Sales : +91-777 804 8217
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 17-12-2025 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 24-12-2025 |
| 2 | 02-12-2025 | Date | Date | 17-12-2025 |
| Sl. No. | Item Description |
| 1 | Window / split AC (Section - I) |
| 2 | M & L for Repair / maintenanceof Air conditioner of any type with replacement of defectiveminor spare partssuch as connector, burn contol copper cable, copperthimbles,cutting, grindingand weldingetc or if any other required major components/spares if required to be replaced and afterrepairfixing to its original location complete with making electical connectionand testingcomplete all as specified and directed. Note:-Defective major components/spares if required to be replaced shall be measured as S&F in replacement under respective item 1.02 to 1.34 here-in-after. |
| 3 | Supply and fix repair/replacement compressor Split /window typeAC 1.5 Tontestingcomplete all as specified and directed by Engr-in-Charge. |
| 4 | Supply and fix in repair/replacement compressor Split /window typeAC 2 Ton testingcomplete all as specified and directed by Engr-in-Charge. |
| 5 | Supply and fix in repair/replacement compressor Split /window typeAC 3.5 Ton testingcomplete all as specified and directed by Engr-in-Charge. |
| 6 | Supply and fix in repair/replacement compressor suitable for 11 Ton testingcomplete all as specified and directed by Engr-in-Charge. |
| 7 | Supply and fix in repair/replacement compressor suitable for 15 Ton testingcomplete all as specified and directed by Engr-in-Charge. |
| 8 | Supply and fix in repair/replacementrunning capacitor 36 or 50 + 6 mfd testingcomplete all as specified and directed by Engr-in-Charge. |
| 9 | Supply and fix in repair/replacement starting contactor for split AC of any capacity as per existing sample testingcomplete all as specified and directed by Engr-in-Charge. |
| 10 | Supply and fix in repair/replacement starting relays with overloadsuitablefor Split /window AC as per existing sample testingcomplete all as specified and directed by Engr-in-Charge. |
| 11 | Supply and fix in repair/replacement thermostatas per existing sample for Split /window AC testingcomplete all as specified and directed by Engr-in-Charge. |
| 12 | Supply and fix in repair/replacementair filter as per sample forSplit /window/Tower AC of any capacity testingcomplete all as specified and directed by Engr-in-Charge. |
| 13 | S&F in replacement indoor unit blower motor forSplit AC of any capacity as per existing sample testing complete all as specified and directed by Engr-in-Charge. |
| 14 | Supply and fix in repair/replacement outdoor unit blower motorforSplit AC of any capacity as per existing sample testingcomplete all as specified and directed by Engr-in-Charge. |
| 15 | Supply and fix in repair/replacement swing motor forSplit AC of any capacity as per existing sample testing complete all as specified and directed by Engr-in-Charge. |
| 16 | Supply and fix in repair/replacement swing motor for 11 Ton AC of capacity as per existing sample testingcomplete all as specified and directed by Engr-in-Charge. |
| 17 | Supply and fix in repair/replacement swing motor for 15 Ton ofcapacity as per existing sample testingcomplete all as specified and directed by Engr-in-Charge. |
| 18 | Supply and fix in repair/replacement PVC/aluminium impeller for Split /window AC blowerasper existing sample testing complete all as specified and directed by Engr-in-Charge. |
| 19 | Supply and fix in repair/replacement suction/Discharge service Valve as per sample for Split AC of any type testingcomplete all as specified and directed by Engr-in-Charge. |
| 20 | Supply and fix in repair/replacement Cooling / condenser coil suitable for split type AC of any type testingcomplete all as specified and directed by Engr-in-Charge. |
| 21 | Supply and fix in repair/replacement PCBupto1.5/2.0 Ton withremote as per existing samplefor split type ACtestingcomplete all as specified and directed by Engr-in-Charge. |
| 22 | Supply and fix in repair/replacement PCB3.5 to upto15 Ton withremote as per existing samplefor inverter split type ACtestingcomplete all as specified and directed by Engr-in-Charge. |
| 23 | Supply and fix in repair/replacement 230V, AC, 50Hz, 25 Amp with cyclic timer 3-999 minute programmable interval between two AC (programmable alternate operation of AC-01 and AC-02) AC ON indication for AC-01 and AC-02 power on indication single phase and two input terminal etc testing complete all as specified and directed by Engr-in-Charge. |
| 24 | Supply and fix in repair/replacement indoor unitof split AC 1.5 Ton with heat exchange coil, filter, evoporator motor with blower, PCB with display , swing motor etc testingcomplete all as specified and directed by Engr-in-Charge. |
