| 1 | Demolishing R.C.C. work by mechanical means and stockpiling at designated locations and disposal of dismantled materials up to a lead of 1 kilometre, stacking serviceable and unserviceable material separately including cutting reinforcement bars. |
| 2 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.: For thickness of tiles above 25 mm and up to 40 mm |
| 3 | Steel work welded in built-up sections/ framed work, including cutting, hoisting, fixing in position, and applying a priming coat of approved steel primer using structural steel, etc., as required. In gratings, frames, guard bars, ladders, railings, brackets, gates, plates, and similar works. |
| 4 | WATER PROOF PLASTER: Providing and laying water-proof cement plaster 20mm in two coat backing coat of 12mm thick in CM 1:3 and second coat 8mm thick in CM 1:3 finish including supplying and adding water proofing compound weight of cement at all floor levels for repair to chambers, manholes, water retaining structures, depressions in bath/WCS etc. in quantities as required at site including scaffolding, curing layer will be allowed to air cure for 4hours followed with water curing for 48 hours, hacking of concrete surface etc. complete all as directed by engineer-incharge (to maintain bone dry condition underneath for 10 yrs) The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipe sand masonry with polymer mixed slurry. (Rates also include disposing/taking away the debris outside the premises of ACTREC and disposing as per the statutory guidelines) |
| 5 | Providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge; for the following grades of concrete.: All works up to plinth level: Concrete of M25 grade with minimum cement content of 300 kg /cum. |
| 6 | Providing, laying, and fixing of heavy-duty Outdoor vitrified Matt/Antiskid finish tiles, which are a flawless blend of elegance and durability, maintaining all the vital parameters, namely surface hardness (Moh), breaking strength (Mor), Load load-bearing capacity. Thickness-14mm, water absorption less than 0.10%, size of tiles 600x600 mm, including providing 15-20mm thick 1:3 cement mortar for laying of tiles. |
| 7 | Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand): 25 mm thick sqm |
| 8 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications, including appropriate priming coat, preparation of surface, etc., complete.: On steel work |
| 9 | Disposal of building rubbish / malba / similar unserviceable, dismantled, or waste materials by mechanical means, including loading, transporting, and unloading to an approved municipal dumping ground or as approved by the In-charge, out of ACTREC campus premises for all leads, including all lifts involved. |