Work of removing the high tension line/LT line passing over the buildings/premises of council primary and upper primary schools under the area of Electricity Distribution Section-Kopaganj.-1 SUPPLY OF Following MATERIALS as per Resspo Drawing/ Norms. 2 STONE PAD 3 T-OFF CLAMP 4 HOLDING CLAMP TOP/DROPPER ANGLE 5 NUT & BOLT 6 DEAD END CLAMP WITH EYE HOOK 7 SUSPENSION CLAMP WITH EYE HOOK 8 DISTRIBUTION BOX CLAMP 9 F-BRACKET 10 CROSS ARM HOLDING CLAMP 11 LT SHACLE INSULATOR 12 LT CLAMP WITH NUT&BOLT 13 GUARDING CLAMP 14 Cartage, Erection, Feeting, Grouting and Laying of following fabricated structures as per Resspo Drawing/ Norms as per instructed by Concern Executive Engineer. 15 Shifting of LT/HT Line Passing over the P.S. Malpur Loharai. From Vita Pandar Station-Mau to the Primary School at Sub-Centre Kalal Malpur Lohrai, a formal or pe 17 From the Electricity Storage Station Maru to the Primary School at Sub-Centre Aryalakha Malpur Johrai, the single and single line passing through the school was relocated. Please send a message to the Principal, who will be pleased to inform you. 18 Other materials were brought and repaired from the Primary School at Rawat Aila Malpur Johrai to the Electricity Station. ( adu s üss to, front Y 06 match si world rate 69 To 18 According to Rakhya Nagwa, Gada Sapkar Tani then Badkar, with the commemorative material Sangat 5 Math Yovr Mall Doka Warne Var Varya 20 So what is Jitshar Chhata? The work of umphring, singing and binding by placing it on 15 PON 5 (or login to res). 21 According to Halo Nanak, the work of cementing the hardened cheeks. 22 According to Resna Nanak, the work of awing of people. 23 Rasvo naan hai. Toosh 2 Go to the first mill vikalm, go to Mukh B Vaati and Elarti Line. The output of the power grid was safely transported to the Power Gander Center, Mau, and completed in the afternoon. 24 Shifting of LT Line Passing over the Joint School 8 CPC line from Kudsar Power Gander Center to Pakendra Uilch Joint School, Guler was laid, loaded, and restored. 25 26 -4 lines were laid in the old and original form. The construction, loading, and unloading of the LT (LT) line passing through the State Government School, Kuhar. 27 Identify the 11th grade I hate sects on coga delion gate 23-4. Erecting, loading, and unloading of materials (A Road No. 01, Root Wire 35 sandy strip is or to, flame-fed cly seat or dry my ow Tul). 28 Work of making round 8 5 notices according to Respa Nanak. 29 Satir Nayak, Jamun, Guwahati About Mathay Pol - (or agriculture dies) The act of sowing, umphering, stringing and binding. 30 According to Spo Nanak, the act of concreting the rotten abuse. 31 The work of interpreting the words according to Reshyo Chanakta. 32 33 Bath according to Nanak # stat icon this 7 गुर्दन, group ut stead to asil 34 Shifting of LT Line Passing over the P.S. Kadwara to 5 Po helionia to conf good qu tu to d 36 SSR water supply issued from Tanyuka Vidyalaya, Kudsar, to the Primary School of Girls, Ugalendra Ailakh, has been provided to the Kandlar Old Agf Uld, 34 Mic Vyas and need o 37 Vibhoot Pandar Kendra Maths Sub-Centre Ailajs Primary School, Kalpas Chal, other Sscha B Vira on use is a no. cc 4918 19 Kadeet Uchar Singh Janai Gari Pradinkar Pin Insulator 090 like Arm Ord and Shuru 1 No)) before the financial party, always doing the work of mutual education 38 Satyo Nagwas Thunasar Kada Kitya Gate Cheeks on CSR Geyser Kandkar) commen Rigit 65 Piling 40 Rao. Its a big thing 42 Installation works including state cutting as per Respa Nagwa 43 Rasevo The National Highway and Light Ideas Authority of India (NWAI) have implemented a successful operation for the safe dismantling of the power grid along with the poles and ensuring safe loading and unloading of the output power grid to the Vidyut Maniyar Centre. Shifting of LT/HT Line Passing over the Joint School Badagaon 45 85 Lines from the Electricity Storage Centre to the Joint School of Patindra Aryalaya, Badagaon. The