| 25 | Supply and fix in repair/replacement split AC 1.5 Tonoutdoor unitcondensor coil, condensor motor with blower, compressor , suction & discharge service Valve etc testingcomplete all as specified and directed by Engr-in-Charge. |
| 26 | M & L for disconnecting & taking out of split ACindoor and out door unit by cutting of copper tube and disconnecting of electric cable & shifting of indoor/outdoor unit to another or same locationwith refilling refrigerant gas and fixing & testing after connecting all the parts in position complete all as directed by Engr-in-Charge |
| 27 | Supply and fix in repair/replacement of factory made MS bracket duly painted suitable for split AC outdoor unit of any type including nut & bolt complete all as directed by Engr-in-Charge |
| 28 | M & L for cleaning & washing ofwindow /splitACany type with air blower, brush, chemical, water etc. as required site incl taking down air filter , cleaningand refixing in position of AC testing complete all as specified and directed by Engr-in-Charge. |
| 29 | M&L for finding out the leakage with the pressure test of the condenser or cooling coil of window type AC\"s/splittype AC\"s of 1.5/2.0 ton and dismantling the same for repair, reassembling the same after repair the leakage point by brazing/soldering including charging the gas R-22 or any and testing the AC to the entire satisfaction ofEngineer-in-Charge. |
| 30 | Supply and fix in repair/replacementremote control suitable to existing window /split type ACs (as per sample) testingcomplete all as specified and directed by Engr-in-Charge. |
| 31 | S&F in repair copper tube of size 5/8, 1/4, 12.7, 6.3mm dia for any capacity of split type AC testing complete all as specified and directed by Engr-in-Charge. |
| 32 | Supply and fix in repair/replacement Foam armour for AC copper tubing along with taping complete all as specified and directed. |
| 33 | Supply and fix in repair/replacement complete indoor unit display cardcapacity 1.5 Ton including testingcomplete all as specified and directed by Engr-in-Charge. |
| 34 | S&F in repair split AC flexible drain pipe (PVC BRAIDED hose pipe) of size 15 mm dia, forsplit type ACany capacity complete all as specified and directed by Engineer-in-Charge. (as per sample) |
| 35 | S & Fin replacement ofround PVC insulated stranded copper conductor 3 core 1.0 Sq mm1100 volt grade, connected & testing complete all as specified and directed. |
| 36 | AC PLANT (SECTION-II) |
| 37 | M & L for Comprehensive maintenance forchilling package of (80X3=240TR)Scroll type refrigeration CompressorMake-Voltas Ltd with R407C refrigerant with Microprocessor panel and suction and Discharge control valves including quaterly visits and monthly periodical inspection with any nos of vsits for attending emergency breakdowns of AC Plant during the contract period at approximately equal intervals by the OEM/Authorised dealer and the maintennace programme will proceed as and when required as per the inspection report provided by company reprenstative and servicing of complete power supply system of the AC Plantcomplete all as specified and directed by Engr-in-charge. |
| 38 | Descaling of condenser and chiller tubes to meet the designed specifications of flow of refrigerant in compressor and water in condenser. Descaling will be measured and paid under respective item of this schedule. |
| 39 | Check leakage and shortage of refrigerant in the machines with soap solution and rectify the system defect causing leakage including topping up of refrigerant. Cost of Refrigerant required for topping up will be measured and paid separately under respective item of this schedule. |
| 40 | Carry the proper functioning of microprocessor panel and take the control testquaterly and the report needs to be submitted at the time of RAR. |
| 41 | Monthly Checking for proper working of all Ammeters, voltmeters, Hour mtrs, KWH Mtrs and overload relays etc and replacing the same if found unserviceable |
| 42 | Monthly Cleaning of electrical panels and chiller machine periodically. |
| 43 | Monthly Checking of functioning of water flow switch and interlock in the system. |
| 44 | Monthly Checking of all safety and operating controls for proper functioning and replace if the same is defective for proper sequence of operation of the machine |
| 45 | All the breakdowns including compressor failure will be attended and the visit shall not be counted in periodical inspection. |
| 46 | Monthly Checking ofrefrigerant filter and drier core, replace the same , if found necessary. |
| 47 | Monthly Checking of oil level and oil heater in the system and top-up the oil if found necessary. |
| 48 | Monthly Checking of chilled water flow by checking pressure drop across the chiller |
| 49 | Monthly Checking of evaporator and condenser approach and compare the chilled water temperature at full load with the chilled water temperature control |
| 50 | Seasonal adjustment of controls if required and software upgrade once during the contract period |
| 51 | Inspect entire system for any unusual condition such as noise, vibration etc Contractor should be responsiblefor providing the itemsto the operators such as cotton waste, grease, oil, insualtion tape, temperature record instruments for AC, tool kit Ref Mect , Hand gloves, discharge Rod upto 11000 Volts, pipe wrench up to 300mm, taflon tape, Earth tester, multimeter, tounge tester respectively,fiirst aid kit with standard kit , proper sitting arrangement to operator at installation, torch light with cell , cleaning material etc complete all as directed by Engr-in-Charge |
| 52 | Supply of electrical parts except electrical spares for incoming panel. (Electrical Spares Like:- fuses, incoming electrical controls, cables etc) |
| 53 | Note: for item no 2.01 :- (i) The contractor should carry out servicing throughauthorised dealer of Voltas & not by any local mechanic (ii) The contractor should be responsibleto maintain the AC Plant in serviceable condition for entire contract period & additionalworn out spare parts of chilling water pumps and condenser pumps like couplings, belts, screws/fixing bolts, pipe, refrigerant & condensed water pressure gauges etc if foundunserviceable should be replaced by contractor without any additional cost. (iii) Proper servicing certificate should be produced immediately after servicing(iv) Proper register/log sheet for running of AC Plant should be maintained by the contractor for entire contract period (v) The authorised technician should visit once in two monthsfor preventive maintenance & any no of emergency breakdown. (vi) No addition labour payment shall be entertained for replacement of any exclusive part of plant.(vii) All type of valves including float valve, quick fill valves, drain valves and other associated items like gear box, strainer, eliminators if found faulty will be provided by the contractor at no additional cost (viii) Repairs of FRP Cooling Tower/basin and replacement of HUB, blades of fan, fills, nozzle and distribution channels if found necessary will be done by the contractor at no additional cost (ix) Cleaning the vegetation/ shrubs around the plant upto 30 Mtr area will be the responsibility of the contractor (x) This is type \"A\" AMC i.e. \"ALL IN ALL\" . (XI) Quoted Rate should include repair and Maint before AMC (Pre AMC). (XII) complaints should be attended and rectified in 24 hr otherwise a penalty of rupees 5000.00 Rs per day will be recoverd from the contractor. (XIII)Leakage and seapage due to AC plant removal is sole responsibility of contractor. |
| 54 | Material and labour for maintenance and servicing of the chilled water motor pump assembly complete of cap 10 HP including replacement of all worn out belts of specified size, replacement of motor/gaskets and greasing to moving parts all as specified and directed by Engr-In-Charge |
| 55 | Material and labour for maintenance and servicing of the condensor water motor pump assembly of cap 10 HPincluding replacement of all worn out belts of specified size, replacement of motor/ gaskets and greasing to moving parts all as specified and directed by Engr-In-Charge |
| 56 | Material and labour for maintenance, servicing of motors of AHU\"sof Cap10 HP with blowers including replacement of all worn out belts of specified size, replacement of motor/ gaskets and greasing to moving parts complete all as specified and directed by Engr-In-Charge |
| 57 | Note for item No 3 to 5(a) Check the alignment and conditions of coupling to prevent damage to shaft and impeller.(b) Lubricate bearings with grease guns.(c) Replace gland rope if required.(d) Check lubricant oil level and make up the oil if required.(e) Check packing and mechanical seals for leakage.(f) Half yearlyinspection and service for pumps(g) Inspect shaft sleeves,shaft, bearings, bearing housing and overhauling of all pumps.(h) The impeller and shaft to be repaired and made functional. If they are found not repairable, then same will be replaced .(i) The packing, mechanical seal, bushs, bearings, Shaft sleeves, coupling etc. If found faulty to be replaced by the contractor with out any extra cost. |
| 58 | M&L for taking out & rewinding the existing unserviceable burnt motors of condensor/chillerwater motors of Cap 10 HP,Three phase, 50 cycles by disconnecting electrically and mechanically and transporting to the locally workshop. Dismantlingthemotor and removing the old burnt copper winding & demoisturise, cleaning, rewindingthecoilswith same gauge supper enamelled copper wire, with suitable F class paper insulation, varnishing, andreassembling by replacing bearings reinstalling at the installation andtesting, commissioning etc complete all as specified and directed by Engr-in-Charge |
