| 1 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement. As per PWD Specification & S.I.No. 253. complete in all respect as per directions of Engineer in charge. (Including Labour Cess but GST will be paid extra as applicable) |
| 2 | Granular Sub-base with Well Graded Material (Table 400.1) (A)By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete. As per MORD Specification & Clause No. 401, 4.1(A)(i) for Grading-I Material, complete in all respect as per directions of Engineer in charge. (Including Labour Cess & Roylty but GST will be paid extra as applicable) |
| 3 | WBM Grading-2Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2. As per MORD Specification & Clause No. 405, 4.7(2)(A) By Manual Means, complete in all respect as per directions of Engineer in charge. (Including Labour Cess & Roylty but GST will be paid extra as applicable) |
| 4 | WBM Grading-3Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3. As per MORD Specification & Clause No. 405(A), 4.7(3)(A) By Manual Means, complete in all respect as per directions of Engineer in charge. (Including Labour Cess & Roylty but GST will be paid extra as applicable) |
| 5 | Brick edging on both sides of the road of first class bricks 8cm. (3\") wide and 12cm. (4.5\") deep laid with mud mortar including labour & supply of bricks finished to the required template and in proper alignment and also including dressing ramming the excavated earth. As per PWD Specification & S.I.No. 765. complete in all respect as per directions of Engineer in charge. (Including Labour Cess but GST will be paid extra as applicable) |
| 6 | Prime CoatProviding and applying primer coat with Emulsion Himcole SS-1 Bulk on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. As per MORD Specification & Clause No. 502, 5.1(i) complete in all respect as per directions of Engineer in charge. (Including Labour Cess & Emulsion but GST will be paid extra as applicable) |
| 7 | Tack CoatProviding and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom, as per MORD Sr. No. 5.2(ii) and Technical Specification Clause 503 Including cost of Bitumen (Including Labour Cess but GST will be paid extra as applicable) |
| 8 | 20mm. Thick open-graded premix carpet20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type C as per MORD Sr.No. 5.9 Case I(I) and Technical Specification Clause 508. Case - I By Manual Means (I) Bitumen (S-90) Including cost of Bitumen (Including Labour Cess but GST will be paid extra as applicable) |
| 9 | Seal CoatSeal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per MORD Sr.No. 5.12 By Manual Case-III-Type c(I) and Technical Specification Clause 510 A. By Manual Means Bitumen (S-90) Including cost of Bitumen (Including Labour Cess but GST will be paid extra as applicable) |
| 10 | Construction of subgrade and earthen shoulder with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables. As per PWD Specification & S.I.No. 253. complete in all respect as per directions of Engineer in charge. (Including Labour Cess but GST will be paid extra as applicable) |
| 11 | Excavation of foundations in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling. Watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of surplush earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches. As per PWD Specification & S.I.No. 251. complete in all respect as per directions of Engineer in charge. (Including Labour Cess but GST will be paid extra as applicable) |
| 12 | Cement concrete with 4 cm gauge approved stone ballast approved coarse sand and cement in propertion of 8:4:1 including supply of all material labour and T&P etc. required for completion of the work. As per PWD Specification & S.I.No. 275. complete in all respect as per directions of Engineer in charge. (Including Labour Cess but GST will be paid extra as applicable) |
| 13 | Class 150 Sub Class \"A\" brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all materials labour and T&P etc. required for the proper completion of the work. As per PWD Specification & S.I.No. 305. complete in all respect as per directions of Engineer in charge. (Including Labour Cess but GST will be paid extra as applicable) |
| 14 | Providing, Laying & fixing of 900 mm dia Hume pipe NP-3 type. As per PWD Specification & S.I.No. 458 -2003 Sr. No. 9. complete in all respect as per directions of Engineer in charge. (Including Labour Cess but GST will be paid extra as applicable) |
| 15 | Laying and fixing of RCC Hume Pipe NP-3 class length 2.50 mtr (labour only) 600 mm dia. As per PWD Specification complete in all respect as per directions of Engineer in charge. (Including Labour Cess but GST will be paid extra as applicable) |
| 16 | Supply and laying of Compacted 40mm gauge brick ballast arround and below hume pipe. As per PWD Specification complete in all respect as per directions of Engineer in charge. (Including Labour Cess but GST will be paid extra as applicable) |
| 17 | Struck Pointing with cement mortor consisting of one part cement and two part of fine sand of 1.25 FM on brick work including supply of all material, labour and T & P etc. required for for proper completion of the work. As per PWD Specification & S.I.No. 574. complete in all respect as per directions of Engineer in charge. (Including Labour Cess but GST will be paid extra as applicable) |
| 18 | Maintenance of constructed road for next five year after completion of work shall be paid. as per GO No 17/2024/lk0-113/23-1-2024-23-1099-113/2023 yksd fuekZ.k foHkkx vuqHkkx&1 fnuakd 16-01-2024 ,oa dk;kZy; izeq[k vfHk;Urk ;krk;kr oxZ yks0fu0fo0 y[kuÅ dk i=kad&3689lh&vks0ih0vkj0,e0lh0@ewy&23&24 fnuakd 17-02-2024- Payment shall be done as per satisfaction of engineer in chage regarding maintenance work carried out by contractor (Including Labour Cess but GST will paid extra as applicable). 1st year Maintenance cost total construction of cost Item No. 1 to 11.6 Rs. 5859650.95 @ Zero percent & for 2nd year @ 0.75% |
| 19 | 3rd Year cost of BOQ @ 1.50 % |
| 20 | 4rth Year cost of BOQ @ 2.25 % |
| 21 | 5th Year cost of BOQ @ 3.00 % Please Enable Macros to View BoQ information |