| 1 | Excavation in foundation in ordinary soil (Loam,Clay or Sand) including lift upto 1.5 m lead upto 30m and including filling watering and ramming of excavated earth into the tranches or into the space between the building & the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as direction by the /I. upto a distance of 30M from the foundation trenches. (where achine can not reach/move). For building work only. (PWD SI No-251)/2022 |
| 2 | Concrete with 4cm. gauge stone ballast, coarse sand and cement in proportion of 8:4:1 in foundation and under foors including supply of all material, labour, T&P etc. required for proper completion of the work. ( S.I NO. 281/CH-5/2022 |
| 3 | P/L nonpressure NP2 class 250mm dia R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of (1:2):/19.6.3/ DSR 2023 |
| 4 | Constructing masonry Chamber 90x90x100 cm inside, in brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for sluice valve, with C.I. surface box 100 mm top diameter, 160 mm bottom diameter and 180 mm deep (inside) with chained lid and RCC top slab 1:1.5:3 mix (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size), including necessary excavation, foundation concrete 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size ) and inside plastering with cement mortar 1:3 (1 cement : 3 coarse sand) 12 mm thick, finished with a floating coat of neat cement complete as per standard design : 18.34.1 With common burnt clay F.P.S.(non modular) bricks of class designation 7.5 DSR 2023 |
| 5 | Supply and laying 110mm internal dia P.V.C. pipe of 10kg/sqcm pressure and Finolex or Jindal make complete and including supply of all materials, labour and T&P etc. required for proper completion of the work. PSR as per C.B.No. 2409/2016 |
| 6 | Mild steel (Tor steel or plain) or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised overlapping shall be measured up to floor two level . (PWD S.I No- 504) |
| 7 | Providing and fixing in position pre-cast R.C.C. manhole cover and frame of equired shape and approved quality Circular shape 560 mm internal dia 19.19.4.1/2022 |
| 8 | RCC work with cement approved coarse sand and 2cm (3/4\")gauge approved stone ballast in the proportion 1:1½:3 in slabs including necessary centering & shuttering excluding supply of reinforcement and its bending the same with 24 BWG GI binding wire and necessary centering & shuttering excluding supply of reinforcement and complete. ( S.I NO. 284(a) CH-5)/2022 |
| 9 | Providing and laying in cement concrete in 8:4:1 ( brick ballast 8 (40 mm nominal size) : 4 approved coarse sand : 1 cement and curing complete, including cost of formwork in foundation. (PWD S.I No- 275/2022) |
| 10 | M-150 brick work in 1:4 (one cement and four coarse sand of 2.25 F.M. mortar) in foundation and including supply of all material and T &P etc. required for proper completion of work. (S.I. 307A) |
| 11 | Class-150 brick work in 1:4 (1 cement : 4 coarse sand ) in for 230 mm thick wall including supply of all material, labour, T&P etc. required for proper completion of work . (PWD S.I No. 307a +309 +310) IN super strcure |
| 12 | Cement Concrete with 2cm. guage approved stone ballast coarse sand and cement in proportion of 4:2:1 including supply of all materials, labour and T&P etc. required for proper completion of work.SI NO 279/SOR/2022 |
| 13 | 12 mm. thick plaster with 1 : 4 (one part cement & Four parts of coarse sand of 2.75 F.M.) over brick work minimum thickness not to be less than 1 cms. Including supply of all material , labour , T & P etc. required for proper completion of the work. ( S.I.No.584) |
| 14 | Finishing walls with superior quality water proof cement paint/snowcem of approved make and quality of new work with three coats to give even shade including preparing surface by the thoroughly cleaning and sand preparing and supply of all materials, labour and T&P etc.required for proper completion of the work. SI.No.(660& 661) 2022 Please Enable Macros to View BoQ information |