Sales : +91-777 804 8217
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 24-12-2025 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 27-12-2025 |
| 2 | 19-12-2025 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 24-12-2025 |
| 3 | 12-12-2025 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 19-12-2025 |
| 4 | 27-11-2025 | 8851_Tech | Other | 12-12-2025 |
| Sl. No. | Item Description |
| 1 | Taking out of the unseviceable / repairable parts from the engine with due care, and supply / fixing of the following new and original spare parts including carrying out all related minor and periodical maintenance works through authorised service Technician as andwhen required suitable for DG SET OF CAPACITY 75- 125 KVA Cumins / KirloskarEngine installed at various E/M installation and all as directed. |
| 2 | LO Filter element. as per existing make and model. |
| 3 | Pre Filter element .as per existing make and model. |
| 4 | Micro Filter Element. as per existing make and model. |
| 5 | Air Cleaner element inner & outer as per existing make and model. |
| 6 | Ditto all as per serial item No 1.00 described here-in-before but for DG set of Cap 20-50 KVA Cumins / KirloskarEngine installed at various E/M installation and all as directed. |
| 7 | LO Filter element. as per existing make and model. |
| 8 | Pre Filter element .as per existing make and model. |
| 9 | Micro Filter Element. as per existing make and model. |
| 10 | Air Cleaner element inner & outer as per existing make and model. |
| 11 | Ditto all as per serial item No 1.00 described here-in-before but for DG Set of Cap 320 KVA Cumins / KirloskarEngine installed at various E/M installation and all as directed. |
| 12 | LO Filter element. as per existing make and model. |
| 13 | Pre Filter element .as per existing make and model. |
| 14 | Micro Filter Element. as per existing make and model. |
| 15 | Air Cleaner element inner & outer as per existing make and model. |
| 16 | M&L for draining out old coolant from radiator completely & changing with new coolant as per required capacity complete all as specified and directed. |
| 17 | M&L for draining out old Kirloskar oil from the Engine completely and changing with new Kirloskar oil (15 W 40) as per required capacity complete all as specified and directed. |
| 18 | M&L for draining out Diesel from the Diesel fuel tank completely and washing the tank completely with diesel and removing all solid waste for 20 to 320 KVA DG set Fuel tank. |
| 19 | M&L for taking out of unservicable Self Starter 12 volt and connected unserviceable portion of electric wiring and carring out repairs and overhauling of the self starter for 25 KVA to 50 KVAengine and replacement of armature, carbon brush, bearing, bendix penion, solenoid switch, bearing, tapping of field coil refixing of all component and fixed in existing postion including testing complete all as directed. |
| 20 | Ditto all as per serial item No 7.00 described here-in-before but for DG of Cap 75 KVA to 125 KVAincluding testing complete all as directed. |
| 21 | M&L for taking out of unserviceable Self Starter 12 volt and supply and fix new Starter for 75-125 KVAengine fixed in existing postion including testing complete all as directed. |
| 22 | Ditto all as per serial item No 9.00 described here-in-before but for DG set of Cap 320 KVA complete all as directed. |
| 23 | M&L for Servicing, Repairing, Phasing and Calibartion of FIP set with specified manufacture\"s instruction for dismantling of FIP, injector nozzles includings connected accessories from 75 KVA to 125 KVA Cumins/Kirloskar DG sets and M/L for carrying out overhauling, calibration and refixing complete and all as specified and directed including change of unsv minor parts. |
| 24 | Ditto all as per serial item No 11.00 described here-in-before but for DG of Cap 320 KVA Cumins/ Kirloskar DG sets complete and all as specified and directed including change of unsv minor parts. |
| 25 | S&F in replacement Automatic voltage regulator (AVR) PCB for 20-50 KVA DG Set |
| 26 | S&F in replacement Automatic voltage regulator (AVR) PCB for 75-125 KVA DG Set |
| 27 | S&F in replacement Automatic voltage regulator (AVR) PCB for 320 KVA DG Set |
| 28 | S&F in repairs reconditioning oflead acid battery of capacity 12 V 80-120 AH complete including replacement of cells/ plates/ terminals and refilling of Distilled water complete all asspecified. |
