Construction Of Drain And Cc Road From Chandrapal Maurya House To Manoj Awasthi House In Mo. Kasbhara Takiya
Tender Overview
Project Description
Construction of drain and CC road from Chandrapal Maurya house to Manoj Awasthi house in Mo. Kasbhara Takiya Cleaning Of Drain & Road Up To Silt At Site With Disposal Of 60Mtr. Including Waste Making Diversion Etc....All Completion , Earth Work In Excavation In Foundation In Ordinary Soil I/C Lift 1.50 & Lead 30 Mtr Without Royality Etc.... All Completion As Per S.I No- 251 , Earth In Cutting Or Embankment In Ordinary Soil Excavation To Done From Regular Pits With Cortage 5 Km. Distance Without Royality Etc....All Completion As Per S.I No- 253 , Providing And Laying Cement Concreate With 1:6:12 (1 Cement, 6 Fine Sand, 12 Brick Ballast 40Mm Nominal Size Etc.....All Completion As Per S.I No- 273 , Class-150 Brick Work With 1:4 Cement & Coarse Sand Mortar Etc....All Completion As Per S.I No- 305 Drain , 12Mm Thick Plaster With Cement & C- Sand Mortor In 1:5 Including Supply Of All Material Labour Etc....All Completion As Per S.I No- 584(I) , Supply, Laying & Consolidation Of 22.4-53Mm Gauge Stone Ballast And Screening Material By Hand Rammer...All Completion , Supply And Providing Of 125 Micron Plastic Sheet Etc.....All Completion As Per S.I No- 19 , Providing And Laying In Cement Concrete 4:2:1 With 20Mm Stone Aggregate Coarse Sand And Cement Etc.....All Completion As Per S.I No- 279(I) , Making Contraction/Construction Joint In Cement Concrete With Cutter & Filling Joint With Bitumen Mixed In 1/3 Depth Of Cement Concrete Slab & Making 10Mm Wide Joint Will Be 10-12Mm Depth Including Cost Of All Material, Labour, T&P Etc. Required For Proper Completion Of Work. ( Rate Sanctioned By Se Red Bly.) C/C 3.00 Mtr. , Reinforced Cement Concrete Work With Cement Approved Coarse Sand And 2Cm.(3/4) Gauge Approved Stone Ballast In Proportion Of 1:1½:3 For Slab Works Etc....All Completion As Per S.I No- 284 (A) , M.S. Or Iron In Plain Work Such As Reinforced Cement Concrete I/C Bending For Proper Shape And I/C Supply Of Steel & Its Wastage, Bend, Hooks, And Authorized Overlapping Shall Be Measured And I/C Cost Of Binding Wire Etc.....All Completion As Per S.I No- 504. , Supply/Fixing Of Granite Stone Indication Board In Brick Masonary Padastal Etc....All Work Completion As Per Direction Of E/I/C , Add G.S.T @ 18%
BOQ
| Sl. No. | Item Description |
| 1 | Cleaning of drain & road up to silt at site with disposal of 60mtr. including waste making diversion etc....all comp. |
| 2 | Earth work in excavation in foundation in ordinary soil i/c lift 1.50 & lead 30 mtr without royality etc…. All comp. As Per S.I No- 251 |
| 3 | Earth in cutting or embankment in ordinary soil excavation to done from regular pits with cortage 5 km. distance without royality etc....all comp. As Per S.I No- 253 |
| 4 | P/L cement concreate with 1:6:12 (1 cement, 6 fine sand, 12 brick ballast 40mm nominal size etc.....all comp. As Per S.I No- 273 |
| 5 | Class-150 brick work with 1:4 cement & coarse sand mortar etc....all comp. As Per S.I No- 305 Drain |
| 6 | 12mm thick Plaster with cement & C- sand mortor in 1:5 including supply of all material labour etc....all comp. As Per S.I No- 584(i) |
| 7 | Supply, Laying & consolidation of 22.4-53mm gauge stone ballast and screening material by hand rammer…all comp. |
| 8 | Supply and providing of 125 micron plastic sheet etc.....all comp. As Per S.I No- 19 |
| 9 | P/L in cement concrete 4:2:1 with 20mm stone aggregate coarse sand and cement etc.....all comp. As Per S.I No- 279(i) |
| 10 | Making contraction/construction joint in C.C. with cutter & filling joint with Bitumen mixed in 1/3 depth of cc slab & making 10mm wide joint will be 10-12mm depth including cost of all material, labour, T&P etc. required for proper completion of work. ( Rate sanctioned by SE RED Bly.) C/C 3.00 Mtr. |
| 11 | R.C.C. Work with cement approved coarse sand and 2cm.(3/4\") gauge approved stone ballast in proportion of 1:1½:3 for slab works etc....all comp. As Per S.I No- 284 (A) |
| 12 | M.S. or iron in plain work such as R.C.C. i/c bending for proper shape and i/c supply of steel & its wastage, bend, hooks, and authorized overlapping shall be measured and i/c cost of binding wire etc.....all comp. As Per S.I No- 504. |
| 13 | S/F of granite stone indication board in brick masonary padastal etc....all work comp. As Per Direction Of E/I/C |
| 14 | ADD G.S.T @ 18% Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents