Defence Statutory Bodies & Commissions/Committees Closing in 10 days TDR #52486647

Tender For Engineering, Procurement And Construction (Epc) For Augmentation Of Sewage Treatment Work System At Cme Khadki

Issued by Statutory Bodies & Commissions/Committees · Pune, Maharashtra
Tender Value
22.81 Crore
Estimated cost
Bid Submission
08 Oct 2026
10 days left
EMD
13.96 Lakhs
Bank guarantee accepted
Document Fee
3000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Pune → Maharashtra
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender For Engineering, Procurement And Construction (Epc) For Augmentation Of Sewage Treatment Work System At Cme Khadki

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 17-Dec-2025 Date Corrigendum dt 17 Dec 2025 Date 08-Jan-2026
2 31-Dec-2025 Date Corrigendum 31 Dec 25 Date 29-Jan-2026
3 04-Feb-2026 Date Corrigendum 04 Feb 26 Date 26-Feb-2026
4 17-Mar-2026 Date Corrigendum dt 17 Mar 2026 Date 16-Apr-2026
5 03-Mar-2026 Date Corrigendum dt 03 Mar 2026 Date 26-Mar-2026
6 18-Feb-2026 Date Corrigendum dt 18 Feb 2026 Date 12-Mar-2026
7 04-Feb-2026 Date Corrigendum 04 Feb 26 Date 26-Feb-2026
8 20-Jan-2026 Date Date 12-Feb-2026
9 31-Dec-2025 Date Corrigendum 31 Dec 25 Date 29-Jan-2026
10 17-Dec-2025 Date Corrigendum dt 17 Dec 2025 Date 08-Jan-2026
11 20-Jan-2026 Date Date 12-Feb-2026
12 03-Mar-2026 Date Corrigendum dt 03 Mar 2026 Date 26-Mar-2026
13 08-Apr-2026 Date Corrigendum dt 08 Apr 2026 Date 30-Apr-2026
14 17-Mar-2026 Date Corrigendum dt 17 Mar 2026 Date 16-Apr-2026
15 03-Mar-2026 Date Corrigendum dt 03 Mar 2026 Date 26-Mar-2026
16 18-Feb-2026 Date Corrigendum dt 18 Feb 2026 Date 12-Mar-2026
17 04-Feb-2026 Date Corrigendum 04 Feb 26 Date 26-Feb-2026
18 20-Jan-2026 Date Date 12-Feb-2026
19 31-Dec-2025 Date Corrigendum 31 Dec 25 Date 29-Jan-2026
20 17-Dec-2025 Date Corrigendum dt 17 Dec 2025 Date 08-Jan-2026
21 26-May-2026 Amendment-dt-26.05.26 Date 25-Jun-2026
22 22-Apr-2026 Amendment-dt-22.4.26 Date 14-May-2026
23 06-May-2026 Amendment-dt-06.05.26 Date 04-Jun-2026
24 17-Mar-2026 Date Corrigendum dt 17 Mar 2026 Date 16-Apr-2026
25 03-Mar-2026 Date Corrigendum dt 03 Mar 2026 Date 26-Mar-2026
26 18-Feb-2026 Date Corrigendum dt 18 Feb 2026 Date 12-Mar-2026
27 04-Feb-2026 Date Corrigendum 04 Feb 26 Date 26-Feb-2026
28 20-Jan-2026 Date Date 12-Feb-2026
29 31-Dec-2025 Date Corrigendum 31 Dec 25 Date 29-Jan-2026
30 17-Dec-2025 Date Corrigendum dt 17 Dec 2025 Date 08-Jan-2026
31 08-Apr-2026 Date Corrigendum dt 08 Apr 2026 Date 30-Apr-2026
32 16-Jun-2026 Amendment-dt-16.06.26 Date 16-Jul-2026
33 08-Jul-2026 Amendment-dt-08.07.26 Date 06-Aug-2026
34 18-Feb-2026 Date Corrigendum dt 18 Feb 2026 Date 12-Mar-2026
35 08-Apr-2026 Date Corrigendum dt 08 Apr 2026 Date 30-Apr-2026
36 22-Apr-2026 Amendment-dt-22.4.26 Date 14-May-2026
37 17-Mar-2026 Date Corrigendum dt 17 Mar 2026 Date 16-Apr-2026
38 03-Mar-2026 Date Corrigendum dt 03 Mar 2026 Date 26-Mar-2026
39 18-Feb-2026 Date Corrigendum dt 18 Feb 2026 Date 12-Mar-2026
40 04-Feb-2026 Date Corrigendum 04 Feb 26 Date 26-Feb-2026
41 20-Jan-2026 Date Date 12-Feb-2026
42 31-Dec-2025 Date Corrigendum 31 Dec 25 Date 29-Jan-2026
43 17-Dec-2025 Date Corrigendum dt 17 Dec 2025 Date 08-Jan-2026
44 30-Jul-2026 Amendment-dt-30.07.26 Date 27-Aug-2026
45 10-Sep-2026 Corrigendum dt 10.09.26 Date 08-Oct-2026
46 20-Aug-2026 Corrigendum dt 28.8.26 Date 17-Sep-2026

BOQ

Nature of Work:ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) FOR AUGMENTATION OF SEWAGE TREATMENT WORK SYSTEM AT CME KHADKI.
Sl. No. Item Description
1SCHEDULE \"A\" PART-I - BUILDINGS & STRUCTURES INCLUDING INTERNAL & EXTERNAL SERVICES AS DEFINED IN ANNEXURE I TO III Note: This schedule is not pre-priced by MES and the rate indicated as \"Rs 0.00\" under Col 6 signifies this fact only
2Engineering, Procurement & Construction (EPC) of entire scheme of Sewage Treatment Plant (STP) of 3 MLD capacity at CME Khadki, SCADA Compatible including all civil infrastructure, electrical, mechanical, control, instrumentation works and other allied equipment for STP as per OEM recommendation based on latest technology to achieve the parameter as mentioned in scope of work ; along with its earthwork excavation and including all external & internal water and electric supply services beyond transformer for satisfactory running of plant includingcomprehensive maintenancefor 05 years (including 2 years of Defect Liability Period) from the date of completion of works .
3NOTES:(a) The design wherever applicable should follow latest CPHEEO Manual, NGT, State Polution Control Board guidelnes, latest policy directions issued E-in-C\"s BranchPolicy No 03/ 2025 Issued vide letter No. A/95533/SCADA Sewage/Poi/E2W (PPC) dt 16 Jul 2025.(b) The bidder shall also consider BOQ (Sch \"A\") Notes and all internal & external services as defined in Annexure-I to III complete as detailed in scope of work and other documents of tender, complete all as specified and directed.
4SCH \"A\" PART-IITO IX:Note: These schedules are pre-priced by MES and the rate indicated as \"Rs 0.00\" under Col 6 signifies this fact only
5Total amount of Sch ‘A’ Part II (Roads and Hard Standing )
6Total amount of Sch ‘A’ Part III (Area Drainage)
7Total amount of Sch \"A\" Part-IV(Sewage Line)
8Total amount of Sch ‘A’ Part V(Fencing and Gate)
9Total amount of Sch ‘A’ Part VI (External Water Supply)
10Total amount of Sch ‘A’ Part VII (External Electric Supply)
11Total amount of Sch ‘A’ Part VIII (Demolition/ Dismantling)
12Total amount of Sch ‘A’ Part IX (Site Clearance, Excavation & Earthwork)
13SCHEDULE \"A\" PART-X (MISC B/R AND E/M WORKS) Note: This schedule is not pre-priced by MES and the rate indicated as \"Rs 0.00\" under Col 6 signifies this fact only.
14Providing and making necessary arrangments for Bailing out, pumping out or otherwise removing all water which may accumulate including use of required pumpsets of capacity 5 HPetc., complete from excavated trenches of any depth and description but not exceeding6 m deep of excavation,all as specified and directed. (GE shall order this itemorder in writing citing source of water as per SS
15Removing building materials not exceeding 1.5 Km and depositing where directed including levellig, filling etc. all as directed.
16Supply, installation, testing commisioning of Centrifugal pump sets for treated water supply assembled and tested for rated efficiency complete with energy effiency motor conforming to IS -12615, Horizontal split casing single stage pump for liquid clear water at 40\"C Temp specfic gravity 1.0, capable of discharging water at 2812 LPM at 45 m head (Capacity of motor not less than 50 HP), MOC-Cl Std Cl Bronze lmpller, CS shaft directly coupled with suitable induction motor 3 phase 415 V, 50 cycle, SQ cage, IE-2 with MS base plate, coupling guard mounted of MS channel common base plate and fixed with suitable bolts grouted in P.C.C foundation in PCC (1:2:4) type B-1 using 20 mm graded stone aggregate, 30 cm above floor level including PVC insulated unsheated copper cable of suitable size 3 core multi stranded in PVC conduit for connection from starter to motor with proper lugs thimbles etc all as directed.Make: Crompton/ KSB/ Kirloskar
17S&F Non Return Valve Flanged End Gasket- Natural Rubber Flange Drilling of class 1.6 PN supplied and installed complete of size 250 mm (10\") dia all as specified and directed.
18S&F Foot Valve Flanged End Gasket- Natural Rubber Flange Drilling of class 1.6 PN supplied and installed complete of size 250 mm(10\") dia all as specified and directed.
19Providing and supplying ISI standard D.I. specials & fittings with sealing rubber gasket of S.B.R., complete with cast iron follower gland and M.S. nut & bolts coated or otherwise protected from rusting and suitable for D.I. pipes including cost of all labours and materials and transportation to stores/site, loading, unloading etc., complete all as specified and directed.
20Supply, installing, testing and commissioning , factory made and tested CPRI approved L T panel board out door type, hood on top, weather, vermin proof, platform mounted, suitable for 415 Volts, 3 Phase 4 wire 50 Hz AC supply system all as specified and directed with necessary bus bar arrangement with insulated aluminium bus bar 200 Amps rating installed on porcelain insulators housed in separate bus chambers covered with heat shrinkable sleeves with necessary bus bar tappings, copper control wiring of required size, the panel shall be dust and vermin proof, IP-54 class protection and made of 3 mm CRCA mild steel with 40 x 40 x 6 mm angle iron frame, angle iron support of 40x40x6mm with 0.6 m above ground level and 0.4 m grouted in ground/PCC floor with necessary earthwork excavation hinged doors, front & rear opening and locking arrangement (inc!uding provision of 65 mm Godrej{freedom)lock with 2 keys) and duly powder coated on the out side and inside including provision of PCC platform 100 mm thick with PCC 1:4:8 type D-2 using 40 mm graded aggregate one metre around the panel board, cable gland and lugs for incoming and outgoing cable etc., independent chambers to accommodate complete all as specified and directed including the following accessories:-