| 59 | M & L for Cleaning and spray Painting the surface of motors, condenser pipes, chilled water pipes, cable duct supports of angle iron and all other rough surfacesincluding all valves and fittings including pumps and cooling Tower with two coats of synthetic enamel paint of existing colour over a neat coat of redoxide primer over 10 cm width of girth and making good to the surfaces of all pipe and valves connections at certain places all as specified and directed by Engr-In-Charge |
| 60 | Supply and fix in repair of puff insulation as per site requirement for chilled water piping and valves complete all as specified and diected by Engr-in-Charge |
| 61 | M & L for Descaling of condenser tubes required to meet the designed pressure conditions and cooling specifications for desired rate offlow of refrigerant in compressor and water in condenser complete all as specified and directyed by Engr-In-Charge |
| 62 | M & L for Nitrogen Pressure testing for water cooled screw chillers including refrigerant Recovery, vacummising and recommissioning of chillers of condenser tubes required to meet the designed pressure conditions and cooling specifications for desired rate offlow of refrigerant in compressor and water in condenser complete all as specified and directyed by Engr-In-Charge |
| 63 | S&F in repair Refrigerant R 407 C for topping up of refrigerant in the sytem to compensate any leakge qty of refrigerant complete all as specified and directed by Engr-in-Charge. |
| 64 | Supply& fillingCompressor Oil of AC Plant complete all as specified and directed by Engr-in Charge. |
| 65 | S&F in repair thermometers as per site requirement to be fixed in chiller lines and condensor pipe lines complete all as specified and directed by Engr-In-Charge |
| 66 | S&F in repair automatic star delta starters in sheet steel enclosure AC-3 duty, 415 V, 10 HP,with ralay range 15-30 Acomplete all as specified and directed by Engr-In-Charge.Make:- Make- L&T/ ENGLISH ELECTRIC/ STANDARD/ SIEMENS/ CROMPTON GREAVES or equivalent as approved by GE. |
| 67 | Supply & fix in repair Contactor type- MCX13 of AC3 80 Amp, 415V, 50 Hz complete all as specified and directed by Eng-In-Charge. |
| 68 | S&F in repair single phasing preventor, Type-ESP-2, 415 Volt, 50 Hz complete all as specified and directed by Eng-In-Charge. |
| 69 | S&F in repair electronic timer of Make-Ellico or equivalent as approved by GE, Type-S/D-C-100 , 230/415 Volt,Complete all as specified and directed by Eng-In-Charge |
| 70 | M & L for Repairing / Servicing of complete all electric supply panels for AHU Rooms by cleaningall MCCB Connections and Bus barswith anti rust spray, replacing of nuts & bolts,washers, with suitable lugs of burnt/rust contacts & fitting of screws & rewiring with suitable guage copper conductor/flexible wires, all as required as per ground condition, with tightening of all loose connections, with testing complete on load all as directed by Engr-in-charge. |
| 71 | S&F in repair pressure gauges 100 mm dia for condensor water lines and chiller water lines, complete all as specified and directed by Eng-In-Charge |
| 72 | S&F in repair ON load change over switch 4 pole of 400 Amp Capacity withSteel sheet enclosure complete all as specified and directedby Eng-In- Charge. |
| 73 | M & L for Comprehensive maintenance and servicing of VRF air conditioner of model 38VRO16H119015 (out door)and indoor split type-2 nos with refrigerant use R-410A/4.3 Kg, Cap- 15 TR, making servicing of the plants and making fully in serviceable condition of CHOC bldg of 47 SU at Vadsar make Carier air conditioner Note: (i) Spares required for replacement will be included in quoted rates. (ii) The rates quoted by the tenderer includes the cost of complete comprehensive service including as requiredvisit the site at interval of 30 days to verify functioning of AC units till completion of contract as mentioned in Work Order no-1. (iii) Servicing of the plant will be done of interval of 90 days during currrency of contractand when directed by Engr-in-charge. (iv) Servicing/ Repairs of AC units shall be carried out through the OEM only . (v) Contractor has to submit test certificate on completion of service/repairs of AC unitsissued by service provider,contractor is responsible to proper functioning of AC, leakage and seapage repiare is sole responsibility of contracter quoted rates should incl leakage and seapage repaire. (vi) This is Type \"A\" AMC i.e. ALL IN ALL so that spares required will be provided by the contracter with in stipulated time period.(vii) Complaints should be attended and rectified in 24 hr otherwise a penalty of rupees 2000.00 Rs per day will be recoverd from the contractor. |