| 29 | S&F in replacement battery terminal cable of copper conductor 16 sqmm single core (Red & Black) of length not less than 1.5 Mtr with two side clamp complete all as directed. |
| 30 | S&F in replacement of existing u/s DG Control Panel having function to monitor different working parameters such as ON & OFF switch, Test run switch, Emergency stop switch, lubricant oil pressure & temperature display, generator side important parameter such as L-L and L-P Volt, Amps, Hz, RPM, Running Hrs display and other standered parameters required monitoring for safe running of DG set suitable for Silent DG Set of Cap 75-125 KVA including repairing to internal control if required wiring complete all as directed and specified. |
| 31 | Attending break down calls during any abnormality found in DG set engine, alternator, self starter, panel/ AMF panel all electrical and mechanical nature complaints, the same will be attend through skilled technician and rectify in short period. The quoted rate are inclusive of all minor parts like insulation tape, screws, nut bolts, fuses, battery terminal grease etc. |
| 32 | S&F in replacement Digital Panel Meters (VAF + PF) Class-I, RoHS complience, as per IEC 62053-21, suitable for 50 Hz, 3 Phase, 4 wire, 415 V, 80-300 Amp AC/DC, Auto and Mannual Scroll with CT/PT of required ratio as per existing complete all as directed. |
| 33 | S&F in replacement Engine oil Pressure Gauge upto 10 Bar complete all as directed. |
| 34 | S&F in replacement Battery Volt Gauge upto 0-30 Volt complete all as directed. |
| 35 | Disconnecting all incoming and outgoing rubber hose from radiator and drain out checking radiator assemblyand taking down the radiator assemblyfor carrying out servicing, cleaning thoroughly the choke pipe, soldering/ brazing the leakage pipe after completion of above work, reflixing the same to its original position of 75-125 KVA DG sets including replcement of hose pipe of required lenght all as directed . |
| 36 | Ditto all as per serial item No 23.00 described here-in-before but for DG Set of Cap 320 KVA complete all as directed. |
| 37 | Taking downunsv exhaust fan motor for 75-125 KVA DG set capacity installed at various locations cleaning of slots thoroughly, removing all dirt, grease and other unwanted particle, replacement of unserviceable parts where required including exhaust fan blade as specified and directed |
| 38 | Ditto all as per serial item No 25.00 described here-in-before but for DG set of 320 KVA complete all as directed |
| 39 | M&L for repairing of Alternator of DG set Cap 75 KVA from auth service workshop replacement of old burnt winding with copper winding as per existing gauge, varnishing including dismantling from existing position, transporting to workshop, rewinding with super enamelled copper conductor of the same specification as per old one after dismantling, cutting out burnt winding from stator assembly, cleaning slots properly with insulating slots packing, sleeves, papers, reassembling stator & rotor and rectifing any other defect and testing for satisfactory working and refixing at existing DG set complete all as directed. |
| 40 | M&L for repairing of Alternator of DG set Cap 30-50 KVA from auth service workshop replacement of old burnt winding with copper winding as per existing gauge, varnishing including dismantling from existing position, transporting to workshop, rewinding with super enamelled copper conductor of the same specification as per old one after dismantling, cutting out burnt winding from stator assembly, cleaning slots properly with insulating slots packing, sleeves, papers, reassembling stator & rotor and rectifing any other defect and testing for satisfactory working and refixing at existing DG set complete all as directed. |
| 41 | Supply and fix in repair Automatic Battery Charger input 170V to 300V AC and output voltage 12V DC with features automatic selection of FLOAT and BOOST mode complete all as directed. |
| 42 | Dismantling existing defective voltage stabilizer oil immerged type copper wound Auto/ manually controlled 75 KVA capacity as per existing make, AC supply, 3 Phase, 50 C/S input 360 to 450 Volt, Out put voltage stabilizer at 415 ± 1% after disconnecting all electrical connection from panel board for repair and re-assembling the same after carrying out the following jobs including painting with two coats of synthetic enamel paint of approved colour after preparation of surfaces all as specified and as directed including repairs and replacement of following :-(a) Drawing out of transformer oil from tank and storing in proper container and refilling after repair works. (b) Lifting of core with coils and allied accessories after opening top cover and taking out deposited sludge, from core cleaning of tank bottom/ side wall properly. (c) Cutting of burnt out copper coils from three core limbs rewinding three coils with super enameled copper wire of existing gauge and specification including all insulating paper cotton taps, heating varnishing complete. (d) Refixing core with coils in position including all electrical connection as per old circuit diagram (e) Replacement of burnt regulator switch rod - 01 No |