length of the PC0L sail should be measured by height and height. Het Hd 15 ml ago Vdla maal tatha vidal not crushed in the system/LTE transfer ARC 47 (3X50 1X35 1X16) SQ.MM. Kennels Sai Ilai and 000 There are so many villages. Vyanush Kata Bovtra was born anno tutiolio. Niti Patra from Bharat Samatva Scholastic Interests 49 50 ABC (3X50-1×35+1X16) SQ.MMARY as casten padiya &# According to Spo Nanak, many of the rituals of Pali were done. 51 Resvi Matril according to which Pono Vashe Asing Vatra व्यार्य! 52 Resvi Manji is. The act of applying kidi shūra: vāvas (समा British Shahit) on the forehead. 53 Restaurant Manji According to which the stay set is set including the food items. 54 Safely isolating the LT/LT line passing over the Joint School, Badagaon, as per RESPO standards, securing, separating, and unloading the output Gaggri to the Power Storage Center (M) 55 Shifting of LT/HT Line Passing over the PS Salempur 56 Loading, transporting, and unloading of G.P.C.C. poles from the Power Storage Center (M) to the Primary School, Salempur, Jamkendra-Tiraivakot. 57 To shift the HT/LT line passing from Vidyalaya Pahar Kendra Millet to Sapaychandra-Dhireyajot which is a high school in Salempur. Loading, transporting, and unloading ACSR Vessel Conductor. 58 Loading, transporting, and unloading of other materials from the Electricity Storage Center Gau to the Primary School Ralegpur of the Chiraiyakot substation. (2 Nos. Stay Sand, 10 Kg Stay Wire, 1 No. Earthing Rod, 2 Kg GI Wire, 00 Nos. Polygar Pin Insulator, 00 Nos. Cross Arm). 59 Digging a pit, tying all fittings, and erecting an 8.5 meter PCC pole with all the materials as per RESPO standards. 60 Laying wires (ACSR Vessel Conductor) on the poles erected as per RESPO standards, including jumpering, sagging, and binding. 61 Concreting of erected posts as per RESPO standards. 62 Earthing of poles as per RESPO standards. 63 64 Laying of rote concreting protection as per RESPO standards. Safely dismantling the HT/LT line, including poles, passing over the Primary School, Ralegpur, as per RESPO standards, and securing, loading, and unloading the material to the Electricity Storage Center, Gau. 65 Shifting of LT/HT Line Passing over the Composite School, Katghar Sanjar. 66 Loading, transporting, and unloading of 8.5g PCC material from the Electricity Storage Center, Mau, to the Composite School, Katghar Sanjar, Sub-Center, Chiraiyakot. 67 Installation, loading, and unloading of ACSR Vessel Conductor from the Electricity Storage Station Mau to the Composite School Katghar Sanjar in Upvalandra-Virayakot to shift the HT/LT line passing through the school. 68 Loading, loading, and unloading of other materials (stay rods 03, relay wire 15 kg, earthing sand 03 10, GI wire 1 carajipe, polymer pin insulator 00 10, cross arm 00) from the Electricity Storage Station Mau to the Composite School Katghar Sanjar in Substation Chiraiyakot. 69 Digging a pit, tying all fittings, and erecting an 8.5 G PCC beam with all materials as per RESPO standards. 70 The act of jumping, roging and kneading by laying a string on the forehead polo . There are 71 rape cases. 72 The values increase according to the response. Saurashtra and Bariya 73 74 Elevation work including stay set concreting as per RESPO standards. Safely dismantling and tightening the HT/LT line poles passing over the Composite School, Katghar Sanjar, as per RESPO standards, and safely loading and unloading the material to the Electricity Storage Center, Mau. 75 Shifting of HT/LT Line Passing over the P.S. Bhikhampur 76 77 Loading, bracing, and unloading of 8.5 G PCC poles from the Electricity Storage Center, Mau to the Primary School, Bhikhampur, Namakendra Chiraiyakot. 640 ACSR Pijal conductor Old and Young coming from Chiraiyazhot J Primary School Salempuj and Vampolit Vidyalaya Vpar Sanjar to sub-centre Chiraiykot Primary School Bhikhampur and LT/LT line passing through the school. Loading, picking and unloading work for transfer. 78 Electricity Storage Center Gauro Substation Chiraiyakot Primary School Bhikhapur Other SAMCHYA, NPA 1 (2 Iso 10 Slots Ane 19 Kg. Earthing Ratta 03 Nos., GI Wire 00 Kg., Polygar Pin Insulator 0 Nos.) 79 Digging a pit as per the repo scheme, installing all fittings, and laying a 8.5 meter free trench. thisisi paan chadha vi vage 80 81 82 Laying wires (ACS and electrical conductors) on poles erected according to RESPO standards, performing jaggering, sagging, and binding. Concreting of poles erected according to RESPO standards. Earthing of poles according to RESPO standards. 83 Installing of stay rot and concrete as per RESPO standards. 84 Safely removing and reinstalling the previously installed 10 kVA transformer and energizing it according to RESPO standards. 85 Safely dismantling the HT/LT line passing over the Primary School Bhikhampur, including the poles, according to RESPO standards, and safely loading and unloading the material to the Electricity Storage Center, Mau. 86 Shifting of LT/HT Line Passing over the Composite Vidyalaya Assi Bhawan. 87 Loading, transporting, and unloading of 11 Gitter ERATP poles from the Electricity Storage Center Mau to the Composite School Assi Bhawan at the Bhusuwa Substation. 88 Loading, transporting, and unloading of other materials from the Electricity Storage Center Mau to the Composite School Assi Bhawan at the Bhusuwa Substation. (00 Nos. Stay Rod, 00 Kg Stay Wire, 1 No. Earthing Rod, 01 No. GI Wire, 02 Kg Polymer Pin Insulator, 03 Nos. Cross Arm, 01 No. Guarding Angle, 04 Nos. GI Wire, 6 SWG 45 Kg, 10 EWS 21 Kg GI Wire) 89 Erection of 11 meter STP poles including all materials by digging pits, tying all fittings, as per RESPO standards. 90 Gardening of poles erected/pre-installed as per RESPO standards by laying GI wire, sagging, and binding. 91 Concreting of poles erected as per RESPO standards. 92 Earthing of poles as per RESPO standards. 93 Shifting of LT/HT Line Passing over the Composite School Mandusara Bujurg. 94 Loading, loading, and unloading of 8.5 meter PCC poles from the Electricity Gander Station-Mau to the Composite School Mandusara Bujurg at the Substation-Gusuwan. 95 Loading, laying, and rigging of ACSR Vessel Conductors from the Electricity Storage Center Gau to the Composite School Gandusara Bujurg at the Substation Bhuyuwan to shift the HT/LT line passing through the school. 96 Loading, loading, and unloading of other materials from the Electricity Gander Station-Mau to the Composite School Mandusara Bujurg at the Substation-Gusuwan. (Stay rod 00 No., Stay wire 00 Kg, Earthing rod 01 No., GI wire 02 Kg, Polymer gin insulator 00 No., Cross Ark 00 No.) 97 Erecting a 5 meter PCC pole with all materials by digging a pit, tying all fittings, and installing it as per RESPO standards. 98 Laying wire (ACSR Vessel Conductor) on the erected poles as per RESPO standards, then performing jumpering, sagging, and binding. 99 Confirming the erected poles as per RESPO standards. 100 Earthing the poles as per RESPO standards. 101 Safely dismantling the HT/LT line, including poles, passing over the Composite School, Mandusra Buzurg, as per RESPO standards, and safely loading and unloading the material to the Electricity Storage Center, Gau. 102 Shifting of LT/HT Line Passing over the Composite School, Akbarpur. 103 Loading, loading and unloading of 8.5 CPCC poles from the Electricity Storage Center, Mau, to the Composite School, Akbarpur, at the Hiranpur substation. 104 Loading, loading and unloading of other materials from the Electricity Gander Center, Mau, to the Composite School, Akbarpur, at the Hiranpur substation. (1 no. stay rod, 5 kg stay wire, 1 no. earthing rod, 2 kg GI wire, 00 no. polygar gin insulator, 00 no. cross arg) 105 Erecting a 5 meter PCC pole with all materials, after digging a pit and tying all fittings as per RESPO standards. 106 21 11-11 Cosmic Current Affairs 380 1 107 Installation of rotary set printing and marking work as per the relevant standards. 