Repairing the sump leakage of the Cooling Tower, Make: Advance Cooling Tower (250 TR capacity), located at the CCE Service Block terrace. The scope of work includes surface preparation and application of two coats of FRP with resin solution throughout the basin area, as directed by the Engineer-in-Charge (EIC).After completion of FRP application, the agency shall conduct a 24-hour leak test to ensure water tightness.Work also includes all materials, labor, tools, and transportation charges required for satisfactory completion of the job.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.