| 74 | Comprehensive maintenance and servicing of Ductable air conditioner of make Bluestar(out door)and indoor split type-2 nos with refrigerant use R-410A/4.3 Kg, Cap- 11 TR/10HP, making servicing of the plants and making fully in serviceable condition of Arjan Hall at vadsar make Bluestar air conditioner Note: (i) Spares required for replacement will be included in quoted rates. (ii) The rates quoted by the tenderer includes the cost of complete comprehensive service including as requiredvisit the site at interval of 30 days to verify functioning of AC units till completion of contract as mentioned in Work Order no-1. (iii) Servicing of the plant will be done of interval of 90 days during currrency of contractand when directed by Engr-in-charge. (iv) Servicing/ Repairs of AC units shall be carried out through the OEM only . (v) Contractor has to submit test certificate on completion of service/repairs of AC unitsissued by service provider,contractor is responsible to proper functioning of AC, leakage and seapage repiare is sole responsibility of contracter quoted rates should incl leakage and seapage repaire. (vi) This is Type \"A\" AMC i.e. ALL IN ALL so that spares required will be provided by the contracter with in stipulated time period.(vii) Complaints should be attended and rectified in 24 hr otherwise a penalty of rupees 2000.00 Rs per day will be recoverd from the contractor. |
| 75 | WATER COOLER (Section - III) |
| 76 | M & L for Repair / maintenance / ServicingofWater coolers of any type with replacement of defectiveminor spare partssuch as connector, burn contol copper cable, copperthimblesetc or if any other required minor sparesatAF Stn Wadsar including taking out old u/swater coolerwith disconnecting electrical / mechanical connection and transporting to workshop for repairing if reqd & testing after repair entire satisfaction of Engineer-in-Chargeand transporting back , fixing to its original location complete with making electical connectioncomplete all as specified and directed. Note:-Defective major components/spares if required to be replaced shall be measured as S&F in replacement under respective item 24.02 to 24.15here-in-after. |
| 77 | S&F in replacement compressorfor 40/80 Ltr capacity water cooler complete all as specified and directed |
| 78 | S&F in replacement compressorfor 60/120 Ltr capacity water cooler complete all as specified and directed |
| 79 | S&F in replacement starting relayfor water cooler ofanytype complete all as specified and directed |
| 80 | S&F in replacement overload Protection for water cooler ofanytype complete all as specified and directed |
| 81 | S&F in replacement running capacitor 10/15/ 20 mfd for water coolerofanytype complete all as specified and directed |
| 82 | S&F in replacement starting capacitor 40/60, 80/100mfd for water coolerofanytype complete all as specified and directed |
| 83 | S&F in replacement push cock copper alloy chromium plated 15 mm bore match to the existing onecomplete all as specified and directed |
| 84 | S&F in replacement fan blade for water cooler blower motor of any type ( as per existing sample) complete all as specified and directed |
| 85 | S&F in replacementblower motor, single phase, 230 voltof any type (as per existing sample) complete all as specified and directed |
| 86 | S&F in replacementthermostatas perexisting sample complete all as specified and directed |
| 87 | S&F in replacement waste water PVC pipe with clamp suitable to existing size complete all as specified and directed |
| 88 | S&F in replacement chromium plated water tray basin for water cooler match to the existing size complete all as specified and directed |
| 89 | Suppy and replacement 15mm dia PTMT float ball valve for water cooler and desert cooler complete all as directed by Engr-in-Charge. |
| 90 | M & L for Repair to water cooler body by replacing worn out metal sheet, with S/S metal sheet and frame of existing thickness at bottom and sideincluding welding/soldering where ever applicable. Painting with one coat of anti corrosive paint and two coats of synthetic paint complete all as specified and directed by Engr-in-Charge. |
| 91 | REFRIGERATORS/DEEP FREEZER (Section - IV) |
| 92 | M & L for Repair / maintenance / Servicingof Refrigerator or Deep freezer of any type with replacement of defectiveminor spare partssuch as connector, burn contol copper cable, copperthimbles,cutting, grindingand weldingetc or if any other required minor sparesat AF Stn Wadsar including taking out old u/sRefrigerator or Deep freezerwith disconnecting electrical / mechanical connection and transporting to workshop for repairing & testing after repair entire satisfaction of Engineer-in-Chargeand transporting back , fixing to its original location complete with making electical connectioncomplete all as specified and directed. Note:-Defective major components/spares if required to be replaced shall be measured as S&F in replacement under respective item 25.02 to 25.17 here-in-after. |
| 93 | S&F in replacement compressor unitfor refrigerator165 to 250 Ltr capacity of any type complete all as specified and directed. |
| 94 | S&F in replacement compressor unitfor Deep freezer400 to 500 Ltr capacity of any type complete all as specified and directed. |
| 95 | S&F in replacement thermostat switchas per samplefor Refrigerator or Deep freezer of any capacity complete all as specified and directed. |
| 96 | S&F in replacementStarting relaywith OLP as per sample for Refrigerator or Deep freezer complete all as specified and directed. |
| 97 | S&F in replacementtimer as per sample for double door refrigerator of any capacity complete all as specified and directed. |
| 98 | S&F in replacementblower motor with fan as per sample for double doorrefrigeratoror Deep freezer of any capacity complete all as specified and directed. |
| 99 | S&F in replacementtransparent vegetable trayas per sampleforany capacity refrigeratorcomplete all as specified and directed. |
| 100 | S&F in replacement Electronic PCB as per sample forany capacity refrigerator complete all as specified and directed. |
| 101 | M & L for charging refrigerant gas R22/R410/R32 inAC compressor and makeup required pressure including brazing and testing complete all as specified and directed. |
| 102 | M & L for charging refrigerant gas R-134a or R-600ain compressor and makeup required pressure including brazing and testing complete all as specified and directed. |
| 103 | S & Fin replacementcapillary tube (copper) match to the existing size & length complete all as specified and directed. |
| 104 | S & Fin replacementfilter flare nipple for refrigerator / deep freezer complete all as specified and directed. |
| 105 | S & Fin replacementfilter flare nipple for water cooler / Acs complete all as specified and directed. |
| 106 | S & F in replacementCopper Pipe ½\" as per sample complete all as specified and directed. |
| 107 | S & F in replacementCopper Pipe ¼\" as per sample complete all as specified and directed. |
| 108 | S & F in replacement copper pipe 5/16\" as per sample for Refrigerator complete all as specified and directed. |
| 109 | DESERT COOLER (SECTION-IV) |
| 110 | M & L for Taking out desert cooler of any size and capacity from existing site for repair with replacement of defectiveminor spare partssuch asPVCwater distributor,tee , bend, elbow, holding clamp, nut, bolt, washer, connector, burn contol copper cable, copperthimblesetc or if any other required minor sparesat Wadsar including transporting to workshop for repairing & testing after repair entire satisfaction of Engineer-in-Chargeand transporting back , fixing to its original location complete with making electical connectioncomplete all as specified and directed. Note:-Defective major components/spares if required to be replaced shall be measured as S&F in replacement under respective item 26.02 to 26.16 here-in-after. |
| 111 | S&F in replacement desert cooler motor 1275 RPM operate in three speed, single phase 230 volt of any capacity as per existing sample complete all as specified and directed. |
| 112 | S&F in replacement anti clock revolving desert cooler blower motorthree speed, single phase 230 volt of any capacity as per existing sample complete all as specified and directed. |
| 113 | S&F in replacement water lifting Water pump single phase 165-250 volts, 18 watt complete or if any as per existing sample complete all as specified and directed. |
| 114 | S&F in replacement honycomb pad set(as per sample) complete all as specified and directed. |
| 115 | S&F in replacement capacitor 4.0 mfd for desert cooler complete all as specified and directed. |
| 116 | S&F in replacement GI sheet front grill with flexible louvers match to existing sizecomplete all as specified and directed. |
| 117 | S&F in replacement GI sheet side grill match to existing sizecomplete all as specified and directed. |
| 118 | S&F in replacement water tankmade out 22 gauge GI sheet match to existing size complete all as specified and directed. |
| 119 | S&F in replacement water cooler body made out 22 gauge GI sheet match to existing size complete all as specified and directed. |
| 120 | S&F in replacement three way speed regulator for desert cooler(as per existing sample) complete all as specified and directed. |
| 121 | S&F in replacement fan blade for desert cooler (as per existing sample) complete all as specified and directed. |
| 122 | S&F in replacement three pin plug with PVC flexible cable lead as per sample for desert cooler complete all as specified and directed. |
| 123 | S&F in replacement PVC flexible pipe 15 mm dia as per sample complete all as specified and directed. |
| 124 | S & F in replacement of wood wool pad set of three (as per sample) complete all as specified and directed. |
| 125 | M & L for Preparation for old painted surface ofdesert coolerexterior includingapplying two coats of approved colour by spray gun and applying one coats of bituminious paint on desert cooler water tank complete all as directed by Engr-in-Charge. |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail