| 1 | Excavation in foundation in ordinary soil ( Loam clay or sand) including lift up to 1.5 meter (5ft) and lead upto 30m (100ft) and including filling,watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as direction by the Engineer-in-charge upto a distance of 30m(100ft) from the foundation trenches. |
| 2 | Stone dust/local sand filling in plinth including supply of necessary quantity from the side of work & including watering, dressing etc. Rate to include cost of all materials, labour and tools & plants, etc. required for proper completion of the work. (as per S.I. No. 255) |
| 3 | Concrete with 4cm. (1½\") guage stone ballast, fine local sand of 1.25 F.M. and cement in proportion of 12: 6:1in foundations, including supply of all materials, labour and T&P etc. required for proper completion of the work (S.I.No. 273) |
| 4 | R.C.C. work with cement approved coarse sand and 2cm. (3/4\") gauge approved stone ballast in the proportion of 1:2:4 in lintels of doors and windows excluding s/o reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.I. wire. An including necessary cantreing and shuttring etc. and also including supply of all material, labour T&P etc. required for proper completion of the work. binding wire to be supplied by the contractor free of cost.(as per S.I. No. 283) |
| 5 | Same as above but R.C.C. for slabs (S.I. No. 284) |
| 6 | Same as above but R.C.C. in the lighter beams i.e. having spans upto 6 m (20\") (S.I. No. 285) |
| 7 | as in item no 283 above but in Rcc raft foundation and footing with 4 cm gauge approved stone ballast |
| 8 | As in item (283) above but in RCC columns in 1.1.5.3 (SI.No.289) |
| 9 | Random course Rubble massonary in 1:4 cement and fine sand mortar in foundation and plinth, including supply of all materials, labour & T&P etc. required for proper completion of the work. |
| 10 | Mild steel of iron in plain work such as reinforced concrete /brick work (when not including in over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage and hooks and authorised over lapping shall be measured. (as per S.I. No. 504) |
| 11 | 12 mm thick plaster on with mix 1:4brick work minimum thickness not less than 10 mm with cement and find sand of 1.25 fineness modules. (as per S.I. No. 580) |
| 12 | Finishing walls with water proof cement paint or approved make and quality on new work with two coats to give an even shade including supply of all material, labour T&P etc. required for proper completion of the work. (as per S.I. No. 660) |
| 13 | One priming coat and two coat of oil distemper on new work including supply of all material, labour and T&P etc. required for proper completion of the work. (as per S.I. No. 681) |
| 14 | Class-150 brick work in 1:4 cement and fine sand of 1.25 fineness modulus mortar in Super structure including supply of all materials, labour and tools and plants etc. Required for proper completion of the work. |
| 15 | Earth work in cutting or in embankment in ordinary soil,excavtion to be it the from of regular pits not exceeding 1/2 meter (20\"\") in depth earth work in embankment to be in 20cm (8\"\") layers including 1.5meter (5ft) lifts and 30m (100ft) lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks with in 30m (100ft) distance as directed by the Engineer-in-charge.(S.I. NO. 253) 1 km .extra cartage |
| 16 | Cement concrete with 2cm (1/2\"\") gauge approved stone ballast, approved coarse sand. cement in the proportion 4:2:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. |
| 17 | Supply & fixing of sign board size 4\"x3\" etc. required for proper completion of the work. Please Enable Macros to View BoQ information |