Supply, Installation, Testing And Commissioning Of Hp Air Compressor Of Capacity 450 Bar For The Project Administrative And Logistic Infrastructure Including Schools, Hospitals, Auditorium And Sports Facilities At Aob(Rambilli) , Supply, Installation, Testing And Commissioning Of Hp Air Compressor System As Indicated In Part –Ii Of Ca Consists Of The Following:- , Hp Air Compressor , Ac Motor With Motor Control Unit , Plc Based Control Panel & Instrumentation , Bottle Bank (8 Air Bottles X 200 Ltr) , Hp Air Dryer , 03 Reducing Stations Of 250, 100 And 45 Bar Respectively , Ss316 Piping (Approx 250M) With Associated Valves , Acoustic Canopy , All Other Items Associated With Main Equipment Which Are Mentioned Inpart –Ii Of Rfp. , Civil Work(Refers To Para 6 Of Part Ii Of Rfp) , Standard Accessories (Refers To Para 14 Of Part Ii Of Rfp) , Technical Literature / Certificates / Documentation (Refers To Para 16 Of Part Ii Of Rfp) , Installation, Acceptance, Tests, Trails And Commissioning Charges (Refers To Para 17 Of Part Ii Of Rfp) , Training(Refers To Para 20 Of Part Ii Of Rfp) , Any Other Item Such As Transportation, Insurance, Freight, Packing Etc., , Notes: 1. Cost Of Item Listed At Sl 1.01 To 1.09 And 6 (If Applicable) Are To Be Quotedin The Respective Rows Of The Price Bid Sheet. 2. Bidder Not Permitted To Include Cost Of Items Listed At Sl 2 To 7 With Sl 1.01 To 1.09 As Lumpsum Amount. 3. Bidder Required To Mandatorily Quote For Sl 1.01 To 1.09 And 6 Failing Which Bid Shall Be Treated As Non Bonafied And Liable For Rejection. 4. Any Clarifications Contact To So1(Gp-1) (Phone No. 7904759367 And Email
[email protected]) 5. Bidders Are Mandatorily To Quote Gst/ Taxes As Applicable Against Each Serials, Falling Which Bid Shall Be Treated As Non Bonafied And Liable For Rejection.