21(a)4 pole MCCB 100 Amps 25 KA - 01 No (incoming)(b)4 pole MCCB 63 Amps 16 KA - 02 Nos(Outgoing)(c)Bus bars of Aluminium strip of 200 Amps current rating suitable for panel(d)Mains Indicating lamps with selector switch - 3 Nos.(e)Digital Ammeter 0 to 100 Amps with selactor switch(f) Digital Voltmeter 500 Volts with selector switch
22M & L Construction of valve chamber of brick masonryof size 0.9 m x 0.9 m x 0.9 m (internal dimension) with 75 mm thick foundation using PCC 1:3:6 type C-2 (using 40mm graded stone aggregate) over 15cm thick hardcore, 20 cm thickPCC solid block masonty type C built in cement and sand mortar (1 :4), 15mm thick internal and external plaster including top of floor in cement and sand mortar 1:3 finished even and smooth without using extra cement, 3.15 mm thick MS sheet cover with 50mm x 50mm x 6mm MS angle frame embeded in PCC 1:2:4 type B-1 (using 20mm graded stone aggregate) coping having rectangular hinged opening of size with locking arrangements & handle made out of 25cm dia MS round bar, hold fasts etc and applying one coat of red oxide primer and two coats of synthetic enamel paint to all steel surface including excavation and earth wotk in any type of soil and disposal of surplus soil to a distance n.exc 50m complete all as specified.and directed.
23M&L Boring of holes under road, pavement, hard standing by trenchlesstechnology using ultra sounding technique and necessary machine including HOPE pipe of 150 mm nominal dia suitable· for 0.4 mpa working pressure for encasing complete all as specified and as directed.
24S&F Sluice valves of 250 mm bore, class PN-1.6 cast iron body with forged brass spindle non rising type and cast iron wheel head both end flanged IS -14846 marked complete with neoprene rubber gas kit joint bolts ,( high tensile) and nut washer etc, complete all as specified anddirected.
25Material and labour for laying D.I.-K9 class pipe with intemal cement mortar lining and external zinc and bitumen coated pipes conforming to IS 8329:2000 with all required D.I. fitting complete with flanged joint all as specified and directed for the following sizes:-
26(a)300 mm nominal bore of pipe.
27(b)250 mm nominal bore of pipe.
28(c)100 mm nominal bore of pipe.
29S&F Cast lron Air release valve 50 mm dia with two air outlet and fixing up on water supply main (with cap) complete with bolt, nut, rubber insertation etc,complete all as specified andas directed.
30S&F Drop out expulsion fuse HT 11 KV grade rating up to 50 Amps mounted on insulator and steel frame complete all heavy fuse barrel with fuse element complete conforming to IS 1818 as specified and as directed. Make: ATlAS. PACTIL, UNIVERSAL
31Manning and Operationof Sewage Treatment Plantsincluding continuous operation of all associated installations, pumps, blowers, valves, electrical panels, instrumentation, and civil structures; supply of all required consumables, chemicals, lubricants, and spares; routine, preventive, and breakdown maintenance; maintaining records and laboratory testing with three shifts of 8 Hours per dayincluding Sunday & Holiday by employing one skilled operator and one helper per shift and maintaining desired level of BOD,COD,TSS,TKN&pH by dosing or required quantity of chemical as per OEM reccomendation for 05 years (including 02 years of Defects liability period) after completion of mile stone 2complete all as specified in Particular Specifications and as directed by the Engineer-in-Charge.
32All a per BOQ item No 11.40for 11 Month after completion of Mile stone 2
33All a per BOQ item No 11.40for 11 Month after completion of Mile stone 3
34All a per BOQ item No 11.40for 11 Month after completion of Mile stone 4
35All a per BOQ item No 11.40for 11 Month after completion of Mile stone 5
36All a per BOQ item No 11.40for 11 Month after completion of Mile stone 6
37All a per BOQ item No 11.40for 5 Month after completion of Mile stone 7
38Manning and Operationfor maintain and cleaning of entire sewerage network connected to the STP including manholes, inspection chambers, sewer lines, and pumping stations; desilting, flushing, safe disposal of sludge/silt at specified locations; maintaining proper flow and hygiene of Sewage Treatment Plants with two shifts of 8 Hours per dayincluding Sunday & Holiday by employing one Sewage maintenance worker for 05 years (including 02 years of Defects liability period) after completion of mile stone 2complete all as specified in Particular Specifications and as directed by the Engineer-in-Charge complete all as specified and directed.
39All a per BOQ item No 11.50for 11 Month after completion of Mile stone 2
40All a per BOQ item No 11.50for 11 Month after completion of Mile stone 3
41All a per BOQ item No 11.50 for 11 Month after completion of Mile stone 4
42All a per BOQ item No 11.50 for 11 Month after completion of Mile stone 5
43All a per BOQ item No 11.50for 11 Month after completion of Mile stone 6
44All a per BOQ item No 11.50 for 5 Month after completion of Mile stone 7