| 43 | Item No. 30.00 contd...(f)Replacement of burnt upper and lower contact point - 08 Nos (g)Replacement ofburnt bakelite separator shutter 03mm thick - 02 Nos (h) Replacement of top cover gasket - 01 No (j) Replacement of incoming & outgoing porcelain bushing complete - 08 Nos (k) Winding & Heating varnishing of dimmer set including replacement of connection copper cable etc - 03 Nos |
| 44 | S&F in replacement of old defective voltmeter 0 - 500 Volt square and flush type 96 x 96mm size with cl 1.5 as per existing size with selector switch for incoming and out going voltage complete all as directed. |
| 45 | S&F in replacement of old defective Ammeter 0-200A square and flush type 96 x 96 mm size with cl 1.5 as per existing size with selector switch for Amps complete all as directed. |
| 46 | S&F in replacement of old defective Frequency Meter 45-55 Hzssquare and flush type 96 x 96 mm size 90 degree Moving coil transducer type 110-440 Volt range as per existing size with selector switch for Amps complete all as directed. |
| 47 | S&F in replacement of old defective Power Factor Meter square and flush type 96 x 96 mm size, 3 Ph3EL, 4W type110-440 Volt range as per existing size with selector switch for Amps complete all as directed. |
| 48 | Supply and filling of fresh (new) transformer oiltopping up the required level in the stabilizer at di-electric strength not less than 45 KV at 3mm gap conforming to IS complete all as specified and as directed. |
| 49 | Dehydration and Filteration of transformer oil of voltage stabilizers and transformer at various pump houses to achieve die electric strength of 45 KV for 2 min at 3 mm gap as per relevant IS with portable filtration plant,testing of the oil for die electric strength before filtration and after filtration shall be conducted and all as directed. |
| 50 | M&L for cleaning of RCC under ground balancing tank (inside) pumping out of entire water from UG sump of 60000 Ltr capacityby pumping out entair water from sump after blocking the inlet and suction line by gunny bags or other suitable arrangement and taking out all the accumulated silt/spoils etc from the base and walls of sump completely and depositing it 50 Mtr away from the sump scrubbing and removing the scaling deposit from the inner surface of the sump and washing properly with bleaching powder mixed with water (1:10) and applying two coats of quick dryinglime wash on inner side and bottom surfaces. Removing blockage of inlet and suction line and painting to the inner steel ladder of tank with 2 coats of synthetic enamel paint over a coat of red oxide primer complete all as specified and directed. Notes :- (a) All necessary T & P, labours and materials will be arranged by the contractor.(b) The above process of cleaning the tanks shall have to be completed by the contractor in max of one day. (c) The quoted rates shall deemed to include for use of cleaning materials as required for the entire completion of work.(d) Protective measures and insurance of labours working in under ground sump shall be the sole responsibility of the contractor and rates quoted shalldeemed to be include for the same. |
| 51 | M&L for cleaning of swimming pool approx 2000 Sq Mtr area of floor tiles, wall tiles, steel ladders and drain complete by using detergent or chemicals, scrubbers and brushes after pumping out of entire water from swimming pool during shutdown period after blocking the all inlets by dry cloth or other suitable arrangement and taking out all the accumulated silt/spoils etc from the floor and walls of pool completely and depositing it 50 Mtr away from the pool scrubbing and removing the scaling deposit from the inner surface of the pool and washing properly with derergent or chemicals on inner side and floor surfaces. Removing blockage of all inlets complete all as specified and directed. Notes :- (a) All necessary T & P, labours and materials will be arranged by the contractor.(b) The above process of cleaning the tanks shall have to be completed by the contractor in max of three days. (c) The quoted rates shall deemed to include for use of cleaning materials as required for the entire completion of work.(d) Protective measures and insurance of labours working in swimming pool shall be the sole responsibility of the contractor and rates quoted shall deemed to be include for the same. |
