levelled and neatly dressed. (No extra lift is payable if work is done by mechanical means). All kinds of soil. |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level :M-10Nominal (Mix-1 Cement : 3 sand : 6 graded stone aggregate ). |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level :M-15 – Grade concrete. |
| 5 | Filling available excavated earth (excluding hard rock/Ordinary rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. |
| 6 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in- Charge). |
| 7 | Supplying and filling in plinth under floors including watering ramming consolidating in layers not exceeding 20cm in depth and dressing complete.Supplying and filing in plinth with soil (other then BC soil ) having MDD not less than 1.85 t/m3 under floors including watering, ramming and compacting (minimum compaction 95% of MDD) in layers not exceeding 15cm depth and dressing complete. |
| 8 | Providing and laying factory made machine pressed precast cement concrete interlocking paver block of any shape and size conforming to IS:15658- 2006 and ISI marked of 60 mm thickness, M-30 grade with grey cement and pigment all as specified. Made by block making machine with strong vibratory compaction, laid in required colour and pattern over and including 50mm thick compacted bed of stone dust, filling the joints with sand etc. all complete as per the direction of Engineer-in-Charge. |
| 9 | Floor painting with floor enamel paint of approved brand and manufacture of required colour to give an even shade: Two or more coats on new work. |
| 10 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: Two or more coats onnew work. |
| 11 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding including cost of bindingwire all wastages and overlaps, couplers (overlaps shall be provided as per requirement of IS 13920 for ductile detalingIS 456 RCC Design & SP 34 Reinforcement detailing ) etc. complete .(Note:-1. Spacer bars (chairs) shall be paid separately as shown in the drawing and as per direction of engineer in charge.2. No extra payment shall be done for overlaps and/or couplers.3.Couplers shall be conforming to IS code on “Reinforcement Couplers for Mechanical Splices of Bars for Concrete Reinforcement - Specification”). Cold twisted bars (CTD) |
| 12 | Providing and laying in position specified grade of reinforced cement concrete(nominal / design mix with 20mm nominal size graded stone aggregate) excluding thecost of centering,shuttering, finishing and reinforcement -All work up to plinth level :M-20 Grade Concrete. |