AI Tender Summary

OUR REF NO 52486647
AUTHORITY Statutory Bodies & Commissions/Committees
TENDER VALUE 22.81 Crore
LAST DATE 08-10-2026
Authority
Authority Name Military Engineer Services
Work Description Tender For Engineering, Procurement And Construction (Epc) For Augmentation Of Sewage Treatment Work System At Cme Khadki
Basic Detail
Tender No 84632
Bidding Type Tender
Location
City Pune
State Maharashtra
Key Dates
Publish Date 10 Sep 2026
Submission Date 08 Oct 2026
Open Date 15 Oct 2026
Finance
Tender Value 22.81 Crore
Tender Fee 3000
EMD 13.96 Lakhs
Exemption Available
Document List
68970188-f802-4b99-b069-a281df4496c7.html
84632STPCME.pdf
BOQ_829082.xls
CEPZ-2025-KK-SK-02-SH-01-_1.pdf
TDset1.rar
TDset2.rar
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 10, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jan 08, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 29, 2026
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Completed
Feb 26, 2026
18:00 IST

Corrigendum-3 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 16, 2026
18:00 IST

Corrigendum-4 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 26, 2026
18:00 IST

Corrigendum-5 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 12, 2026
18:00 IST

Corrigendum-6 Issued

Clarifications on tender conditions and amendments issued.

Completed
Feb 26, 2026
18:00 IST

Corrigendum-7 Issued

Clarifications on tender conditions and amendments issued.

Completed
Feb 12, 2026
18:00 IST

Corrigendum-8 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 29, 2026
18:00 IST

Corrigendum-9 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 08, 2026
18:00 IST

Corrigendum-10 Issued

Clarifications on tender conditions and amendments issued.

Completed
Feb 12, 2026
18:00 IST

Corrigendum-11 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 26, 2026
18:00 IST

Corrigendum-12 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 30, 2026
18:00 IST

Corrigendum-13 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 16, 2026
18:00 IST

Corrigendum-14 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 26, 2026
18:00 IST

Corrigendum-15 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 12, 2026
18:00 IST

Corrigendum-16 Issued

Clarifications on tender conditions and amendments issued.

Completed
Feb 26, 2026
18:00 IST

Corrigendum-17 Issued

Clarifications on tender conditions and amendments issued.

Completed
Feb 12, 2026
18:00 IST

Corrigendum-18 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 29, 2026
18:00 IST

Corrigendum-19 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 08, 2026
18:00 IST

Corrigendum-20 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 25, 2026
18:00 IST

Corrigendum-21 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 14, 2026
18:00 IST

Corrigendum-22 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 04, 2026
18:00 IST

Corrigendum-23 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 16, 2026
18:00 IST

Corrigendum-24 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 26, 2026
18:00 IST

Corrigendum-25 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 12, 2026
18:00 IST

Corrigendum-26 Issued

Clarifications on tender conditions and amendments issued.

Completed
Feb 26, 2026
18:00 IST

Corrigendum-27 Issued

Clarifications on tender conditions and amendments issued.

Completed
Feb 12, 2026
18:00 IST

Corrigendum-28 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 29, 2026
18:00 IST

Corrigendum-29 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 08, 2026
18:00 IST

Corrigendum-30 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 30, 2026
18:00 IST

Corrigendum-31 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 16, 2026
18:00 IST

Corrigendum-32 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 06, 2026
18:00 IST

Corrigendum-33 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 12, 2026
18:00 IST

Corrigendum-34 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 30, 2026
18:00 IST

Corrigendum-35 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 14, 2026
18:00 IST

Corrigendum-36 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 16, 2026
18:00 IST

Corrigendum-37 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 26, 2026
18:00 IST

Corrigendum-38 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 12, 2026
18:00 IST

Corrigendum-39 Issued

Clarifications on tender conditions and amendments issued.

Completed
Feb 26, 2026
18:00 IST

Corrigendum-40 Issued

Clarifications on tender conditions and amendments issued.

Completed
Feb 12, 2026
18:00 IST

Corrigendum-41 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 29, 2026
18:00 IST

Corrigendum-42 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 08, 2026
18:00 IST

Corrigendum-43 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 27, 2026
18:00 IST

Corrigendum-44 Issued

Clarifications on tender conditions and amendments issued.

Completed
Oct 08, 2026
18:00 IST

Corrigendum-45 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 10 days
Sep 17, 2026
18:00 IST

Corrigendum-46 Issued

Clarifications on tender conditions and amendments issued.

Completed
Oct 08, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 10 days
Oct 15, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 17 days

Tender Documents

Download All (ZIP) ↓
html

68970188-f802-4b99-b069-a281df4496c7.html

pdf

84632STPCME.pdf

xls

BOQ_829082.xls

pdf

CEPZ-2025-KK-SK-02-SH-01-_1.pdf

rar

TDset1.rar

rar

TDset2.rar

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders