Electrical Panel: This includes the electrical panel with necessary electrical components such as circuit breakers, relays, contactors, and PLC or other control systems.
3
Components: Power supply units, control switches, wiring, terminals, and other necessary hardware.Electrical panel drawings and list of material of existing system will be provided for your reference.
4
Installation of panel
5
Panel Mounting: Removal of the old panel and installation of the new electrical panel at its location.
6
Wiring: Connection of the panel to the power source and integration with the hoist system.
7
Integration: Connection of the panel to the trash rack cleaning machine\"s hoist system, including any sensors, actuators, or control devices required for operation.
8
Testing of TRCM
9
Functional Testing: Verifying that all components within the panel are operating correctly, including checking the control signals, power distribution, and safety features.
10
System Integration Testing: Ensuring that the panel communicates properly with the hoist system and that the trash rack cleaning machine operates as intended.
11
Removal of old dismantled panels/equipments, components and its transportation from site to the divisional store Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.