| 52 | Supply, Stocking, Handling, Shifting and mixing ofTCCA 90 (Swimming pool treatment compound) in granular form having concentration 90% as per the direction of Engr-in-charge to maintain quality of swimming pool water as per SP TI No 3 of 2007 sealedin factoryHDPE container of 45/50 kg each complete all as directed. |
| 53 | Providing services for taking down andRefilling (Loose) of Filter Bed Media (Old Gravel andQuartz sand) inside shell type horizontal pressure filter of cap 3500 gallon of water per hour (approx Size 9 mtr long 3 mtr dia as per existing arrengement and as per standard practices as mentioned belowwithin the stipuilated time period by employing suitable numberes of labour with necessary tool and plant to complete work on or before the stipulated time inside bed complete all as directed :(1) Taking Down & Laying of Media:(i) First Layer with Gravels of size 40mm size upto 300mm thick at the bottom of Bed. (Old Gravel retrieved under this item shall be used) (ii) Second Layer with Gravels of 30mm size upto 300mm thick above the first layer. (Old Gravel retrieved under this item shall be used)(iii) Third layer with Gravels of 20mm size upto 300mm thick above the second layer. (Old Gravel retrieved under this item shall be used) (iv) Forth layer with sand 0.35-0.5mm size upto 600mm aobe the third Layer. Providing services forall as directed. Note : (a) One bed will be handed over at a time to complete said Job. (b) Contractor is responsible to complete the said job within stipulated time period of shutdown by deploying sufficient labour at a time. |
| 54 | M&L for Topping up new sand and Taking out existing spoiled sand, accumulated mud/ quartz sand etc. (Fine filter media) from Pressure filter shell type installed at swimming pools at Binnaguri, topping up required qty of good quality quartz sand andremoving the spoil from site complete all as directed. |
| 55 | S&F Basic Test Kit for residual cholorine and PH with complete box as directed. |
| 56 | S&F Flexible Green colour suction sweeping motor Hose Pipe for suction and delivery in single length 30 Mtr of dia 50 mm with both sides suitable size of clamps including taking down old one. |
| 57 | S&F Suction sweeper Wheel made of hard PVCroller of dia 50 mm, rotating angle 360 degree andstainless steel base plate with four Nos holes for fixing the wheel and height of the wheel from base pate to wheel bottom is 65 mm including taking down old one. |
| 58 | Supply, Stocking, Handling, Shifting and mixing of Crystal Alum food grade as per the direction of Engr-in-charge to maintain quality of swimming pool water as per SP TI No 3 of 2007 sealedin factory container of 25/50 kg each complete all as directed. |
| 59 | Supply, Stocking, Handling, Shifting and mixing of Copper sulphate food grade as per the direction of Engr-in-charge to maintain quality of swimming pool water as per SP TI No 3 of 2007 sealedin factory container of 25/50 kg each complete all as directed. |
| 60 | S&F three phase DOL Starter in sheet-steel enclosure motor rating, 415 V, 50Hz, 3Ph of capacity 3-5 HP, relay range 6- 9.3 A, contactor capacity - 20 A complete including taking down old one all as specified and directed. Make- L&T/ Havells/ BCH or equivalent. |
| 61 | M&L for repairing Cast Iron Foot valve with strainer in two parts 300 mm bore including replacement of moving plate as per existing, rubber gasket, bolts (full threded), nuts & washers complete all as specified and directed including dismantling and taking down of old unserviceable items from existing position. |
| 62 | M&L for electrical disconnection of burnt 3 HP, 3 Phase, 415 Volts, 50 Hz induction motor from main supply, mechanical disconnection from centrifugal pump, opening of bolted joint from base and transporting to nearest repair shop, then rewinding with super enamelled copper conductor of the same specification as per old one after dismantling, cutting out burnt winding from stator assembly, cleaning slots properly with insulating slots packing, sleeves, papers, reassembling stator & rotor after replacement of worn out bearing 6304 at DE & 6305 at NDE inclding painting with two coats of synthetic enamel paints over a coat of red oxide after preparation of motor external surface, then transporting back to installation, fixing, making electrical, mechanical connection & commissioning all as specified and directed. |
