| 1 | Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc.), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge. |
| 2 | a) 63mm |
| 3 | b) 90mm |
| 4 | C) 110mm |
| 5 | D) 160mm |
| 6 | Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc.), all tools / accessories, labour, transportation, valve danger lighting, guarding etc. complete as per the operations, traffic management, providing barricading, direction of engineer incharge. |
| 7 | I) Repairs to PVC pipeline, |
| 8 | Outer dia. in mm, |
| 9 | a) 225 mm dia |
| 10 | Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc.), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge. |
| 11 | I) Repairs to A.C pipeline |
| 12 | Outer Dia in mm |
| 13 | a) 80mm dia |
| 14 | b) 100mm dia |
| 15 | c) 150mm dia |
| 16 | Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc.), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge. |
| 17 | I) Repairs to A.C pipeline |
| 18 | Nominal Dia in mm |
| 19 | a) 200mm dia |
| 20 | b) 250mm dia |
| 21 | c) 300mm dia |
| 22 | Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc.), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge. |
| 23 | I) Repairs to D.I / C.I pipeline |
| 24 | a) 100mm |
| 25 | b) 150mm |
| 26 | c) 200mm |
| 27 | d) 250mm |
| 28 | e) 300mm |
| 29 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. |
| 30 | Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering shuttering and finishing. |
| 31 | a) All works upto plinth level |
| 32 | Hire charges of machineries and tools required for attending leakages/ breakdown. |
| 33 | a) JCB Excavator |
| 34 | Pump for pumping water continously |
| 35 | Hiring of electrical / diesel breaker for cutting bituminous roads, concrete and hard surface including operator for breaker, electrical wire etc. complete with all safety measures as directed by Engineer in charge. Please Enable Macros to View BoQ information |