}

Tender For Execution Of Contract For Extension Of Supply Works, Capital, Improvement & Dcw Works In Respect Of Kallidaikurichisection / Kallidaikurichi Sub Division / Kallidaikurichi Division / Tirunelveli Edc, Tirunelveli-Tamil Nadu

Tender Notice

52603597
Tender For Execution Of Contract For Extension Of Supply Works, Capital, Improvement & Dcw Works In Respect Of Kallidaikurichisection / Kallidaikurichi Sub Division / Kallidaikurichi Division / Tirunelveli Edc
Tender
Indian
Tamil Nadu
Tirunelveli
15-12-2025

Tender Details

Tender for Execution Of Contract For Extension Of Supply Works, Capital, Improvement & Dcw Works In Respect Of Kallidaikurichisection / Kallidaikurichi Sub Division / Kallidaikurichi Division / Tirunelveli Edc-- 1 Normal ground- Excavation of Pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles 2 Normal ground- Erection of 7.32m, 7.5m, 8m, 8.23m poles 3 Rocky ground- Excavation of Pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles 4 Rocky ground- Erection of 7.32m, 7.5m, 8m, 8.23m poles 5 Normal ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M & 9.14M poles 6 Normal ground- Erection of 9M & 9.14M poles 7 Rocky ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M & 9.14M poles 8 Rocky ground- Erection of 9M & 9.14M poles 9 Transporting of poles from road side to pole pit - 7.32m, 7.5m, 8m, 8.23m RCC pole 10 Transporting of poles from road side to pole pit - 9m, 9.14m RCC/PSC pole 11 Loading and Unloading of poles - 7.32m, 7.5m, 8m, 8.23m RCC pole 12 Loading and Unloading of poles - 9m, 9.14m RCC/PSC pole 13 Loading & unloading of RSJ pole 36 14 Transporting of RSJ pole 36 15 Excavation & erection of RSJ pole 36 16 Loading and Unloading of Line Materials 17 Concreting of poles as per Board Standards (2*2*5). The material such as cement, sand, jelly, etc., have to be supplied by the contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing Transporting of sant,jally,from box and water curing for 14 days etc,.) 18 Coping of pole (0.6m*0.6m*0.35m) 19 Concreting of stay (o.3m * 0.3m * 1.5m) including materials except cement 20 Coil earthing per pole & pole earthing 21 Normal ground- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set) 22 Normal ground- Erection of stay set 23 Rocky ground- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set) 24 Rocky ground- Erection of stay set 25 Fixing of V & Channel cross arm 3.5 including transporting of materials from road side to site 26 Fixing of LT 3Phase cross arm including transporting of materials from road side to site 27 Fixing of LT 1Phase cross arm including transporting of materials from road side to site 28 Fixing of HT LT TI fitting including transporting of materials from road side to site 29 Erection of HT Side arm with stud including transporting of materials from road side to site 30 Erection of LT Side arm with stud including transporting of materials from road side to site 31 Fixing of insulator (per location) including transporting of materials from road side to site 32 Fixing of Tapping channel X arm 33 Fixing of 11 KV Strain Disc 34 HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/2.59 ACSR (1Span/Wire) 35 HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/3.35 ACSR (1Span/Wire) 36 For HT line clear works for For 7/2.59 ACSR (1Span/Wire) 37 For HT line clear works for For 7/3.35 ACSR (1Span/Wire) 38 LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/2.59 ACSR 39 LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/3.35 ACSR 40 For LT line clear works for For 7/2.59 ACSR (1Span/Wire) 41 For LT line clear works for For 7/3.35 ACSR (1Span/Wire) 42 Erection of transformer/dismantling upto 200KVA 43 Erection of transformer/dismantling 250KVA 44 Erection of DT tmeter 45 Erection of feeder cable with open type fuse unit per feeder and for each addl feeder 46 Erection of feeder cable with open type fuse unit - for each addl feeder 47 Erection of feeder cable -Bus bar arrangement with open type 48 Loading & unloading of Distribution transformer below 250KVA 49 Loading & unloading of Distribution transformer250KVA 50 Alteration of clamps 51 Drilling less than 23mm holes per hole/slatted hole 52 Cutting of channel 53 Cutting of Flat 54 Cutting of Angle 55 LT-Changing of pin point to cut point 56 HT-Changing of pin point to cut point 57 Dismantling of deteriorated poles with concrete in damaged condition including grill separation etc., 58 Dismantling of poles without concrete in damaged condition including grill separation etc., 59 Providing jumpering at cut point 60 Tree clearence in HT or LT location- For ordy. Tree clearence and Throng bushes & trees 400/head/day 61 Tree clearence in HT or LT location- For coconut trees and Palmrah trees 500/head/day 62 Erection of Distribution Transformer structure complete as per TNEB standard including painting, feeders arrangrment, colour washing of RCC poles etc.. Fixing of poles type to be unit HT / LT LAS and jumpering 3 Nos Earth pits with earth trough except erection of Distribution Transformer. 63 Erection of 11 KV single pole Structure including erection of DT complete as per TNEB standard including painting, feeders arrangrment, colour washing of RCC poles etc.. Fixing of poles type to be unit HT / LT LAS and jumpering 3 Nos Earth pits with earth trough except erection of Distribution Transformer. 64 Erection of tapping structure 65 Dismantling of stay set complete including stay rod 66 Dismantling of stay set complete Without stay rod 67 Dismantling of conductor of7/2.59 including transporting the conductors to the nearest road side and stocking in coils 68 Dismantling of conductor7/3.35 including transporting the conductors to the nearest road side and stocking in coils 69 Dismantling of Transformer structure materials complete set and transporting the same from the location to the road side 70 Resagging of 7/2.59 ACSR conductor 71 Resagging of 7/3.15 ACSR conductor 72 Dismantling of V Cross arm 73 Dismantling of 3 phase X Arm 74 Dismantling of Single phase X arm 75 Dismantling of HT/LT TI Fitting 76 Dismantling of HT pin Insulators 77 Dismantling of LT pin Insulators 78 Dismantling of Strain Disc 79 Hiring of JCB 80 Hiring of Crane 81 Exceeding 1 Hour for every hour 82 Transporting of Charges of DT / Line materials using private vehicle upto 20 KM( Up and Down) 83 Beyond 20 KM for every KM 84 Maintenance of Distribution Transformer-Providing of U jumpering

Key Value

Document Fees
Refer document
Tender Value
Refer document

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail