Tender For Sbm -Ii Slwm At Bhamburdi Tal Malshiras - Waste water management under Swachh Bharat Mission Gramin (Phase 2) at Bhamburdi - Sub Work No 1 Leach Pit- Item No1:-Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete 2 Item No 2:-Providing Dry trap /granigt/quartizite/gneisses rubble stone Soiling in 15cm to 20 cm thicknlayers including hand packing and compacting etc 3 Item No 3:-Providing and laying in situ, following M10(1:3:6) grades of C.C.of trap / granite/ quartzite/ gneiss metal for foundation and bedding including dewatering, formwork, compacting and curing, finishing, etc. complete. 4 Item No.4 :- Providing second class Burnt Brick masonry with conventional / I.S.type bricks in cement mortar 1:6 in plinth as backing in composite masonry including bailing out water manually, striking joints, raking out joints and watering etc Complete. 5 Item No 5:-Providing and casting insitu C.C. of trap / granite / quartzite / gneiss metal of approved quality for RCC work as per detailed drawings and designs or as directed by Engineer-in-charge including normal dewatering, centering, plywood formwork, bully / steel prop-ups, compaction, finishing the formed surfaces with CM 1:3 of sufficient minimum thickness to givea smoot hand even surface wherever necessary or roughening if special finish is to be provided and curing,etc. complete. (By weigh batching and mix design for M-250 and M- 300 only. Use of L & T, A.C.C., Ambuja, Birla Gold, Manikgad,Rajashree,etc.cement is permitted) (excluding M.S,or Tor reinforcement) 6 Item No 6:-Providing internal cement plaster of 12mm thik chamber single coat in cement mortor 1:4 without nerru plaster finish to concrete or brick surface in all position including scaffolding and curing etc completed. 7 Item No 7:-Providing and fixing in position steel bar reinforcement of various diameters for RCC piles, caps, footings, foundations, slabs, beams, columns, canopies, staircases. newels, chajjas, lintels, pardies, copings, fins, arches, etc.as per detailed designs, drawings and schedules; including cutting, bending, hooking thebars,binding with wires or tack welding and supporting as required,etc. complete (including cost of binding wire) IS 1786, (Bd-F-17/306) 8 Item No.8:- Providing, laying and fixing P.V.C.pipe of 110 mm dia.with fittings such as bends, tees, reducers, clamps, etc.including necessary excavation, trench filling etc.complete. Includin gremoving existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete 9 Item No 8-10% Special Item For PVC Pipe 10 Item No.9:-Providing and fixing 20 to 25 mm thick rough shahabad box type waterproofing for base ment orunder ground floor on a base of Cement concrete 1:3:6, including subbase of 2.50 centimeter thick Cementmortar 1:3 with conceal,secrete(RMW),Algae proofor other a like waterproofing liquids,raking of joints upto 35mm depth,filling the joints with 6mm size crushed metal,hand grouting with cement slurry,curing and cleaning,with 7 year sguaran tee on courtfee stamp of Rs.100/-with ponding test etc complete. (excluding Cement concrete1:3:6 base concrete ) 11 Sub Work No 2 Dewats- For Anarobic Baffled Reactor- Item No1:-Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete 12 Item No 2:- Excavation for foundation / pipe trenches in Hard Murum including removing the excavated material upto a doistance of 50 m & lift as below stacking and sprading as directed dewatering shoring & struting preparing the bed for the foundation & neccesary back filling etc comp 13 Item No 3:- Excavation for foundation / pipe trenches in Hard Murum boulders including removing the excavated material upto a doistance of 50 m & lift as below stacking and sprading as directed dewatering shoring & struting preparing the bed for the foundation & neccesary back filling etc comp 14 Item No 4 :-Excavation for foundation / pipe trenches in Soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 m & lift as below stacking and sprading as directed dewatering shoring & struting preparing the bed for the foundation & neccesary back filling etc comp 15 Item No. 5- Providing and laying in situ Cement Concrete M-15 of trap/ granite / quartzite / gneiss metal for foundation and bedding including bailing out water,form work, compaction, curing, etc.complete (Cement 5.90 bags /cum) Spec. No. - Bd E /1 Page No. 287 and B- 7, Page No. 38 a) In PCC M-150 16 Item No. 6-Providing and casting in situ C.C. of trap / granite/ quartzite / gneiss metal of approved quality for RCC works as per detailed drawings and designs or as directed by Engineer-in-charge including normal dewatering, centering, form work, compaction, finishing the formed surfaces with C.M. 1:3 of sufficient minimum thickness to give a smooth and even surface wherever necessary or roughening if special finish is to be provided and curing, etc. complete. (By weigh batching and mix design for M-250 and M- 300 only. Use of L&T, A.C.C., Ambuja, Birla Gold, Manikgad, Rajashree, etc. cement is permitted.) (Excluding M.S. or Tor reinforcement) M-250 17 Item No 7:-Providing and fixing in position steel bar reinforcement of various diameters for RCC piles, caps, footings, foundations, slabs, beams, columns, canopies, staircases. newels, chajjas, lintels, pardies, copings, fins, arches, etc.as per detailed designs, drawings and schedules; including cutting, bending, hooking thebars,binding with wires or tack welding and supporting as required,etc. complete (including cost of binding wire) IS 1786, (Bd-F-17/306) 18 Item No.8- Supplying, filling, spreading & leveling stone boulders of size range 5cm to 20cm in recharge pit, in the required thickness, for all leads & lifts, all complete as per the direction of Engineer in-charge 19 Item No 9:- Supplying, filling, spreading & leveling gravels of size range 5mm to 10mm, in the recharge pit, over the existing layer of boulders, in required thickness, for all leads & lifts, all complete as per direction of Engineer incharge 20 For Root Zone Treatment -Item No1:- Excavation for foundation / pipe trenches in earth ,soils of all types sand, gravel & soft murum including removing the excavated material upto a distance of 50 m & lift as below stacking and sprading as directed dewatering shoring & struting preparing the bed for the foundation &neccesary back filling etc 21 Item No 2:- Excavation for foundation / pipe trenches in Hard Murum including removing the excavated material upto a doistance of 50 m & lift as below stacking and sprading as directed dewatering shoring & struting preparing the bed for the foundation & neccesary back filling etc 22 Item No 3:- Excavation for foundation / pipe trenches in Hard Murum boulders including removing the excavated material upto a doistance of 50 m & lift as below stacking and sprading as directed dewatering shoring & struting preparing the bed for the foundation & neccesary back filling etc 23 Item No 4 :-Excavation for foundation / pipe trenches in Soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 m & lift as below stacking and sprading as directed dewatering shoring & struting preparing the bed for the foundation & neccesary back filling etc 24 Item No. 5- Providing and laying in situ Cement Concrete M-15 of trap/ granite / quartzite / gneiss metal for foundation and bedding including bailing out water,form work, compaction, curing, etc.complete (Cement 5.90 bags /cum) Spec. No. - Bd E /1 Page No. 287 and B- 7, Page No. 38 a) In PCC M-150 25 Item No. 6-Providing and casting in situ C.C. of trap / granite/ quartzite / gneiss metal of approved quality for RCC works as per detailed drawings and designs or as directed by Engineer-in-charge including normal dewatering, centering, form work, compaction, finishing the formed surfaces with C.M. 1:3 of sufficient minimum thickness to give a smooth and even surface wherever necessary or roughening if special finish is to be provided and curing, etc. complete. (By weigh batching and mix design for M-250 and M- 300 only. Use of L&T, A.C.C., Ambuja, Birla Gold, Manikgad, Rajashree, etc. cement is permitted.) (Excluding M.S. or Tor reinforcement) M-250 26 Item No.7- Providing and fixing in position steel bar reinforcement of various diameters for RCC piles, caps, footings, foundations,slabs, beams, columns, canopies, staircases, newels, chajjas, lintels, pardies, copings, fins, arches,etc. as per detailed designs, drawings and schedules; including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required, etc. complete (including cost of binding wire). (Bd-F 17/306) Tor steel 27 Item No.8- Supplying, filling, spreading & leveling stone boulders of size range 5cm to 20cm in recharge pit, in the required thickness, for all leads & lifts, all complete as per the direction of Engineer in-charge 28 Item No 9:- Supplying, filling, spreading & leveling gravels of size range 5mm to 10mm, in the recharge pit, over the existing layer of boulders, in required thickness, for all leads & lifts, all complete as per direction of Engineer incharge 29 Add GST Please Enable Macros to View BoQ information