| 1 | Earthwork: Excavation in foundation etc, in ordinary soil (Loom, Clay er Sand) including lift. upto 1.5 m lead upto 50m including filling watering and ramming of excavated earth its the trenches or into the space between the building and the sides of foundation as directed by Engineer in-charge with lead of 50 m2 (PWD SOR 2023-24 51 No-1/2.6(2.6.1)) CH |
| 2 | Providing and laying in cement concrete in 8:4:1 (stone ballast (40 mm nominal size): 4 approved coarse sand. I coment and caring complete, (PWD SOR 2023-24 S1.No-1/4.1.5) Ch-5 including cost of formwork in foundation and floors. |
| 3 | Class-150 brick work 1:4 (1 cement 4 course sand) in Foundation & Plinth including supply of all material, labour, T&P etc. required for proper 4 completion of work. (PWD SOR 2023-24 5.1 No. 1/6.1.1) C |
| 4 | ftrick work with common burnt clay (non modular) bricks of class-150 10 superstructure above plinth level up to floor V level in all shapes and sizes Cement mortar 1:4 (1 cement: 4 course sand). 5 (PWD SOR 2023-24 S.1 No. 2/6.4.1) Ch-6 |
| 5 | RCC work with cement approved coarse sand and 2cm (3/4\")gauge approved stone ballast in the proportion 1:1.5:3 (1 cement: 4% aggregates) in lighter beams having span upto 6m including bending of reinforcement and binding with 24 BWG GI binding wire and necessary centering & shuttering excluding 201511.2502-2022 |
| 6 | Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-5000 or more. 7 (FWD SOR 2023-24 SL.No-20/5.22.6) Ch-5 |
| 7 | 12 mm thick plaster with cement and Coarse sand of 2.25 F.M. mortar 14 in single coat on fair side of single or half brick wall surface including internal rounded angles, chamfers no exceeding 80 mm in girth and finished even and 8 smooth (PWD SOR 2023-24 SL.No-2/13.4.1) Ch-13 |
| 8 | 15 mm cement plaster on rough side of single or half brick wall of mix: 1:3 (1 cement: 3 coarse sand)(PWD SOR 2023-24 SL.No-5/13.8.1) Ch-13 |
| 9 | Mild Steel or Iron Work of small Size and sections such as holding down bolts, holdfast, tie rods, grating, etc( when not included in an overall rates) wrought to required shape as necessary for bending etc including supply of steel and its wastage including cost of bolts, nuts if required for and welding.grinding and making holes as required for completion of work. (PWD 10 SOR 2023-24 SL.No-1/10.21 Ch-10 |
| 10 | Finishing walls with Putty approved brand and manufacture and of required shade on undacorated wall surface to give even shade over including curing and cost of all material, labour, T&P etc. required for proper completion of 11 work (PWD SOR 2023-24 SLNo-30/New) Ch-10 |
| 11 | Finishing walls with exterior emulsion paint (Apex) of approved brand and manufacture and of required shade on undacorated wall surface to give even shade over 1.25 Ltr/10sqm including one coat of primer applid @ 0.75Ltr/10sqm coat curing and cost of all material, labour, T&P etc. required for proper completion of work for two coat. |
| 12 | Painting two coat over priming coat on iron works in small areas or new wood work with one coat of ready mix priming paint and two coat of approved superior quality ready mixed paint of clear synthetic varnish including supply of all material Labour & T&P etc required for proper complete of work paint to be used should confirm to the ISI no 103 1950. (PWD SOR 2023-245L.No-13 Please Enable Macros to View BoQ information |