108 Safely dismantling the poles installed in the premises of Composite School Akbarpur as per the relevant standards. 109 Shifting of LT/HT Line Passing over the Composite School Kajha-2. 110 Loading, loading and unloading of M.C.U.S.I. poles in the figure must be done for more than 10 days. 111 112 Rotary work to shift the Evati and Elhati lines passing through the Composite School of Hiranpur, Substation, Mau, from the Electricity Storage Station to the Composite School of Hiranpur, Katra, Katra, 2nd, and other materials. (Stay Send 04 Nos. Stay Wire 20 Any te yoice is ma 64 811 111 116, 144 india, in via to 10 A 114 14 Navin asily and ce 10, an ice 4�ી હિત 2 10 Channel 01 No.), Base Angle 07 G. Tee of Chagel 04 No. Guarding Angle 05 No. GI Market 6 SWL 80 No. GI Car 10 SWG: 40 SGG 113 Work of erecting 8.15 new PCC poles along with all materials, loading the pit as per planting standards and tying all fittings. 114 Fitting of the chariot with all the accessories inside the pit as per the standard. 15 No. folios. 115 Laying of wire (90 C.S. Tharu Vessel Conductor) on the paved pillars as per the standard. Jumpering, fitting, and bonding. 116 The work of girding by laying reprieve wire, megging and binding was done on the newly exposed / previously affected areas. 117 View of the crop lining of the sphere erected as per Utgo standard. 118 211 1111 is Thursday So as per the standard the stay should be installed along with connecting rods. 119 120 In accordance with the Response Standard, the 63 NVA transformers suspended in the premises of Composite School, Katra 2, have been secured and the Kamal Gol Gar transformer installed at the new location has been relocated to the existing one. 121 In accordance with the Response Standard, the HT and ELAT lines passing over Composite School, Katra 2, have been relocated. The line, without poles, was securely fastened with a cemented cable to the electrical system and the electrical system was installed at all. 122 Shifting of LT/HT Line Passing over the PS Dandi. 123 A 1.5 meter line was laid from the Power Storage Station in Mau to the Primary School in Lapkendra Sari. Battle of Visikreet Pole Karma of loading and unloading 124 Vidyut Madar is a fairy who is studying under Swamitra Vidyalaya. The work of loading, gathering and sorting of A.S.A. Weasel Consultant for shifting the passing HT and LT lines. 125 feet worth is the work of loading, unloading and lifting of materials. (Stay Road 01 No. Sea Wire 20 KG), Awing Road (4 No. GI Wire 18 KG Polymer without insulator 08 No. Croura Arg 00 No. Disc insulator fitting free Tough Channel N/A Dragger Land of a de fitne 10 c 33 vi-1 00 10 21121 101 00 10 Aca Wire SWG 00 KG GI Water 10 SWnet 00 KG) 126 117 Nivear Vidla slams ૫ બ્રિટિશ યકલ The work of digging a pit, tying the fittings, and constructing a 1.15m double-sided trench with all the necessary materials as per the Relmo standard. 127 Work of digging a pit, tying the fittings, and constructing a 1.15m double-sided trench with all the necessary materials. 128 Work of renaming the 1.1g sand dune with 11p sand dune, including the work of chirping, sagging, and fencing. 129 Charge of cutting the poles erected as per the Resgo standard. 130 Swami Manaskar said that the police should not be allowed to operate a vehicle. 131 132 The cost of installing rotary rotary connecting rods as per the National Standard. Installing a circular power transformer by securing the 23rd (Connecting) booklet located in the premises of the Primary School, Dadri, as per the National Standard, and then increasing the neutral current to stabilize the transformer. 