| 63 | M&L for electrical disconnection of burnt 30 HP, 3 Phase, 415 Volts, 50 Hz induction motor from main supply, mechanical disconnection from centrifugal pump, opening of bolted joint from base and transporting to nearest repair shop, then rewinding with super enamelled copper conductor of the same specification as per old one after dismantling, cutting out burnt winding from stator assembly, cleaning slots properly with insulating slots packing, sleeves, papers, reassembling stator & rotor after replacementof worn out bearingDE & NDEinclding painting with two coats of synthetic enamel paints over a coat of red oxide after preparation of motor external surface, then transporting back to installation, fixing, making electrical, mechanical connection & commissioning all as specified and directed. |
| 64 | M&L for change of unsv star rubber spider coupling between Induction motor of capacity 30 HP & centrifugal pump all as specified and directed. |
| 65 | M&L for change of unsv star rubber spider coupling between Induction motor of capacity 3 HP & centrifugal pump all as specified and directed. |
| 66 | S&F in replacement of 3 Pole power Contactor MX50, 415V conforming to IS/ IEC 60947-4-1 suitable for 30 HP Pump complete all as directed. |
| 67 | S&F in replacement of Thermal Over load Relay MN5 of range 36-60A sutaible/ direct mounting on 3 Pole power Contactor MX50, 415V conforming to IS/ IEC 60947-4-1 suitable for 30 HP Pump complete all as directed |
| 68 | S&F in repair MCB TP 63 A, 415 V, C series complete all as specified |
| 69 | S&F in repair Electronic Motor Protection relay with in built earth Fault Protection, operating Voltage 230 Volt Thermal Overload Range 16-88 A with inbiult CTs, trip indication, Phase sequence, overload, Locked Rotor, Unbalance Current, Under Current priction as per IEC-60947-4-1 complete all as directed. |
| 70 | S&F in replacement battery terminal clamp complete all as directed. |
| 71 | Attending break down calls during any abnormality found in Washing machine, Dry tumbler and Flat Bed Press including servicing, replacement of defective parts and made functional as per OEM standards for complete as specified and directed by Engr-in-Charge. The same will be attend through skilled technician and rectify in short period. The quoted rate is inclusive of all minor parts like insulation tape, screws, nut bolts and fuses etc. Spare parts should be paid under relavent items. |
| 72 | Temerature Controller |
| 73 | Heating element for washing machine 3000 W |
| 74 | Dryer heating element 2000W |
| 75 | Heat Sensor |
| 76 | Contactor MNX 25, 4 Pole, 415V |
| 77 | V Belt No 101 |
| 78 | V Belt No 66 |
| 79 | Air pressure pipe |
| 80 | Glass wire 2.5 Sqmm |
| 81 | Dryer heating contactor MNX 18 |
| 82 | Double Ball Bearing no-22213KW33 |
| 83 | Pulley set of ExtractorMotor |
| 84 | Spring Set with nut bolt |
| 85 | Door Limit Switch |
| 86 | Main & Counter Bearing Set |
| 87 | S&F in repalcement of Sluice Valve 150mmCl class PN1.6 flanged type, ISI marked with hand wheel Operation, Non raising SS Stem, bronze body seat ring with minor fixing arrengement and accessories complete all as directed. |
| 88 | S&F in repalcement of Sluice Valve 200mmCl class PN 1.6 flanged type, ISI marked with hand wheel Operation, Non raising SS Stem, bronze body seat ring with minor fixing arrengement and accessories complete all as directed. |
| 89 | S&F in repalcement of Non Return Valve 150mmCl class PN 1.6 flanged type, ISI marked swing type with Nitrile Rubber flap with minor fixing arrengement and accessories complete all as directed. |
| 90 | S&F in repalcement of Foot Valve 200mmCl class PN 1.6 flanged type, IS 4038 with minor fixing arrengement and accessories complete all as directed. |
| 91 | Repair /servicing of centrifugalpump Make Kirloskarhaving suction and discharge 100mm x 100mm, coupled with 30 HP induction motor, 415 Volt, 3 Ph, 50 HZ.Repair works comprises with following works : a) Dismantling of pump completely without damging any parts, degreasing and cleaning of parts and setting aside for inspection of serviceabiling parts.b) Re assembling the pump by using existing serviceable parts and replacement of bearings DE/ NDE including Lathe machine work or any other repair required for smooth functioning of pump complete.Note : Parts required for replacement shall be measured and paid seperately under respective BoQ items. |
| 92 | S&F in repair telescopic handle 5 mtr long 25 mm dia made of anodized aluminium and with butterfly nut connection suitable to mount all the accessories like nets and brushes complete all as directed. |
| 93 | S&F in repair deep bag net made from polypropylene and white polyster netting with 1.5\"\" butterfly nut/clip connection and suitable to trap deep pool larger sediments complete all as directed. |
| 94 | S&F in repairs brush 250 mm long in white ABS butterfly nut to fix in telescopic handle for cleaning algae from the pool tiles complete all as directed. |
| 95 | Taking out existing damaged nylon rope 25mm dia from suction sweeper and Supply & fix nylon rope 25mm dia (as per sample) including necessary fixing arrangements as per direction of Engineer-in-Charge. |
| 96 | Supply Only DE & NDE Bearing suitable for induction motor with pump capacity 30 HP Make: Kirloskar, type- UP 100/38Make of bearingNBC, SKF as directed. |
| 97 | Providing services for maintand repairing of Chlorine dosing equipments installed at SP for smooth runningincluding servicing/ repair of pump/ motor of dosing plant, replacement of damaged pipeline and any other minor repair work complete all as directed. |
| 98 | M&L for Earthing complete with GI earth electrode 600x600x6.3mm thick burried directly in ground, earth pit not less than 2.25 mtr below ground level, with top edge of the plate not less than 1.5 mtrbelow normal ground level connected to both end and incl 32x6 mm GI strip 7.5 Mtr long by means of nut and bolts and washers of GI all as shown in electrical plate No 3 and including necessary exec funnel with wire mesh and watering pipe 20mm dia PCC chamber with PCC cover 50mm thick incl testing on completion. Note :- 1) The earthing resistance should be below 3Ω. 2) No payment against material at site will be paid. 3) 100% payment shall be made only after completion in all respect and testing of earthing and production of test results below 3Ω. 4) GI strip beyond 7.5 Mtr long shall be measured and paid sperately.5) Excavation in trenches, hard/dense soil n.exc 1.5m wide and exc 1.5 m in depth and getting out for Earting is included. |
| 99 | S&F in replacement MCCB 160A TP, 415V, adjustable type 36 KA complete all as directed. |
| 100 | S&F in replacement MCCB 200A TP, 415V, Adjustable Type 36 KA including taking down of old u/s MCCB complete all as directed. |
| 101 | S&F in replacement MCCB 630A TP, 415V, adjustable type 50 KA complete all as directed. |
| 102 | M&L for Structure steel in mild steel rolled section connected with each other with welding (angle, tee, channel, beam, hollow sections etc) as in main and cross beams, hip verticle hollow sections and jack rafters, purlins where connected to common rafters and running rails where verticle sections and fixed in welded in wall in wall surface with plates and other verticle sections are fixed in ground level embedded in concrete fixed and horizontal sections fixed in wall and bolted completly, fixed with angle, cleats or other connecting plates conforming to Gde Fe -410-W (Gde E-250) quality-B complete all as specified and directed. |
| 103 | Ditto all as per serial item No 89.00 described here-in-before but plates (plain or chequered channels, square cut or notched (ordinary and counter sunk) forming holes, without any attachement |
| 104 | M&L in repair/ replacement for MS Pipes heavy duty, including specials, Supplied and laid complete, on column incl jointing by means of electric arc welding of nominal dia 150 mm, thickness 5.3 mm for connecting pumping delivery line incl necessary bends, Tees, short pieces, jointing flanges etc.as per site requirement complete all as specified and directed. |
| 105 | M&L in repair/ replacement for MS Pipes heavy duty, including specials, Supplied and laid complete, on column incl jointing by means of electric arc welding of nominal dia 200 mm, thickness 6mm for connecting pumping delivery line incl necessary bends, Tees, short pieces, jointing flanges etc.as per site requirement complete all as specified and directed. |
| 106 | Supply Installation testing and commissioning of retrofit Emission Control Device for 75 kVA desiel generator of any make/vintage.CategoryApplication :- Reduce particulate matter (PM 2.5), Carbon Monoxide and Hydrocarbons emitted from Diesel Engine Technology/ Type :- ESP (Electrostatic Precipitator), Wet Scrubbing, Diesel Oxides Catalyst Guaranteed specified Particulate matter (PM 2.5) Carbon Monoxide, Hydrocarbon reduction efficiency (Min) Guaranteed specified Particulate matter (PM 2.5) Carbon Monoxide, Hydrocarbon reduction efficiency Retrofit device is to be installed in place of existing silencer. No soot is to be collected in the retrofit device. The device including enclosure should include an Oxidation chamber and Passive Regeneration Trap. NOTE: It is mandatory to upload the type approval certificate for suitable KVA RATINGS (ENGINE FAMILY) with registration number & date from one of the CPCB recognized approved lab in Cover – 1 bid with application of tender documents. If contractor failed to upload the same in Cover-1, bid will be rejcted in Cover-1 and financial bid not be opened.” |
| 107 | Item No. 93.00 contd...TEST REPORTSCertification :- Device should be ‘Type Approved’ as per the System and Procedure of Central Pollution Control Board for Emission Compliance Testing of Retro-fit Emission Control Devices (RECD) For Diesel Power Generating Set Engines, Dated 01/02/2022, wide Pollution Control Series PCLS/12/2021-22Adhering to this, RECD to be ‘Type Tested’ for an equivalent kVA family as per the System and Procedure from any one of the four Central Pollution Control Board, Govt, of India, recognized/approved test agencies/laboratories as given below: (a)Automotive Research Association of India (ARAI, Pune)(b)International Centre for Automotive Testing (ICAT, Manesar)(c)Indian Institute of Petroleum (IIP, Dehradun)(d) Vehicle Research Development Establishment (VRDE, Ahmednagar):Back Pressure due to the Emission Control retrofit device :- Maximum back pressure exerted by the Emission Control retrofit device at max prescribed load by DG OEM (as per the capacity of the DG set) should be under limit and display panel to be provided for Back pressure and exhaust temperature limit. |
| 108 | Item No. 93.00 contd... General Technical Requirements (GTR) / Commissioning :- a) Emission Control retrofit device shall be complete with safety precautions to ensure no damage should be done to the DG set operations under any circumstances. The Emission Control retrofit device should be closely coupled with the DG exhaust to ensure 100% of the exhaust passes through the Emission Control retrofit device.b) Anti-Vibration mountings shall be provided for complete Emission Control retrofit device in case of flexible coupling with the diesel generator exhaust.c) Emission Control retrofit device should have protection against under voltage, over voltage, under frequency, over frequency, low battery voltage, over current, earth-fault, short circuit, phase sequence change etc.d) The Emission Control retrofit device shall be with corrosion resistive and HR paint.e) Unloading and placement of the Emission Control retrofit device at the time of delivery is in the scope of buyer. The consignee shall ensure that the site is located along a motorable way.f) The seller shall provide the trial run (Testing) of Emission Control retrofit device. The seller shall conduct trial run of the Emission Control retrofit device with the available electrical load at site. The trial run shall be for TWO hours. The electrical loading shall not be more than the rated capacity of the DG set.g) Exhaust piping, extra civil / Reinforcement work, distribution board and allied acessories shall be provided by the seller |
| 109 | Item No. 93.00 contd... Scope of Installation :-a) Installation of Emission Control Retrofit Device when offered by the vendor is inclusive in the scope of supply and shall be done by the seller. The installation work of Emission Control Retrofit Device.b) Construction of suitable earthing station (if applicable) and necessary connections shall be done by the seller.Warranty/Service ;- 12 monthsNumber of preventive maintenance visits offered in a year during warranty period :- 2 visitsDELIVERABLES, TIME SCHEDULESubmission of approach of work/ methodology, Drawings and the details of team as per the scope of work :- 30 daysDelivery of Device :- 60 daysInstallation, Testing Commissioning at site of retrofit emission control device on existing DG sets :- 90 days |
| 110 | Supply Installation testing and commissioning of retrofit Emission Control Device for 30 kVA desiel generator of any make/vintage.CategoryApplication :- Reduce particulate matter (PM 2.5), Carbon Monoxide and Hydrocarbons emitted from Diesel Engine Technology/Type :- ESP (Electrostatic Precipitator), Wet Scrubbing, Diesel Oxides Catalyst Guaranteed specified Particulate matter (PM 2.5) Carbon Monoxide, Hydrocarbon reduction efficiency (Min) Guaranteed specified Particulate matter (PM 2.5) Carbon Monoxide, Hydrocarbon reduction efficiency Retrofit device is to be installed in place of existing silencer. No soot is to be collected in the retrofit device. The device including enclosure should include an Oxidation chamber and Passive Regeneration Trap. NOTE: It is mandatory to upload the Type approval certificate for suitable KVA RATINGS (ENGINE FAMILY) with registration number & date from one of the CPCB recognized approved lab in Cover – 1 bid with application of tender documents. If contractor failed to upload the same in Cover-1, bid will be rejcted in Cover-1 and financial bid not be opened.” |
| 111 | Item No. 94.00 contd...TEST REPORTSCertification :- Device should be ‘Type Approved’ as per the System and Procedure of Central Pollution Control Board for Emission Compliance Testing of Retro-fit Emission Control Devices (RECD) For Diesel Power Generating Set Engines, Dated 01/02/2022, wide Pollution Control Series PCLS/12/2021-22 Adhering to this, RECD to be ‘Type Tested’ for an equivalent kVA family as per the System and Procedure from any one of the four Central Pollution Control Board, Govt, of India, recognized/approved test agencies/laboratories as given below: (a)Automotive Research Association of India (ARAI, Pune)(b)International Centre for Automotive Testing (ICAT, Manesar)(c)Indian Institute of Petroleum (IIP, Dehradun)(d) Vehicle Research Development Establishment (VRDE, Ahmednagar):Back Pressure due to the Emission Control retrofit device :- Maximum back pressure exerted by the Emission Control retrofit device at max prescribed load by DG OEM (as per the capacity of the DG set) should be under limit and display panel to be provided for Back pressure and exhaust temperature limit. |
| 112 | Item No. 94.00 contd...General Technical Requirements (GTR) / Commissioning :- a) Emission Control retrofit device shall be complete with safety precautions to ensure no damage should be done to the DG set operations under any circumstances. The Emission Control retrofit device should be closely coupled with the DG exhaust to ensure 100% of the exhaust passes through the Emission Control retrofit device.b) Anti-Vibration mountings shall be provided for complete Emission Control retrofit device in case of flexible coupling with the diesel generator exhaust.c )Emission Control retrofit device should have protection against under voltage, over voltage, under frequency, over frequency, low battery voltage, over current, earth-fault, short circuit, phase sequence change etc.d) The Emission Control retrofit device shall be with corrosion resistive and HR paint.e) Unloading and placement of the Emission Control retrofit device at the time of delivery is in the scope of buyer. The consignee shall ensure that the site is located along a motorable way.f) The seller shall provide the trial run (Testing) of Emission Control retrofit device. The seller shall conduct trial run of the Emission Control retrofit device with the available electrical load at site. The trial run shall be for TWO hours. The electrical loading shall not be more than the rated capacity of the DG set.g) Exhaust piping, extra civil / Reinforcement work, distribution board and allied acessories shall be provided by the seller |
| 113 | Scope of Installation :-a) Installation of Emission Control Retrofit Device when offered by the vendor is inclusive in the scope of supply and shall be done by the seller. The installation work of Emission Control Retrofit Device.b) Construction of suitable earthing station (if applicable) and necessary connections shall be done by the seller.Warranty/Service ;- 12 monthsNumber of preventive maintenance visits offered in a year during warranty period :- 2 visitsDELIVERABLES, TIME SCHEDULESubmission of approach of work/ methodology, Drawings and the details of team as per the scope of work :- 30 daysDelivery Of Device :- 60 daysInstallation, Testing Commissioning at site of retrofit emission control device on existing DG sets :- 90 days |
| 114 | S&F in replacement Contactor 400A, TP, AC-3, 2 NO + 2 NC, 451V, conforming to IS 13947 complete all as directed. |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail