| 1 | Surface dressing of the ground, including removing vegetation and inequalities not exceeding 15 cm depth and disposal of rubbish, lead upto 50 m and lift upto 1.50 m. b) Hard soil |
| 2 | Earth work in excavation in foundation trenches not exceeding 1.50 m width or 10 Sq.m. on plan or drains not exceeding 1.50 m in width or 10 Sq.m. on plan including dressing of sides and ramming of bottoms, lift upto 1.50 m including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. b) Hard Soil |
| 3 | Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centering and shuttering. |
| 4 | Centring and shuttering including strutting propping etc. and removal of form work for: (a) Foundations and plinth. |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering an shuttering – All work up to plinth level : (a) 1: 1½:3 (1 Cement: 1½ coarse sand derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 6 | Providing and fixing bolts up to 300 mm in length including nuts and washers complete |
| 7 | Steel work in single section including cutting, hoisting, fixing in position and applying a priming coat of red lead paint. C) In Flats up to 10 mm in thickness |
| 8 | Steel work in single section including cutting, hoisting, fixing in position and applying a priming coat of red lead paint. C) In Tees, Angles and Channels |
| 9 | Steel work in single section including cutting, hoisting, fixing in position and applying a priming coat of red lead paint. A) In RS Joists |
| 10 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. A) External work iv) 32 mm nominal outer dia Pipes |
| 11 | Reinforcement of RCC work including bending, binding and placing in position complete. B) Tar/TMT steel |
| 12 | Loading and Unloading of Stone Boulder / Stone aggregates / Sand / Kanker/Moorum/ Lime / Shingle / Earth / Excavated Rock and Kerb Stones by Manual Means for hill roads. |
| 13 | Loading and Unloading of Cement / Steel / Structural / RC Pipe /Wooden Logs / Bricks / Bitumen and Timber etc, by Manual Means and Stacking for hill roads. |
| 14 | Cost of Haulage Excluding Loading and Unloading on hill roads. Haulage of materials by tipper excluding cost of loading, unloading and stacking. (i) Surfaced Road |