133 The unit and the ellipse passing over the Primary School, as per the National Standard. Safely terminal the line without poles and transfer the material to the electrical Huslt Care Hill stowed in a coal dave. 134 Shifting of LT/HT Line Passing over the Composite Vidyalaya 135 Jairamgarh Loading, loading, and unloading of 85 cc ball from Vidyutandar Kendra Mau to Karanochit Vidyalaya Jairamgarh at Substation Dari. 136 Pagi musk for the winged છે loading, cutting, and sawing of ACSR pin conductor for shifting the Rachir and LT lines passing through the school. 137 Loading, handling and unloading of other materials from Power Storage Centre Gau to Composite School Jairaggarh of Sub-Centre Dadi. (Stay Rod 04 No., Stay Wire 20 x 4, Ammonia 15 x 06 -10, Garuda Wire 12 x 12, Pallet-1 5 x 10, Cross Arm 00 No., Disc Insulator without Fitting 06 No., Top Channel 01 No., Draper Channel 01 No., Bera Angle 12 No., Tee Off Channel 00 No., Guarding Angle 00 No., G.I. (Various 6 years, 00:01lo, Mouarvi 10 -805-lo Do olio) 138 Work of digging a pit as per repo standard, tying Rami fittings, and erecting an 8.5 meter PCC pole without all the necessary materials. 139 Work of digging a pit as per repo standard, tying a Rami fittings, and erecting a 6.5 meter PCC pole with all the necessary materials. 140 Laying of wires (ACSR electrical conductors) on poles erected as per RESPO standards, performing jumpering, seginning, and binding. 141 Concreting of poles erected as per RESPO standards. 142 Rural masonry is carried out in the presence of a protective layer on the surface of the earth. 143 Installation of stay-set concrete work including concreting as per RESPO standards. 144 Safely dismantling the 25 kVA transformer installed in the premises of the Composite School, Jairamgarh, as per REPO standards, installing the transformer on a double pole at a new location, earthing the body and neutral, and then energizing the transformer. 145 Safely dismantling the HT and LT lines, including poles, passing over the Composite School, Jairamgarh, as per REPO standards, and safely loading and unloading the output material to the Electricity Store Center, Mau. 148 147 Shifting of LT/HT Line Passing over the P.S. Tadianw. Loading, loading, and unloading of an 85-meter PCC pole from the Electricity Store Center, Mukt, to the Primary School, Tadianw, Substation. 148 Loading, loading, and unloading of ACSA Nijal Conductor from the Electricity Storage Center Gau to the Primary School, Tadiyanch, Substation Tadiyav, to shift the HT and LT lines passing through the school. 149 Loading, loading, and unloading of other materials from the Electricity Storage Center Gau to the Primary School, Tadiyanch, Substation Tadiyav. (2 stay rods, 10 kg stay wire, 6 earthing rods, 12 kg GI wire, 00 nos polymer pin insulators, 70 nos cross arms, 00 nos disc insulators with fittings, 00 nos top channel, 00 nos dropper channel, 00 nos beam angle, 00 nos tee off channel, 00 nos guarding angle, 00 nos GI wire 6 SWG 00 kg, GI wire 10 SWG 00 kg) 150 Work to dig a pit, install raw fittings, and erect an 8.5 meter PCC pole without any other materials as per the response plan. 151 Laying of wire (50 CSR Nijal Conductor) on the poles erected as per RESO standards, performing jumpering, roughing, and binding. 152 153 Concreting of poles erected as per RESO standards. Earthing of water supply as per RESO standards. 154 Installation of stay sets and concreting as per RESO standards. 155 Safely dismantling the HT and LT lines passing over the Primary School, Tadianv, along with the poles, and safely loading and loading the material to the Electricity Storage Center, Gau, as per RESO standards. 156 157 158 Shifting of LT/HT Line Passing over the P.S. Abupur The work of loading, pulling and unloading of primary PCC poles is done from Vidyut Papadar Tejendra-Mal. VIDYA ALSO 410 Loading, transportation and unloading of other materials from Power Storage Centre Gau to Primary School Abbupur of Substation Tadianv (Stay Rod 01 in, Stay Wire 05 Kg, Earthing Rod 01 No., GI Wire 02 Kg, Polymer Pin Insulator 00 Nos. 10 Cross Angle 00 Nos. Wire Insulator without Fitting 00 Nos. Top Channel 00 Nos. Graper Channel 00 Nos., Base Angle 100 Nos., Tee Off Channel 00 Nos., Guarding Angle 00 Nos., GI ARY 6 10-50O 00 poles 9 10 4805ło 00 noullo) 159 Digging a pit as per REPO standards, tying all fittings, including all materials 8. > Mum Paklotto 160 Concreting of poles erected as per REPO standards. The process of earthing the cheeks according to the Risi Manal. The process of leaving the second one according to the Hirane Ranak. The process of leaving the guttes by cutting the Rai Hrips in the air. Shifting of LT/HT Line Passing over the P.S. Dhekwara. Primary School Falyara of the village center Mallich: 66 Mic solver છ રક સરું ૫ વા વા Dega music ane aa dutra-clause a valid he told dots o To shift the Ekhadhi/LT line coming from the school, ABC. 3X95/1X70 1X16 SQ.MM. Kechilaaiika Karma 167 Primary School Denyas of UP, Ladai, Ilai and Karrai Karma work of other Kamdriyas in the village of Gandar Chandra Mau. (Stay Sand 12 No. St Wire 13 406, 41 via on vivid 14 10 todle, name for andolex 10 na cross on 0000 distribution B 168 According to the support mangal, fittings should be applied accordingly, the same material should be 15 V # VY ABC (3X95+1X0+1X16) SQ.MM. Kecil chiller releaser and binding karoon should be done on the cut poly. 170 Cells of the reduced poses according to the cut craze. 971 How do were not at પશ્ચિમ પણ આવ 172 According to the standard According to 173 Permit doga p. vina hath : Rongbir hath Smart 0/LT0 line with pen, safe loading and unloading work to National Electric Gamdar Chandra Mau. 174 Shifting of LT/HT Line Passing over the P.S. Jaigwa 176 176 177 Deeper she mvn pran vi 14 4 5 Goat Junglygseat pole disassembly and crossing work from Yura Mandar Urdu Mau to Up Muhammadabad Primary School Jaigaya passing through a school. ABC ( 3X95+1X70+1X15) SQ, MM. Work of Vijays Dai, Dulai and Satsai for shifting the Anti/LTA line. Logo iske tem -ય. વા પ્રાથમિયા કાસય for the soc omit des, વરું પૂર્વ વર્ક 18 ( 1 to 12 14-13. KG, Earning Road, GI Tyre 06 KG, Polymer Water Insulator 30 Avais Aane 2015 Fitribution Bakt Upendra 80 10) 178. Stocking work with fitting of Karkodkar stone. 179. ABC (3x95+1x70+1x16) sq. mm. 41 on the road standard and the quarry. 180. Configuration work of the closed gates as per the road standard. 161 Bal File & style to all the coll. 182. Installation of He Singh Kahiyasri as per the road standard. 183 184 185. ABC (3x95+1x70+1x16) sq. mm. Bikirnasani work on the gates erected after safely removing the LTSB lamp passing through the Primary School Jaga Kar as per the road standard (40 Godri Shifting of LT/HT Line Passing over the Sanyukt Vidyalya Gulauri. Sayuka Jiyala Muliri of Sanmura a 66 ni 0 indica male award good IS 141 ACSR to relocate the H00/AT line passing through Putini. The work of getting the seal collector brought app. a mo-samay sign 18 MP isse ne ta 12 12 20 kg, Earthing Road 05 mein tayar 10 kg, polymer day insulator 30 Pride get 13#आ Novelly Sitting 104 145 4141 Id !! sin bocan The act of posing. 189 rates standard ranks big The work of jamming, sagging, and riding the wire (ACSR) on the rails. Pornography of the students with the help of 4 letters 181 The question arises as to why the next Tuesday is coming. 192 Overrides and security measures are taken when one or two people are injured. 183 According to the Rest Manak, the 2nd O/Remco of 31 of these schools is passing through the city of Guleri. Goodbye, farewell, and Jati work to the Vidyalaya Pyaar Kendra 184 Shifting of LT/HT Line Passing over the U.P.S. Dangaull The four bullets in the Primary School Halli are 2.5 tons. The Salinito notó váría má 1 má 196 The A00/Rally going from the Electrical Masking Center to Ganji School has been going on for the first time since the schools arrival. The operator has etle yu sêpêt and the Primary School is going to welcome Holi. dge Husly over 14th 8th day of Lok Sangini and loading of 94 items, cargo no. of Ilai and Vasai. Pate Jagar 13 Kg, Earthing Rose 07 Gai Var 08 Kg, Polymer Dig